Evaluation Factors for Award.pdf
PDF 108 KB Posted
- Attached to
- Peterson SFB Air Handling Unit Repair
- Solicitation number
- FA251726Q0024
About this file
This document outlines the evaluation factors and award criteria for a firm-fixed price contract solicitation using a Lowest Price Technically Acceptable (LPTA) award strategy.
The Government will evaluate offers based on three primary factors: Total Price, Technical Acceptability, and Past Performance. Technical Acceptability comprises two subfactors: Salient Characteristics (Acceptable/Unacceptable) and Delivery Lead Time (Acceptable/Unacceptable). Offerors must clearly describe how their proposed equipment meets the stated Salient Characteristics and must provide a guaranteed lead time in their proposals. To be eligible for award, offerors must receive an "Acceptable" rating for both Technical Acceptability subfactors; receipt of an "Unacceptable" rating in either subfactor renders the entire proposal ineligible. An "Acceptable" rating indicates the proposal clearly meets minimum solicitation requirements and demonstrates satisfactory understanding of the Salient Characteristics, while "Unacceptable" indicates failure to clearly meet minimum requirements. Past Performance evaluation occurs only for the lowest-priced technically acceptable offeror, utilizing CAGE code information and searches of the Contract Performance Assessment Reporting System (CPARS) and System for Award Management (SAM); offerors without available past performance records receive a "neutral" rating, which is considered acceptable for award purposes.
The evaluation process begins with pricing review and reasonableness assessment, followed by technical evaluation starting with the lowest-quoted price and continuing until either all quotes are evaluated or two technically acceptable quotes are identified. Award will be made to the offeror with the lowest price among those determined to be technically acceptable. Offers may be rejected if the offeror takes exception to solicitation requirements or demonstrates failure to understand the requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluation Factors For Award
(1) Basis for Award: The Government intends to award a firm-fixed price contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be the Lowest Price Technically Acceptable (LPTA).
(2) Evaluation Factors: The following factors will be used to evaluate offers:
• Factor 1: Total Price
• Factor 2: Technical Acceptability
• Subfactor 1.1: Salient Characteristics: (Acceptable/Unacceptable)
a. Describe how you will provide equipment that meets the requirements described in the Salient Characteristics. Offers shall clearly state how the proposed solution meets each salient characteristic outlined.
• Subfactor 1.2: Delivery Lead Time: (Acceptable/Unacceptable)
a. Lead-time: Proposals must include a guaranteed lead time.
• Factor 3: Past Performance
• Next, the Government will evaluate the lowest evaluated priced technically acceptable offeror for past performance with information gathered via the CAGE code submitted. The Contract Performance Assessment Reporting System (CPARS) may be searched to evaluate past performance, and information may be pulled from the System for Award Management (SAM). In the case of a quoter without a record of past performance or for whom information on past performance is not available on CPARS.gov, or SAM.gov or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter shall be determined to have unknown (or "neutral") past performance. In the context of acceptability/unacceptability, neutral shall be considered "acceptable".
(3) Technical Acceptability: To be eligible for award, an offeror must receive an "Acceptable" rating for both Subfactors 1.1 and 1.2 under the Technical Acceptability Factor. If an offeror receives an "Unacceptable" rating for either subfactor, the entire proposal will be considered Technically Unacceptable and will not be eligible for award.
(4) Evaluation Standards: The Government will evaluate the Offeror's Total Price and Technical Proposal based on the information provided to determine the Offeror's understanding of the requirements and ability to perform the work.
• Acceptable: The proposal clearly meets the minimum requirements of the solicitation and demonstrates a satisfactory understanding of the requirements in the Salient Characteristics.
• Unacceptable: The proposal does not clearly meet the minimum requirements of the solicitation.
(5) Evaluation Process:
a. The Government will first conduct a review of the overall quoted pricing and place the Offerors in order from lowest to highest price. Prices will be evaluated for reasonableness.
Generally, adequate price competition will satisfy the criteria of price reasonableness;
other methods include, but are not limited to, historical prices paid and comparison to the Independent Government Estimate.
b. Beginning with the lowest quoted price, Offeror's technical proposals will be evaluated as "Acceptable" or "Unacceptable" in accordance with the description at "(3) Technical Acceptability" to determine whether it is Technically Acceptable. Technical evaluation will end when either all quotes have been evaluated for technical acceptability or there are two technically acceptable quotes. Only those Offerors whose Technical Proposals are determined to be Technically Acceptable will be considered for award.
c. Award will be made to the Offeror whose offer is determined to be the lowest price and technically acceptable.
d. An offer may be rejected if the offeror takes exception to the solicitation requirements, or if the offeror's proposal indicates that the offeror does not clearly understand the requirements.
File details come from the government source that posted it. Updated .