Request for Information (RFI) Solicitation No. FA251726Q0021
| Question |
| Government Response |
| 1. CLIN 013 Quantity of (1) length of (250 feet) is specified, is this correct or is it intended to provide (1) length of (250 feet) per generator? |
| CLIN 013 should be 500 ft of 500 KCMIL for overall project to be completed in house. |
| 2. CLIN 013 Quantity of (1) length of (250 feet) is specified in total, is this correct or is one cable per phase necessary, or possibly a multi-conductor cable for phasing? |
| CLIN 013 should be 500 ft of 500 KCMIL for overall project to be completed in house. |
| 3. CLIN 013 The XHHW-2 cables specified can be provided, and is wet location rated, but is not typically the wire type used for mobile generator connections. Type SOOW is more typical for this application, is this cable specification the desired cable to be provided? |
| CLIN 013 the desired cable specification is XHHW-2 for 500 KCMIL wire. |
| 4. CLIN 014 Quantity of (1) length of (500 feet) is specified, is this correct or is it intended to provide (1) length of (500 feet) per generator? |
| CLIN 014 will be 250ft of 3/0 for overall project to be completed in house. |
| 5. CLIN 014 Quantity of (1) length of (500 feet) is specified in total, is this correct or is one cable per phase necessary, or possibly a multi-conductor cable for phasing? |
| CLIN 014 will be 250ft of 3/0 for overall project to be completed in house. |
6. CLIN 014 The THHN cables specified can be provided, and is wet location rated, but is not typically the wire type used for mobile generator connections. Type SOOW is more typical for this application, is this cable specification the desired cable to be provided?
CLIN 014 the desired cable specification is THHN for 3/0 wire.
| 7. Will there be a tax exempt certificate provided for this order? |
| No; whoever the contract is awarded to, the contract itself is the tax exemption. |
| 8. No installation costs specified. Shall we include pricing to install any of the generator ATS or accessories? If so please provide details on installations. |
| All installations will be conducted in house. |
| 9. No startup or testing specified. Shall we include any labor costs to start up any/all of the units and/or test them (with or without load)? |
| Testing will be completed in house with load. |