Attachment 2-Salient Characteristics_17 September 2025.pdf
PDF 59 KB Posted
- Attached to
- Bldg 1471 HVAC Upgrade (AMENDMENT 01)
- Solicitation number
- FA251725Q0135
About this file
This document is a detailed pricing template for an HVAC equipment replacement and installation project. The template covers multiple line items including equipment procurement (Air Handling Unit, Condenser between 7.5-10 Ton, Evaporator Coil, Copper Lines), demo/removal of existing HVAC equipment, lead and asbestos abatement testing, and comprehensive installation labor. Additional scope includes electrical labor, refrigerant line work, low voltage wiring, insulation, mounting hardware, electrical upgrades (new service disconnect, wiring, circuit breaker), and Johnson Controls integration. The template is designed to capture quantities needed and associated costs for each line item, with specific technical requirements such as using low global warming potential refrigerant (less than 700 GWP) and ensuring equipment compatibility between components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Item Quantity Needed Cost
Equipment:
Air Handling Unit (compliant w/condenser and evap coil) Condenser (Min 7.5 Ton - Max 10 Ton) Evaporator Coil (compliant w/ condenser) Copper Lines Refrigerant Line Weatherproofing (Insulated Metal Wrapping) Valving Low Global Warming Potential (GWP) Refrigerant (less than 700)
Demo/Removal of HVAC Equipment:
Lead and Asbestos Abatement Testing:
Installation Labor:
Electrical Labor Refrigerant Lines (Removal and replacement) Condensate Drain Line Low Voltage Wiring Insulation Mounting Hardware
Electrical Upgrades:
New Service Disconnect Wiring and Circuit Breaker
Johnson Controls Integration:
Misc. Costs:
Total:
Sheet1
File details come from the government source that posted it. Updated .