This document is a Request for Information (RFI) package for a 53-foot mobile Instrumentation/Command & Control Special Access Program Facility (SAPF) trailer. The RFI provides details on the minimum requirements for the operations area, including a 30-foot by 8-foot compliant space, as well as specifications for storage cabinets and workstations in the mission control room. The related federal contract opportunity is Solicitation FA248624RB004 for a mobile SAPF trailer, issued by the Department of the Air Force Materiel Command Test Center. The RFI states that questions will be accepted no later than 10 days prior to the submission due date, but does not provide any information on the submission deadline or award date.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unclassified

FA248624RB004- Mobile SAPF Trailer

46TS Response Supplements to Contractor Questions

24 July 24

Unclassified 2

53 Ft Mobile Facility Simplified Overview (example)

Tuck-under

Tommy Lift

Operations Area

(ICD-705 Compliant)

General Area

(Unclassified)

Undercarriage Storage/Equipment

Mission Control “Room”SUT “Room”

A C

U n its

Vault Door

Swings into Ops

Area

Not to scale

A C

A C

Operations Area

(ICD-705 Compliant)

General Area

(Unclassified)

Mission Control “Room”SUT “Room”

A C

U n its

Vault Door

Question #1: How much minimum sq. footage is the customer requiring for the General Area, Ops Area, SUT room and the Mission Control Room?

Answer: Only providing Minimum dimensions for the Ops area, which will be no less than 30 linear feet (inside of back door to inside of vault door) x

8’ wide (wall-wall dimension). Customer priority is optimal Ops Area square footage based on final design of General Area since trailer will not be able to utilize slide-out in Ops Area.

Swings into Ops

Area

Minimum Linear Distance = 30 feet

Inner width ~ 8 feet

Minimum Ops Area square footage: 240 sqft

(Desire as much space as possible In Ops Area – will be dependent on final layout/design of General Area and use/size of slideout)

T o p V ie w

S id e V ie w

Slide-out

Not to scale

Not to scale

Operations Area

(ICD-705 Compliant)

Unclassified 4

Question #4: What is the estimated size of Lista Bin/Vidmar Cabinets”

Answer: Single cabinet located in Ops Area. 30” x 28” (floor dimensions) by 59” in height.

Desired or equal 10-drawer unit shown here.

Unclassified 5

Question #5: There is no information stating if there is a need for cabinets above/below counter space in Mission Control “Room”

Answer: In the Mission Control “Room” of the Ops Area, there will be 4 workstations (2 on each side). A single cabinet (3 latching drawers) could be placed under the countertop between the two workstations. Based on final design/layout of monitors, upper cabinets could be installed on wall above monitor that are detachable (without impacting ICD-705 compliance)

W/S

Monitors

Crew

Workstation

Crew

Workstation

➢2 User workstations on each side of the trailer

➢ Single 3-drawer cabinet placed under tabletop between the two workstations

(or placed between two tables, if the tables fold down for storage/transport)

➢Overhead storage (latching doors) mounted on wall above monitors of workstations

➢Cabinets should be mounted with a system that allows for customer to remove them from the wall without impacting ICD-705 specifications for Ops Area.

➢Modular in design (not one single unit)

Vault Door

Removable Storage Compartments

W/S

Monitors

Operations Area

(ICD-705 Compliant)

General Area

(Unclassified)

Not to scale

Unclassified 6

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5