Drawings (1-7).pdf
PDF 9 MB Posted
- Attached to
- RQOO CENTAC 1 Overhaul
- Solicitation number
- FA239625RB006
About this file
These technical drawings depict various mechanical components for an Ingersoll-Rand equipment assembly, including detailed schematics for:
- A bushing-thrust assembly with precise dimensional specifications for bore details, tolerances, and geometric symbols. The drawing includes notes about machining requirements and orientation of thrust faces. 2. A rotor assembly with specific instructions for balancing procedures, impeller assembly torque specifications, and surface treatment guidelines. 3. A venturi air component with 6-inch flanges, designed for full scale operation at 20+/sec of air at 100°F and 740 PSIG, with a ±1% accuracy rating. 4. An immersion heater with explosion-resistant terminal box and detailed electrical connection specifications. 5. A typical oil thermostatic valve connection diagram showing water and oil flow configurations.
The drawings are part of technical documentation for mechanical components, likely related to a Department of Air Force contract for equipment overhaul at Wright-Patterson Air Force Base, with intricate engineering specifications for precision manufacturing and assembly.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5CFM081X261
| 5X160-REV-F |
| 5X1337 |
| 5X1641 |
| 5X1757 |
| 5X1868-REV-A |
| 5X10267-REV-A |
File details come from the government source that posted it. Updated .