About this file

This document is a Questions and Answers (Q&A) file for the RQOO CENTAC1 Overhaul federal contract opportunity. The solicitation (FA239625RB006) is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) and involves an equipment overhaul project at Wright-Patterson Air Force Base with an estimated value between $1-5 million. The solicitation was published on 04.14.2025, with offers due by 05.29.2025.

The Q&A document addresses nine specific requests for information (RFIs) covering technical details such as environmental surveys, lubricant specifications, inspection methods, and equipment requirements. Key clarifications include: no lead or asbestos was observed in previous refurbishments, the government will pay for travel to contractor facilities, magnetic particle inspection must meet industry standards, flange types must match existing equipment, no specific staffing positions are mandated, and there are no Trade Agreements Act (TAA) compliance requirements. The full Centac Centrifugal Compressor Instruction Book will be provided via DoD SAFE link upon vendor request.

View the file

Other files for this federal contract opportunity

Other files attached to RQOO CENTAC 1 Overhaul, newest first.
File Type Posted
Drawings (8-11).pdf PDF
IR CENTAC 2 M79-1658 23 DEC 80.pdf PDF
Drawings (12-34).pdf PDF
Drawings (35-44).pdf PDF
IR Centac Shop Test M79-1658-1668.pdf PDF
Centac Specification and Performance Data.pdf PDF
Drawings (1-7).pdf PDF
IR CENTAC 1 M79-1657 18 DEC 80.pdf PDF
Centac_1_Stage4_5_Piping_2.JPG JPG image
Centac_1_4C_Section_Nameplate.JPG JPG image
Centac_1_Stage4_5_Piping_3.JPG JPG image
Centac_2_Stage4_5_Piping_1.JPG JPG image
Centac_1_4C_Section_6.JPG JPG image
Centac_1_4C_Section_2.JPG JPG image
Centac_1_4C_Section_3.JPG JPG image
Centac_1_Stage4_5_Piping_1.JPG JPG image
Centac_1_4C_Section_1.JPG JPG image
Centac_1_4C_Section_5.JPG JPG image
Centac_1_Stage4_5_Piping_4.JPG JPG image
Centac_2_Stage4_5_Piping_4.JPG JPG image
Centac_2_Stage4_5_Piping_3.JPG JPG image
Centac_1_4C_Section_4.JPG JPG image
Sign in Sheet.pdf PDF
Solicitation - FA239625RB006.pdf PDF
Attach. 1 - SOW - CENTAC 1 Overhaul - 19 Nov 24.pdf PDF
Attach. 3 - Base Acces & Map - 14 Apr 25.pdf PDF
Past Performance Reference List.pdf PDF
Attach. 2 - DBA WD - OH20240081 - 14 Mar 25.pdf PDF
Past Performance Questionaire.pdf PDF
Solicitation - FA239625RB006.pdf PDF
Past Performance Questionaire.pdf PDF
Attach. 3 - Base Access Information & Map - 11 Apr 25.pdf PDF
Attach. 1 - SOW - CENTAC 1 Overhaul - 19 Nov 24.pdf PDF
Attach. 2 - DBA WD - OH20240081 - 14 Mar 25.pdf PDF
Past Performance Reference List.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Synopsis/Solicitation RQOO CENTAC1 Overhaul Q&A’s SAM Notice ID/Solicitation #: FA239625RB006 Published: 04.14.2025 Offers Due: 05.29.2025

Request Prime SDVOB offerors ensure any proposal related questions are submitted at the earliest opportunity as questions submitted after April 30th, 2025, will be considered and answered at the contracting officer’s degression. Offerors are reminded that subcontractor questions must be submitted through the Prime SDVOB.

Q&A’s 04.30.2025

Q. RFI #1: Environmental Survey for Lead and Asbestos Has there been an environmental survey done for potential lead and/or asbestos containing materials on the compressor and associated piping/gaskets? If so, please provide test results. If no, will this be a requirement of this contract to provide testing and remediation of such?

A. The machine was built in 1979. During previous refurbishments no lead or asbestos was observed in any of the components.

Q. RFI #2: RQOO Contractor Facility Visits 3.13 RQOO contractor facility visits.

Shall the contractor include transportation, lodging, per diem costs for RQOO personnel to visit their respective facilities?

A. All travel to contractor’s facility by the Gov’t will be paid by the Gov’t.

Q. RFI #3: Compressor Lubricant Used What lubricant has the compressor been operating on?

A. The oil used in the reservoir is DTE732 and grease used on all grease points is a red high heat rated grease (NLGI #2).

Q. RFI #4: Lubricant Supply Requirement Does the lubricant need to be supplied & changed as part of this scope?

A. Lubrication change is not part of this scope; However, it is the contractor’s responsibility to supply and replace any lubrication lost during refurbishment. It is also the responsibility of the contractor to lubricate per manufacturer’s recommendation for all areas affected, to include the gear couplings.

Q. RFI #5: Magnetic Particle Inspection Method Section 2.3 calls for use of magnetic particle inspection method, which method is required?

A. MPI accomplished along with details and data collected shall be of industry standard.

Q. RFI #6: RJT Ring Joint Flanges Requirement Section 4.5 - Are RJT Ring Joint Flanges required for the new SS Interconnecting piping?

A. Flange types shall match existing.

Q. RFI #7: Staffing Requirements Are any staffed positions required such as SSHO, QA/QC, etc.?

A. No specific staffed positions are required from the vendor. Staffing is only required as is necessary to satisfy the requirements of the contract.

Q. RFI #8: Electronic Copies of Site Walk CD Request for the Government to email out all documents on the CD that was provided at the site walk.

A. Contents of the Site Walk CD have been uploaded to SAM.Gov, Notice ID “FA239625RB006”, as the following attachments:

• Centac Specification and Performance Data

• Drawings (1-7)

• Drawings (8-11)

• Drawings (12-34)

• Drawings (35-44)

• IR CENTAC 1 M79-1657 18 DEC 80

• IR CENTAC 2 M79-1658 23 DEC 80

• IR Centac Shop Test M79-1658-1668

Because of size limitations, document “Centac Centrifugal Compressor Instruction Book” will be sent via DoD SAFE link to interested vendors upon email request to Contract Specialist Mike Hornberger at michael.hornberger.1@us.af.mil.

Q. RFI #9: TAA Compliance Requirement Does the government have a requirement for TAA compliance for any equipment provided to fulfill the scope of work?

A. There are no TAA compliance requirements for any equipment provided to fulfill the scope of work.