| File | Type | Posted |
|---|---|---|
| F2K2AC4066A003_Site_Visit_Q A.pdf | ||
| Revised_Adden._52_212-1.pdf | ||
| 4._AF66.xls | XLS spreadsheet | |
| 6._PP_Info_Form.docx | DOCX document | |
| 7._SCA_WD_2005-2361_Rev_14_(19Jun13).pdf | ||
| 3._PWS-Well20_(01Apr14).pdf | ||
| 2._Adden._52_212-2.pdf | ||
| 1._Adden._52_212-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Estimate
| FOR OFFICIAL USE ONLY | ||||||||
| WELL 20 REPAIR COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 1 | ||||
| CONTRACTOR SIGNATURE | ADDRESS | |||||||
| Kirtland, AFB , New Mexico | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE |
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| MHMV040103 | Texas St, Albuquerque, NM | |||||||||
| UNIT OF | MATERIAL COST OR LUMP SUM | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| GENERAL CONDITIONS | ||||||||||
| 1 | MOBILIZATION | LS | 1 | |||||||
| 2 | SITE SETUP | LS | 1 | |||||||
| 3 | INITIAL TROUBLE SHOOT AND DIAGNOSIS | LS | 1 | |||||||
| 4 | REMOVE CANOPY | LS | 1 | |||||||
| 5 | REMOVE MOTOR*DIS/HEAD | LS | 1 | |||||||
| 6 | REMOVE LINE SHAFT | LS | 1 | |||||||
| 7 | VIDEO WELL INVESTIGATION | LS | 1 | |||||||
| 8 | REMOVE/REPLACE 1/4" SS AIR LINE | LS | 1 | |||||||
| 9 | REMOVE/REPLACE RUBBER CENTERING STABILIZER | EA | ||||||||
| 10 | REMOVE/REPLACE SHAFT BEARINGS | EA | ||||||||
| 11 | REMOVE/REPLACE BOWL BEARINGS | EA | ||||||||
| 12 | REMOVE/REPLACE SUCTION BEARING | EA | ||||||||
| 13 | REMOVE BOWL ASSEMBLY | EA | ||||||||
| 14 | COMPLETE REPAIRS | EA | ||||||||
| 15 | REPLACE BOWLS | EA | ||||||||
| 16 | REPLACE IMPELLER | EA | ||||||||
| 17 | REPLACE WATER PILOT LEVEL TRANSDUCER | LS | 1 | |||||||
| 18 | CLEAN AND PREP EQUIP FOR INSTALLATION | LS | 1 | |||||||
| 19 | INSTALL LINE SHAFT | LS | 1 | |||||||
| 20 | INSTALL DISCHARGE HEAD AND MOTOR | LS | 1 | |||||||
| 21 | WELL DEVELOPMENT | LS | 1 | |||||||
| 22 | DISSINFECT WELL | LS | 1 | |||||||
| 23 | COMMISSIONING / ACCEPTANCE TEST | LS | 1 | |||||||
| 24 | INSTALL CANOPY | LS | 1 | |||||||
| 25 | CLEAN SITE AND DISPOSE OF WASTE | LS | 1 | |||||||
| 26 | DEMOBOLIZE | LS | 1 |
| TOTAL MATERIAL COST | |
| TOTAL LABOR COST | |
| SUBTOTAL | |
| OVERHEAD | % |
| PROFIT | % |
| BOND | % |
| SUBTOTAL | |
| NMGRT |
NOT TO EXCEED TOTAL