4._AF66.xls
XLS spreadsheet 33 KB Posted
- Attached to
- Repair Well#20 Federal contract opportunity
- Solicitation number
- F2K2AC4066A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| F2K2AC4066A003_Site_Visit_Q A.pdf | ||
| Revised_Adden._52_212-1.pdf | ||
| 6._PP_Info_Form.docx | DOCX document | |
| 7._SCA_WD_2005-2361_Rev_14_(19Jun13).pdf | ||
| 3._PWS-Well20_(01Apr14).pdf | ||
| 5._Rpr_Cost_Est.xlsx | XLSX spreadsheet | |
| 2._Adden._52_212-2.pdf | ||
| 1._Adden._52_212-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NO. | ||||||||||||||||||||
| CONTRACTOR TO SEE SPECIFICATIONS FOR ADDITONAL REQUIREMENTS | MHMV040103 | Repair Well #20 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED (# CP) | |||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Note: Specification sections contain detailed requirements for submittals. Contractor Responsible for all submittal requirements listed on this form, as well as all requirements described in specification sections.) | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS - MFR. SPECS | SAMPLES | COLOR SELECTION, CHARTS | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG/ PRODUCT DATA | OPERATING INSTRUCTIONS | TEST DATA - REFERENCES | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | |||||||||||||||||||||
| PROJECT START UP | |||||||||||||||||||||||
| 1 | UTILITY OUTAGE REQUESTS AND PERMITS | 3 | NTP+ 5 D | ||||||||||||||||||||
| 2 | SAFETY PLAN AND HAZMAT PLAN | 3 | NTP+ 5 D | ||||||||||||||||||||
| 3 | LETTER OF SUPERINTENDENT, PROJECT MANAGER | 3 | NTP+ 5 D | ||||||||||||||||||||
| 4 | PERSONNEL AND VEHICLE LIST | 2 | AWARD+ 5 D | ||||||||||||||||||||
| 5 | PROGRESS SCHEDULE | 3 | NTP+ 5 D | ||||||||||||||||||||
| 6 | QUALITY CONTROL PLAN | 3 | NTP+ 5 D | ||||||||||||||||||||
| 7 | SOLID WASTE MANAGEMENT PLAN | 3 | NTP+ 5 D | ||||||||||||||||||||
| 8 | SPILL PREVENTION PLAN | 3 | NTP+ 5 D | ||||||||||||||||||||
| 9 | DISSINFECTION PLAN | 3 | NTP+ 5 D | ||||||||||||||||||||
| TECHNICAL | |||||||||||||||||||||||
| 10 | MSDS FOR ALL CHEMICALS | 3 | NTP+ 5 D | ||||||||||||||||||||
| 11 | REPAIR RECOMMENDATIONS | DIAGNOSIS+ 2 D | |||||||||||||||||||||
| 12 | REPAIR SCHEDULE | 3 | DIAGNOSIS+ 2 D | ||||||||||||||||||||
| 13 | PARTS TO PURCHASE | 3 | DIAGNOSIS+ 2 D | ||||||||||||||||||||
| 14 | AF FORM 996 | 3 | TESTING + 2 D | ||||||||||||||||||||
| 15 | REPAIRS DOCUMENT | 3 | REPAIR COMPLETE + 2 D | ||||||||||||||||||||
| 16 | WARRANTY LETTER | 2 | 5 D PRIOR TO FINAL ACCEPTANCE | ||||||||||||||||||||
| 17 | O & M MANUALS | 2 | 5 D PRIOR TO FINAL ACCEPTANCE |
&CAPPENDIX 20
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT APP: MATERIAL APPROVAL&C
&R&6COMPUTER GENERATED AF 66, OCT 89&
&[1]
Sheet2
Sheet3
File details come from the government source that posted it. Updated .