4._AF66.xls

XLS spreadsheet 33 KB Posted

Attached to
Repair Well#20 Federal contract opportunity
Solicitation number
F2K2AC4066A003
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Well#20, newest first.
File Type Posted
F2K2AC4066A003_Site_Visit_Q A.pdf PDF
Revised_Adden._52_212-1.pdf PDF
6._PP_Info_Form.docx DOCX document
7._SCA_WD_2005-2361_Rev_14_(19Jun13).pdf PDF
3._PWS-Well20_(01Apr14).pdf PDF
5._Rpr_Cost_Est.xlsx XLSX spreadsheet
2._Adden._52_212-2.pdf PDF
1._Adden._52_212-1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION/CONTRACT NO.
CONTRACTOR TO SEE SPECIFICATIONS FOR ADDITONAL REQUIREMENTSMHMV040103Repair Well #20
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED (# CP)
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Note: Specification sections contain detailed requirements for submittals. Contractor Responsible for all submittal requirements listed on this form, as well as all requirements described in specification sections.)CERTIFICATION OF COMPLIANCESHOP DRAWINGS - MFR. SPECSSAMPLESCOLOR SELECTION, CHARTSMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG/ PRODUCT DATAOPERATING INSTRUCTIONSTEST DATA - REFERENCESPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
PROJECT START UP
1UTILITY OUTAGE REQUESTS AND PERMITS3NTP+ 5 D
2SAFETY PLAN AND HAZMAT PLAN3NTP+ 5 D
3LETTER OF SUPERINTENDENT, PROJECT MANAGER3NTP+ 5 D
4PERSONNEL AND VEHICLE LIST2AWARD+ 5 D
5PROGRESS SCHEDULE3NTP+ 5 D
6QUALITY CONTROL PLAN3NTP+ 5 D
7SOLID WASTE MANAGEMENT PLAN3NTP+ 5 D
8SPILL PREVENTION PLAN3NTP+ 5 D
9DISSINFECTION PLAN3NTP+ 5 D
TECHNICAL
10MSDS FOR ALL CHEMICALS3NTP+ 5 D
11REPAIR RECOMMENDATIONSDIAGNOSIS+ 2 D
12REPAIR SCHEDULE3DIAGNOSIS+ 2 D
13PARTS TO PURCHASE3DIAGNOSIS+ 2 D
14AF FORM 9963TESTING + 2 D
15REPAIRS DOCUMENT3REPAIR COMPLETE + 2 D
16WARRANTY LETTER25 D PRIOR TO FINAL ACCEPTANCE
17O & M MANUALS25 D PRIOR TO FINAL ACCEPTANCE

&CAPPENDIX 20

&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT APP: MATERIAL APPROVAL&C

&R&6COMPUTER GENERATED AF 66, OCT 89&

&[1]

Sheet2

Sheet3