This document is a Statement of Work (SOW) for the procurement of a Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit. The vendor is required to procure and deliver one DAMAS kit, which is necessary to support contract C-130 Loading for the AN/TPY-4(V)1 radar.
The SOW specifies that the delivered solution shall be 30" wide, able to hold a weight capacity of 20,000 lbs. per axle, and must interface with C-130 aircraft. The kit shall include various ramp sections, load-up components, wedges, and adjustable stands. The vendor must notify the government 15 business days prior to delivery and deliver the equipment to the CT National Guard 103rd Air Control Squadron. The period of performance is 135 Days After Receipt of Order (ARO), and the points of contact for the project management and logistics are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Q and A.xlsx | XLSX spreadsheet | |
| Shoring SOW Rev6_FINAL.pdf | ||
| DAMAS Kit_Airlift Shoring_Statement of Work_10 Sept 2024.pdf | ||
| DAMAS Kit Airlift Shorting_Statement of Work_.pdf | ||
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Bid Schedule_DAMAS Kit Airlift Shoring.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Description: Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit, Procurement
1. Purpose: The vendor is required to procure and deliver one (1) DAMAS kit. This equipment is necessary to support contract C-130 Loading for the AN/TPY-4(V)1 radar.
2. Period of Performance: 135 Days After Receipt of Order (ARO)
3. Requirement Specifics: Delivered solution shall be 30” wide, able to hold a weight capacity of
20,000 lbs. per axle and must interface with C-130 aircraft. The equipment shall include the following
a. 30” x 94” 20K Ramp Section, Qty. 10
b. 30” x 54” 20K Load Up, Qty. 2
c. 30” x 18” 20K Wedge, Qty. 2
d. 4” tall Ramp Pad, Qty. 4
e. Stand Adjustable 13”-15”, Qty. 2
f. Stand Adjustable 20”-26”, Qty. 2
g. Stand Adjustable 28”-32”, Qty. 2
h. Stand Adjustable 34”-38”, Qty. 2
i. The procured equipment shall include storage cases. Not identified as part of the
DAMAS kit and may be identified as an accessory part number (Qty. 2)
4. Packaging and Delivery Instructions:
Physical Delivery Location:
CT National Guard 103rd Air Control Squadron Building 20, 206 Boston Post Rd. Orange, CT. 06477-3224 Delivery Hours: Monday – Thursday 0700-1600 Delivery Location POC: MSgt Morgan Nairn; Comm: 203-793-2940
5. Special Instructions: The vendor shall notify the government of their intent to ship 15 business days prior to delivery. Notification shall be given to the identified Government POC or the alternate POC.
6. Points of Contact:
- PM: Dan Craig; daniel.craig.3.ctr@us.af.mil
- LG: Jon Willey; jonathan.willey.1@us.af.mil mailto:daniel.craig.3.ctr@us.af.mil mailto:jonathan.willey.1@us.af.mil
File details come from the government source that posted it. Updated .