DAMAS Kit Airlift Shorting_Statement of Work_.pdf
PDF 139 KB Posted
- Attached to
- DAMAS Kit Airlift Shoring
- Solicitation number
- F2BDAP4220A004
About this file
This document is a Statement of Work (SOW) for the procurement and delivery of one Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit to support C-130 aircraft loading for the AN/TPY-4(V)1 radar.
The key details are: The vendor is required to deliver the DAMAS Kit within 135 days of order receipt. The kit must be 30" wide, able to hold 20,000 lbs. per axle, and interface with C-130 aircraft. It includes a Ramp Pedestal and Approach Ramp with storage capability. Delivery is to the CT National Guard 103rd Air Control Squadron in Orange, CT. The vendor must notify the government 15 business days prior to delivery. The contracting agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shoring SOW Rev7_FINAL.pdf | ||
| Q and A.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Q and A.xlsx | XLSX spreadsheet | |
| Shoring SOW Rev6_FINAL.pdf | ||
| DAMAS Kit_Airlift Shoring_Statement of Work_10 Sept 2024.pdf | ||
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Bid Schedule_DAMAS Kit Airlift Shoring.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Description: Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit, Procurement
1. Purpose: The vendor is required to procure and deliver one DAMAS Kit. This equipment is necessary to support contract C-130 Loading for the AN/TPY-4(V)1 radar.
2. Period of Performance: Delivery 135 Days After Receipt of Order (ARO)
3. Requirement Specifics: Delivered solution shall be 30” wide, able to hold a weight capacity of 20,000 lbs. per axle and must interface with C-130 aircraft. The equipment shall include a Ramp Pedestal: Length 18" Width 30" Height 10.5", Approach Ramp: Length 60" Width 30" Height 10.5 with kit inclusive of storage capability (cases).
4. Packaging and Delivery Instructions:
Physical Delivery Location:
CT National Guard 103rd Air Control Squadron Building 20, 206 Boston Post Rd. Orange, CT. 06477-3224
Delivery Hours: Monday – Thursday 0700-1600 Delivery Location POC: MSgt Morgan Nairn; Comm: 203-793-2940
5. Special Instructions: The vendor shall notify the government of their intent to ship 15 business days prior to delivery. Notification shall be given to the identified Government POC or the alternate POC.
6. Points of Contact:
- PM: Dan Craig; daniel.craig.3.ctr@us.af.mil
- LG: Jon Willey; jonathan.willey.1@us.af.mil mailto:daniel.craig.3.ctr@us.af.mil mailto:jonathan.willey.1@us.af.mil
File details come from the government source that posted it. Updated .