Shoring SOW Rev6_FINAL.pdf
PDF 1 MB Posted
- Attached to
- DAMAS Kit Airlift Shoring
- Solicitation number
- F2BDAP4220A004
About this file
This document is a Statement of Work (SOW) for the procurement of a Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit. The vendor is required to procure and deliver one (1) DAMAS kit to support contract C-130 Loading for the AN/TPY-4(V)1 radar. The kit must meet specific requirements, including being 30" wide, able to hold a weight capacity of 20,000 lbs. per axle, and interface with C-130 aircraft. The kit must include various ramp, load up, and stand components. The contractor must deliver the kit within 135 Days After Receipt of Order (ARO) to the CT National Guard 103rd Air Control Squadron in Orange, CT. The government points of contact for this procurement are Dan Craig and Jon Willey.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shoring SOW Rev7_FINAL.pdf | ||
| Q and A.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Q and A.xlsx | XLSX spreadsheet | |
| DAMAS Kit_Airlift Shoring_Statement of Work_10 Sept 2024.pdf | ||
| DAMAS Kit Airlift Shorting_Statement of Work_.pdf | ||
| Combined Synopsis Solicitation_DAMAS Kit Airlift Shoring_signed.pdf | ||
| Bid Schedule_DAMAS Kit Airlift Shoring.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Description: Defense/DOMOPS Airlift Modular Approach Shoring (DAMAS) Kit, Procurement
1. Purpose: The vendor is required to procure and deliver one (1) DAMAS kit. This equipment is necessary to support contract C-130 Loading for the AN/TPY-4(V)1 radar.
2. Period of Performance: 135 Days After Receipt of Order (ARO)
3. Requirement Specifics: Delivered solution shall be 30” wide, able to hold a weight capacity of
20,000 lbs. per axle and must interface with C-130 aircraft. The equipment shall include the following
a. 30” x 94” 20K Ramp Section, Qty. 10
b. 30” x 54” 20K Load Up, Qty. 2
c. 30” x 18” 20K Wedge, Qty. 2
d. 4” tall Ramp Pad, Qty. 2
e. Stand Adjustable 13”-15”, Qty. 2
f. Stand Adjustable 20”-26”, Qty. 2
g. Stand Adjustable 28”-32”, Qty. 2
h. Stand Adjustable 34”-38”, Qty. 2
i. The procured equipment shall include storage cases. Not identified as part of the
DAMAS kit and may be identified as an accessory part number (Qty. 2)
4. Packaging and Delivery Instructions:
Physical Delivery Location:
CT National Guard 103rd Air Control Squadron Building 20, 206 Boston Post Rd. Orange, CT. 06477-3224 Delivery Hours: Monday – Thursday 0700-1600 Delivery Location POC: MSgt Morgan Nairn; Comm: 203-793-2940
5. Special Instructions: The vendor shall notify the government of their intent to ship 15 business days prior to delivery. Notification shall be given to the identified Government POC or the alternate POC.
6. Points of Contact:
- PM: Dan Craig; daniel.craig.3.ctr@us.af.mil
- LG: Jon Willey; jonathan.willey.1@us.af.mil mailto:daniel.craig.3.ctr@us.af.mil mailto:jonathan.willey.1@us.af.mil
File details come from the government source that posted it. Updated .