013111 BLAST SHIELD DISMANTLEMENT--REVISED SOW
2 MB Posted
- Solicitation number
- F1H3AF1012A001
About this file
Scope of Work
Text of this file
GOVERNMENT SCOPE OF WORK
DISMANTLE/REMOVE BLAST SHIELDS
BAEY XX-XXXX
Date: 25 JAN 2010
1. GENERAL SCOPE OF WORK: This project entails the dismantlement/removal of approximately 31 sets of blast shields on the Mass Parking Apron (MPA) on the flightline. Each set of blast shields consists of two separate structures. There are approximately 33 sets of blast shields in total, two sets to remain in place.
2. MAJOR ITEMS OF WORK: Work includes but is not limited to the following items:
2.1. Leave one set of blast shields in place at the T-38 run-up spot. Leave one set of blast shields at spot 16 for U-2 run-up spot. Actual blast shields to be demolished shall be marked by the Government during the site visit. One set of blast shields shall be moved to a location directed by the Government and retained at Beale AFB – storage location TBD.
2.2. The dismantlement/removal of the blast shields on the MPA shall include removal of the bolts that the blast shields are attached to. Upon completion of removal, the apron surface below the blast shields, to include the bolt stubs, shall be smooth and at grade.
2.3. Recycle the scrap metal from the blast shields.
3. WORK RESTRICTIONS: Work area is in a restricted area and work hours from 7:00 A.M. to 6:00 P.M. shall be observed. A Free Zone package (delineating the area where contractor personnel will be granted work-related access) will be requested by 9th Civil Engineering Squadron (9th CE) from the 9th Security Forces Squadron, and the resulting guidelines will be provided to the Contractor within five (5) days from the effective date of the Task Order for this effort.
3.1. As the working area is on the flightline, the contractor shall be required to be briefed/trained on flightline construction/driving procedures by the Airfield Manager. [Said briefing and training is a Government responsibility which must be accomplished within three (3) days from the effective date of the Task Order directing this effort.] A flightline temporary airfield construction waiver will also be required. [Said waiver shall also be requested by and provided to the Contractor by the Government within three (3) days from the effective date of the Task Order.] A burn permit will be required from the Beale AFB Fire Department. [Obtaining the same shall be a Government responsibility; and the completed permit shall be provided to the Contractor by the Government within three (3) days from the effective date of the Task Order.]
4. SUBMITTALS: Prior to the commencement of work the contractor shall provide the following specific documents to the Contracting Officer:
4.1. Safety Plan for Airfield Waiver (an example of the same will be provided to the Contractor by the Government within three (3) days after the effective date of any Task Order for the contemplated effort)
4.2. Risk Assessment for Airfield Waiver (an example of the same will be provided to the Contractor by the Government within three (3) days after the effective date of any Task Order for the contemplated effort)
4.3. Plan for removal of blast shields including bolt removal. Said plan will be provided within five (5) days from Task Order effectivity.
4.4. Assume Lead Base Paint is present and provide a plan for compliance with all applicable requirements
5. DESIRED PERFORMANCE PERIOD: This task must be completed in its entirety by 25 March 2011.
6. INSPECTION AND ACCEPTANCE: Inspection and acceptance of completed effort will be the responsibility of the Government. In this regard, Anissa Williams of 9th CE shall be the responsible inspector. Payment shall be made to the Contractor by the Government upon presentation of a dated Certificate of Completion signed by the Government’s inspector. This individual will also be the point of contact for the Contractor for submittal of questions to the Government in respect of this task. A written record of such questions (and responses) shall be provided weekly to the Contracting Officer.
7. EXCLUSION PERIOD: Not applicable for this project
8. DESIGN REQUIREMENTS: Design requirements have not been developed by the Government for this task. The Government seeks that the task be completed with the requisite care and experience of a dismantlement contractor who is knowledgeable of health, safety, and environmental regulations which may be applicable to the effort; and with due attention to, and compliance with, the plans in respect of this task that have been submitted by the Contractor and approved by the Government.
9. GOVERNMENT FURNISHED MATERIALS: No government furnished material will be provided with respect to this Task Order.
10. DAMAGE TO APRON SURFACE: The Contractor shall not be responsible for incidental damage to the Apron surface. Notwithstanding, the Contractor shall be responsible for repair of damage resulting from the gross negligence of the Contractor, its agents, or employees.
11. ATTACHMENTS:
11.1. Site plans.
One set of blast shields to remain – see next page for close up One set of blast shields to remain – see next page for close up
Leave one set of blast shields in place for T-38 Run-up spot
Leave one set of blast shields in place for U-2/GH Run-up spot
Scope of Work
DISMANTLE/REMOVE BLAST SHIELDS
BAEY XX-XXXX
image1.jpeg image2.jpeg image3.png
Other files
| File | Type | Posted |
|---|---|---|
| 031511 BLAST SHIELD DISMANTLEMENT--CORRECTED FINAL REVISED SOW.docx | DOCX document | |
| 031411 BLAST SHIELD DISMANTLEMENT--FINAL REVISED SOW.docx | DOCX document | |
| 021811 JET BLAST SHIELD DISMANTLEMENT INDEFINATE EXTENSION.docx | DOCX document | |
| 021411 JET BLAST SHIELD DISMANTLEMENT SITE VISIT QUESTIONS AND ANSWERS.docx | DOCX document | |
| 021011 JET BLAST SHIELD DISMANTLEMENT SCA INFORMATION.docx | DOCX document | |
| 021011 JET BLAST SHIELD DISMANTLEMENT SITE VISIT LIMITATION.docx | DOCX document | |
| 021011 JET BLAST SHIELD DISMANTLEMENT DIGEST OF QUESTIONS AND ANSWERS.docx | DOCX document | |
| ACCESS TO BEALE AFB.docx | DOCX document | |
| curved bs 2.jpg | JPG image | |
| straight bs 2.jpg | JPG image | |
| 013111 DISMANTLE-REMOVE BLAST SHIELDS - SAFETY PLAN.doc | DOC document | |
| straight bs.jpg | JPG image | |
| curved bs.jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .