Amendment 4 - Attach 6 - Site Utility Drawing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_F17PS00115_Amd_000006.pdf | ||
| Amend_6_-_Attach_1_-_answers_to_questions_F17PS00115.pdf | ||
| Sol_F17PS00115_Amd_000005.pdf | ||
| Amend_4_-_Attach_7_-_HVAC_Floor_Plan_from_Site_Visit.pdf | ||
| Amend_4-_Attach_5_-_6.0_SITE_GRADING.PDF | ||
| Amend_4_-_Attach_2_-_site_visit_attendees.pdf | ||
| Amend_4_-_Attach_3_-_4.0_SITE_TOPO.PDF | ||
| Amend_4-_Attach_1_-_answers_to_question.DOCX | DOCX document | |
| Amend_4_-_Attach_4_-_5.0_SITE_DEMO.PDF | ||
| Sol_F17PS00115_Amd_000004.pdf | ||
| Sol_F17PS00115_Amd_000002.pdf | ||
| Sol_F17PS00115_Amd_000001.pdf | ||
| Attach_5_Non-Dislcosure_Agreement.pdf | ||
| Sol_F17PS00115.pdf | ||
| Attach_2_-_Bid_schedule.pdf | ||
| Attach_6-_Cover_letter.pdf | ||
| Attach_1-_contract_clauses.pdf | ||
| Attach_3_-_Forensic_Lab_SOW_Final_3-28-2017.pdf | ||
| Attach_4_-__DOL_Wage_Decision.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
O O
O
O O
O
O O
O O
O
O
O O
O O
O
O O
O O
O O
O O O O O O O
O O O O O O
O O
O
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
18''SD 18''SD
S
D
S
D
S
D
S
D
8''SD 8''SD 8''SD 8''SD
350.00'
S
D
U.S FISH AND WILDLIFE SERVICE
NATIONAL FORENSICS LABORATORY
1490 EAST MAIN STREET
39 1E 10 BD TAX LOT 4100
ZONING: SO
OREGON NATIONAL GUARD ARMORY
1420 EAST MAIN STREET
39 1E 10 BD TAX LOT 4100
ZONING: SO
SCIENCE WORKS
1500 EAST MAIN STREET
39 1E 10 BD TAX LOT 4100
ZONING: SO
350.00'
PARKING AREA
EX. 20' STORM DRAIN
EASEMENT
MAPLE
18" PINE
18" PINE
6" DECIDUOUS
6" DECIDUOUS
16" PINE
6" DECIDUOUS
20" PINE
12" MAPLE
3" DECIDUOUS
6''W
W
W
W
W
S
D
S
D
S
D
S
D
4''SD
6''SD
S
D
S
D
S
D
S
D
S
D S
D
EX. SDMH
RIM = 1891.30
IE IN (18" E) = 1883.75
IE IN (12" SE) = 1884.05
IE IN (6" S) = 1883.95
IE OUT (18" N) = 1883.70
6''SD
EX. 6" PVC PIPE
BETWEEN EXIST.
SWALES
S
D
4''SD
4''SD
4''SD
NOTE:
SEE PLUMBING PLANS FOR
WATER AND SEWER
CONNECTION FROM EXISTING
BUILDING TO NEW ADDITION
P: 541-772-7115
F: 541-779-4079
1120 East Jackson
PO Box 490
MAI Project Number: 17-1009
Medford, OR, 97501
PRELIMINARY
THESE DRAWINGS SHALL
NOT BE USED FOR:
CONSTRUCTION
BIDDING
RECORDATION
CONVEYANCE
ISSUANCE OF A PERMIT
XX% XX
OREGON LAW REQUIRES YOU TO FOLLOW RULES
ADOPTED BY THE OREGON UTILITY NOTIFICATION
CENTER. THOSE RULES ARE SET FORTH IN OAR
952-001-0010 THROUGH OAR 952-001-0090. YOU MAY
OBTAIN COPIES OF THE RULES BY CALLING THE CENTER
AT 503-232-1987.
TAP EXISTING 6" DUCTILE IRON WATER LINE.
1-6"x6" TAPPING SLEEVE
1-6" TAPPING VALVE
1-6" PIG
CONSTRUCTION NOTES
INSTALL 132 LF OF 6" C900 PVC FIRE SERVICE LINE.
RESTRAIN ALL JOINTS FROM TAP TO BUILDING.
MAINTAIN MINIMUM 36" OF COVER OVER FIRE LINE, SEE DETAIL 2,
SHEET 8 FOR STANDARD TRENCH DETAIL.
REMOVE EXISTING CONE AND BARREL SECTIONS AS NECESSARY AND INSTALL
NEW FLAT TOP ON EXISTING MANHOLE TO MEET NEW RIM ELEVATION FOR
MANHOLE
NEW RIM ELEVATION = 1888.93
CONNECT NEW 12" STORM DRAIN TO EXISTING MANHOLE
NEW 12" INVERT = 1883.80
RESHAPE MANHOLE CHANNELS AS NECESSARY TO MATCH NEW 12" PIPE INVERT
INSTALL 80 LF OF 12" SD @ 0.5%
INSTALL 12"x12"x12" TEE
INVERT = 1884.20
INSTALL CLEANOUT ON SOUTH SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 5 LF OF 12" SD @ 0.5%6
CONSTRUCT OUTLET CONTROL STORM DRAIN MANHOLE PER DETAIL 7, SHEET 8
RIM = 1889.90
INVERT IN (24") = 1884.30
INVERT OUT (12") = 1884.23
INSTALL STORMTECH SC-740 CHAMBER SYSTEM (8 CHAMBERS)AS AN ISOLATOR
ROW PER DETAILS 5 & 6, SHEET 8.
BASE OF CHAMBER ELEVATION = 1884.30
INSTALL 24"x24" PRE-CAST CONCRETE INLET
GRATE ELEVATION = 1888.90
INVERT IN (6" N) = 1885.78
INVERT IN (6" E) = 1885.78
INVERT IN (4" W) = 1885.95
INVERT OUT (24" S) = 1884.40
PROVIDE 12" SUMP IN BOTTOM OF INLET
INSTALL 60 LF OF 6" SD @ 1%
INSTALL 6"x6"x6" TEE
INVERT = 1886.16
INSTALL CLEANOUT ON WEST SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 6"x6"x6" TEE
INVERT = 1886.38
INSTALL CLEANOUT ON NORTH SIDE OF TEE PER DETAIL 3, SHEET 8
CONNECT TO 6" ROOF DRAIN FROM BUILDING, COORDINATE LOCATION AND
DEPTH OF CONNECTION WITH PLUMBING CONTRACTOR
INSTALL CATCH BASIN PER DETAIL 4, SHEET 8
GRATE ELEVATION = 1888.73
INVERT OUT (4") = 1887.40
INSTALL 17 LF OF 4" SD @ 2% MINIMUM
INSTALL 6"x6"x6" TEE ON EXISTING 6" PIPE FROM SWALE TO THE EAST
INVERT = 1887.00 (VERIFY)
INSTALL CLEANOUT ON SOUTH SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 37 LF OF 6" SD @ 3.1%
INSTALL 6"x6"x4" TEE
INVERT = 1886.39
INSTALL 12" SQUARE LANDSCAPING MINI-BASIN
GIBSON STEEL BASINS GMCB10-1218HB-4 OR APPROVED EQUAL
GRATE ELEVATION = 1888.50
INVERT OUT (4") = 1887.87
INSTALL 3 LF OF 4" SD BETWEEN BASIN AND TEE
INSTALL 6"x6"x6" TEE ON
INVERT = 1885.84
INSTALL 6"x6"x6" TEE
INVERT = 1886.00
INSTALL CLEANOUT ON EAST SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 6"x6"x4" TEE
INVERT = 1886.07
CONNECT 4" SD TO EXISTING CLEANOUT
INSTALL 6"x6"x4" TEE
INVERT = 1886.47
INSTALL 16 LF OF 4" SD @ 1% MINIMUM TO EAST AND CONNECT 4" SD TO
EXISTING CLEANOUT
INSTALL CLEANOUT ON NORTH SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 6"x6"x4" TEE
INVERT = 1886.55
INSTALL 7 LF OF 4" SD @ 1% MINIMUM TO EAST AND CONNECT 4" SD TO EXISTING
AREA DRAIN
INSTALL 6"x6"x4" TEE
INVERT = 1886.72
INSTALL 16 LF OF 4" SD @ 1% MINIMUM TO EAST AND CONNECT 4" SD TO
EXISTING CLEANOUT
INSTALL 6"x6"x4" TEE
INVERT = 1886.78
INSTALL 7 LF OF 4" SD @ 1% MINIMUM TO EAST AND CONNECT 4" SD TO EXISTING
AREA DRAIN
INSTALL 6"x4" WYE
INVERT = 1887.02
CONSTRUCTION NOTES (CONT.)
INSTALL 12" SQUARE CATCH BASIN WITH ADA COMPLIANT GRATE
GRATE ELEVATION = 1888.71
INVERT OUT (4") = 1887.38
INSTALL 19 LF OF 4" SD @ 1% MINIMUM BETWEEN BASIN AND WYE
INSTALL 6"x6"x4" TEE
INVERT = 1887.06
INSTALL CLEANOUT ON NORTH SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 4"x4"x4" TEE
INVERT = 1887.29
INSTALL 4"x4"x4" TEE
INVERT = 1887.35
CONNECT TO 4" DOWNSPOUT FROM WALKWAY COVER
INSTALL CLEANOUT ON NORTH SIDE OF TEE PER DETAIL 3, SHEET 8
INSTALL 12" SQUARE LANDSCAPING MINI-BASIN
GIBSON STEEL BASINS GMCB10-1218HB-4 OR APPROVED EQUAL
GRATE ELEVATION = 1888.83
INVERT OUT (4") = 1887.21
INSTALL 9 LF OF 4" SD BETWEEN BASIN AND TEE
INSTALL 12" SQUARE LANDSCAPING MINI-BASIN
GIBSON STEEL BASINS GMCB10-1218HB-4 OR APPROVED EQUAL
GRATE ELEVATION = 1888.00
INVERT OUT (4") = 1887.37
INSTALL 3 LF OF 4" SD BETWEEN BASIN AND TEE AND CONNECT TO EXISTING 4"
STUB AT 18" PIPE
INSTALL 4" 90° BEND ON EXISTING 4" FOUNDATION DRAIN
REMOVE FOUNDATION DRAIN FROM THIS POINT TO THE WEST AND PLUG 4" LINE
AT CONNECTION POINT TO THE EXISTING 18" STORM DRAIN
CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING 4" FOUNDATION
DRAIN BEFORE TRENCHING FOR NEW LINE. NOTIFY ENGINEER IMMEDIATELY IF
CONFLICTS ARE FOUND.
33 INSTALL 102 LF OF 4" D3034 PVC FOUNDATION DRAIN PIPING
34 CONNECT TO EXISTING 18" STORM DRAIN USING AND INSERT-A-TEE OR
APPROVED EQUAL. VERIFY EX. PIPE MATERIAL PRIOR TO ORDERING
INSERT-A-TEE.
INSTALL 8 LF OF 4" D3034 PVC FOUNDATION DRAIN PIPING FOR NEW BUILDING
ADDITION FOUNDATION DRAIN. CONNECT TO RE-ROUTED FOUNDATION DRAIN
FROM EXISTING BUILDING WITH A 4"x4" TEE.
AutoCAD SHX Text
FH
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
IR
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
CO
AutoCAD SHX Text
UGP
AutoCAD SHX Text
TR
AutoCAD SHX Text P
AutoCAD SHX Text
TEL
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1" =
AutoCAD SHX Text 20'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ORIGINAL DRAWING
AutoCAD SHX Text
NOT ONE INCH
AutoCAD SHX Text
ON THIS SHEET
AutoCAD SHX Text
ACCORDINGLY, IF
AutoCAD SHX Text
ADJUST SCALES
AutoCAD SHX Text 0" 1"
AutoCAD SHX Text
ONE INCH ON
AutoCAD SHX Text
THIS BAR IS
AutoCAD SHX Text
VERIFY SCALE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET __ OF __
AutoCAD SHX Text
BY
AutoCAD SHX Text
NEW MORPHOLOGY CENTER FACILITY
AutoCAD SHX Text
USFWS FORENSICS LABORATORY IN ASHLAND, OR
AutoCAD SHX Text
MAY 2017
AutoCAD SHX Text
XX
AutoCAD SHX Text X
AutoCAD SHX Text 7.0
AutoCAD SHX Text
SITE UTILITY PLAN
AutoCAD SHX Text
RSG
AutoCAD SHX Text
RSG
AutoCAD SHX Text
RSG
AutoCAD SHX Text
CALL BEFORE YOU DIG