(F) RFI Form.pdf
PDF 430 KB Posted
- Solicitation number
- 6021480
About this file
This document is a Request for Information (RFI) form related to a federal contract opportunity. The RFI is for Contract Number RFP 5997283, with the subject/title being "PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:". The RFI is requesting information and a recommended solution, with a response required by the specified date. The related federal contract opportunity is for the design and construction of electric vehicle charging stations at Naval Station Newport, under Solicitation Number 6021480. The base contract includes the full design, site improvements, electrical infrastructure, and EV charging facilities for Building 1, with options for pavement repair and additional EV charging facilities at other buildings. The contract is set aside for contractors under the MACC contracts N40085-21-D-0052 through N40085-21-D-0057 and N40085-21-D-0066.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| RFI Responses Part II.pdf | ||
| Amendment 0001.pdf | ||
| RFI Responses.pdf | ||
| Site Visit Log.pdf | ||
| (B) Specs Part 6.pdf | ||
| (E) ECMS.pdf | ||
| (A) Specs Parts 1 - 5.pdf | ||
| (G) Proposal Form.pdf | ||
| (D) FAR 52.204-24.pdf | ||
| RFP Information.pdf | ||
| (C) Wages 5JUL24.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
RFP 5997283
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Date: Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.
Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT
CONSTITUTE AUTHORIZATION TO PROCEED.
copy to: File 2L
Supv Civil Engineer Construction Representative
DLA Site Development
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER