F_-_25-18-ITB_-_Citywide_Pavement_Maintenance_and_Rehabilitative_Services_Bid_Tabulation_Sheet.pdf

PDF 312 KB Posted

Attached to
Citywide Pavement Maintenance and Rehabilitative Services
Solicitation number
25-18-ITB
Issued by
Indian River County, Florida

About this file

This document is a detailed Bid Tabulation for Bid #25-18-ITB, issued by the City of Sebastian, Florida, for Citywide Pavement Maintenance and Rehabilitative Services. The bid covers a comprehensive range of pavement-related services including chip seal, fog seal, cape seal, micro-surfacing, in-place recycling, asphalt paving, asphalt rejuvenation, crack sealing, pavement markings, and maintenance of traffic (MOT). The bid is specifically for Asphalt Paving Systems, Inc. from Zaphyrhills, FL, and includes pricing for various quantities and categories of work, such as different square yardage ranges, traffic levels, and project durations.

The total bid price for the entire scope of work is $2,140,422.80, with individual subtotals for different service categories: Chip Seal/Fog Seal at $33,085.03, Cape Seal at $54,046.21, Micro-Surfacing at $38,650.42, In-Place Recycling at $79,194.24, Asphalt at $29,324.00, Asphalt Rejuvenation at $343,983.40, Crack Sealing at $4,186.00, Pavement Markings at $1,437,953.50, and Maintenance of Traffic at $120,000.00. The bid includes detailed pricing for various job sizes, mobilization costs, and specific technical requirements such as different stone types, traffic levels, and surface treatments. The bid demonstrates comprehensive unit pricing for a wide range of pavement maintenance and rehabilitation services.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

Yes

Yes

Yes

Yes

Yes

$ 33,085.03

$ 54,046.21

$ 38,650.42

$ 79,194.24

$ 29,324.00

$ 343,983.40

$ 4,186.00

$ 1,437,953.50

$ 120,000.00

2,140,422.80$

Notes:

Posting Date: September 5, 2025

Bid Bond

Required Forms

FDOT Prequalification (Drainage, flexible paving, grading, and hot plant–mixed bituminous courses)

Bonding Capacity Certification

BID TABULATION

Bid #: 25-18-ITB

Bid Title: Citywide Pavement Maintenance and Rehabilitative Services

Bid Price Form

CHIP SEAL / FOG SEAL - SUBTOTAL

CAPE SEAL - SUBTOTAL

MICRO-SURFACING - SUBTOTAL

IN-PLACE RECYCLING - SUBTOTAL

Grand Total (Basis of Award)

ASPHALT - SUBTOTAL

ASPHALT REJUVENATION - SUBTOTAL

CRACK SEALING - SUBTOTAL

PAVEMENT MARKINGS - SUBTOTAL

MOT - SUBTOTAL

Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231

Item No. Description QTY Unit of

Measure Price Per Unit Extended Price

1 Single Chip (Number 89 Stone) - 0-25,000 SY 1 SY 4.63$ 4.63$

2 Single Chip (Number 89 Stone) - 25,001-50,000 SY 1 SY 4.14$ 4.14$

3 Single Chip (Number 89 Stone) - 50,001-100,000 SY 1 SY 3.94$ 3.94$

4 Single Chip (Number 89 Stone) - Over 100,000 SY 1 SY 3.74$ 3.74$

5 Double Chip (Number 57 & 89 Stone) - 0-25,000 SY 1 SY 7.65$ 7.65$

6 Double Chip (Number 57 & 89 Stone) - 25,001-50,000 SY 1 SY 6.99$ 6.99$

7 Double Chip (Number 57 & 89 Stone) - 50,001-100,000 SY 1 SY 6.60$ 6.60$

8 Double Chip (Number 57 & 89 Stone) - Over 100,000 SY 1 SY 6.35$ 6.35$

9 Triple Chip Seal - 0-25,000 SY 1 SY 10.30$ 10.30$

10 Triple Chip Seal - 25,001-50,000 SY 1 SY 9.65$ 9.65$

11 Triple Chip Seal - 50,001-100,000 SY 1 SY 9.25$ 9.25$

12 Triple Chip Seal - Over 100,000 SY 1 SY 8.99$ 8.99$

13 Fog Seal - 0-25,000 SY 1 SY 0.70$ 0.70$

14 Fog Seal - 25,001-50,000 SY 1 SY 0.70$ 0.70$

15 Fog Seal - 50,001-100,000 SY 1 SY 0.70$ 0.70$

16 Fog Seal - Over 100,000 SY 1 SY 0.70$ 0.70$

17 Mobilization - Task Order Total - $0.00- $50,000 1 LS 7,500.00$ 7,500.00$

18 Mobilization - Task Order Total - $50,001-$100,000 1 LS 7,500.00$ 7,500.00$

19 Mobilization - Task Order Total - $100,001-$500,000 1 LS 9,000.00$ 9,000.00$

20 Mobilization - Task Order Total - Over $500,000 1 LS 9,000.00$ 9,000.00$

33,085.03$

CHIP SEAL / FOG SEAL

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

Mobilization

Subtotal - CHIP SEAL / FOG SEAL

Measure Price Per Unit Extended Price

1 Cape Seal - 0-25,000 1 SY 12.89$ 12.89$

2 Cape Seal - 25,001-50,000 1 SY 11.80$ 11.80$

3 Cape Seal - 50,001-100,000 1 SY 10.84$ 10.84$

4 Cape Seal - Over 100,000 1 SY 10.68$ 10.68$

5 Mobilization - Task Order Total - $0.00- $50,000 1 LS 12,000.00$ 12,000.00$

6 Mobilization - Task Order Total - $50,001-$100,000 1 LS 12,000.00$ 12,000.00$

7 Mobilization - Task Order Total - $100,001-$500,000 1 LS 15,000.00$ 15,000.00$

8 Mobilization - Task Order Total - Over $500,000 1 LS 15,000.00$ 15,000.00$

54,046.21$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

CAPE SEAL

Mobilization

Subtotal - CAPE SEAL

Measure Price Per Unit Extended Price

1 Double Micro - 0-25,000 SY 1 SY 8.16$ 8.16$

2 Double Micro - 25,001-50,000 SY 1 SY 7.60$ 7.60$

3 Double Micro - 50,001-100,000 SY 1 SY 6.90$ 6.90$

4 Double Micro - Over 100,000 SY 1 SY 6.84$ 6.84$

5 Single Micro - 0-25,000 SY 1 SY 6.00$ 6.00$

6 Single Micro - 25,001-50,000 SY 1 SY 5.43$ 5.43$

7 Single Micro - 50,001-100,000 SY 1 SY 5.14$ 5.14$

8 Single Micro - Over 100,000 SY 1 SY 4.35$ 4.35$

9 Rut Filling (Leveling) - 0-25,000 Tons 1 Tons 400.00$ 400.00$

10 Rut Filling (Leveling) - 25,001-50,000 Tons 1 Tons 400.00$ 400.00$

11 Rut Filling (Leveling) - 50,001-100,000 Tons 1 Tons 400.00$ 400.00$

12 Rut Filling (Leveling) - Over 100,000 Tons 1 Tons 400.00$ 400.00$

13 Mobilization - Task Order Total - $0.00- $50,000 1 LS 8,500.00$ 8,500.00$

14 Mobilization - Task Order Total - $50,001-$100,000 1 LS 8,500.00$ 8,500.00$

15 Mobilization - Task Order Total - $100,001-$500,000 1 LS 10,000.00$ 10,000.00$

16 Mobilization - Task Order Total - Over $500,000 1 LS 10,000.00$ 10,000.00$

38,650.42$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

MICRO-SURFACING

Mobilization

Subtotal - MICRO-SURFACING

Measure Price Per Unit Extended Price

1 Pulverization - 0-25,000 SY 1 SY 13.60$ 13.60$

2 Pulverization - 25,001-50,000 SY 1 SY 10.15$ 10.15$

3 Pulverization - 50,001-100,000 SY 1 SY 9.55$ 9.55$

4 Pulverization - Over 100,000 SY 1 SY 9.05$ 9.05$

5 Cement - Cement Treated Base - 0-25,000 Tons 1 Tons 250.00$ 250.00$

6 Cement - Cement Treated Base - 25,001-50,000 Tons 1 Tons 250.00$ 250.00$

7 Cement - Cement Treated Base - 50,001-100,000 Tons 1 Tons 250.00$ 250.00$

8 Cement - Cement Treated Base - Over 100,000 Tons 1 Tons 250.00$ 250.00$

9 Asphaltic Cement - Foamed Asphalt Base - 0-25,000 Gallons 1 Gallons 4.85$ 4.85$

10 Asphaltic Cement - Foamed Asphalt Base - 25,001-50,000 Gallons 1 Gallons 4.85$ 4.85$

11 Asphaltic Cement - Foamed Asphalt Base - 50,001-100,000 Gallons 1 Gallons 4.85$ 4.85$

12 Asphaltic Cement - Foamed Asphalt Base - Over 100,000 Gallons 1 Gallons 4.85$ 4.85$

13 Asphaltic Emulsion - Emulsion Treated Base - 0-25,000 Gallons 1 Gallons 3.64$ 3.64$

14 Asphaltic Emulsion - Emulsion Treated Base - 25,001-50,000 Gallons 1 Gallons 3.64$ 3.64$

15 Asphaltic Emulsion - Emulsion Treated Base - 50,001-100,000 Gallons 1 Gallons 3.64$ 3.64$

16 Asphaltic Emulsion - Emulsion Treated Base - Over 100,000 Gallons 1 Gallons 3.64$ 3.64$

17 Added Rap or Aggregates - 0-25,000 Tons 1 Tons 50.00$ 50.00$

18 Added Rap or Aggregates - 25,001-50,000 Tons 1 Tons 50.00$ 50.00$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

IN-PLACE RECYCLING - RECONSTRUCTION (FULL DEPTH RECLAMATION)

Measure Price Per Unit Extended Price

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

IN-PLACE RECYCLING - RECONSTRUCTION (FULL DEPTH RECLAMATION)

19 Added Rap or Aggregates - 50,001-100,000 Tons 1 Tons 50.00$ 50.00$

20 Added Rap or Aggregates - Over 100,000 Tons 1 Tons 50.00$ 50.00$

21 Excavation for Widening/Unsuitable Materials - 0-25,000 CY 1 CY 45.00$ 45.00$

22 Excavation for Widening/Unsuitable Materials - 25,001-50,000 CY 1 CY 45.00$ 45.00$

23 Excavation for Widening/Unsuitable Materials - 50,001-100,000 CY 1 CY 45.00$ 45.00$

24 Excavation for Widening/Unsuitable Materials - Over 100,000 CY 1 CY 45.00$ 45.00$

25 General Use Optional Base Material - 0-25,000 CY 1 CY 47.50$ 47.50$

26 General Use Optional Base Material - 25,001-50,000 CY 1 CY 47.50$ 47.50$

27 General Use Optional Base Material - 50,001-100,000 CY 1 CY 47.50$ 47.50$

28 General Use Optional Base Material - Over 100,000 CY 1 CY 47.50$ 47.50$

29 Shoulder Rework - 0'-4' (width) LF 1 LF 2.35$ 2.35$

30 Shoulder Rework - <4' to 6' (width) LF 1 LF 2.75$ 2.75$

31 Shoulder Rework - <6' to 10' (width) LF 1 LF 3.35$ 3.35$

32 Shoulder Rework - <10' (width) LF 1 LF 3.85$ 3.85$

33 Milling 1-2” - 0-1,000 SY 1 SY 15.50$ 15.50$

34 Milling 1-2” - 1,001-5,000 SY 1 SY 7.50$ 7.50$

35 Milling 1-2” - 5,001-10,000 SY 1 SY 4.99$ 4.99$

36 Milling 1-2” - 10,001-25,000 SY 1 SY 3.99$ 3.99$

37 Milling 1-2” - Over 25,001 SY 1 SY 3.65$ 3.65$

38 Mobilization - Task Order Total - $0.00- $50,000 1 LS 17,500.00$ 17,500.00$

39 Mobilization - Task Order Total - $50,001-$100,000 1 LS 17,500.00$ 17,500.00$

40 Mobilization - Task Order Total - $100,001-$500,000 1 LS 20,000.00$ 20,000.00$

41 Mobilization - Task Order Total - Over $500,000 1 LS 22,500.00$ 22,500.00$

79,194.24$

Mobilization

Subtotal - IN-PLACE RECYCLING

Measure Price Per Unit Extended Price

1 9.5 S.P. Traffic Level C - 0-100 Ton 1 Ton 358.00$ 358.00$

2 9.5 S.P. Traffic Level C - 100-500 Ton 1 Ton 248.00$ 248.00$

3 9.5 S.P. Traffic Level C - 501-1,000 Ton 1 Ton 193.00$ 193.00$

4 9.5 S.P. Traffic Level C - 1,001-5,000 Ton 1 Ton 186.00$ 186.00$

5 9.5 S.P. Traffic Level C - Over 5,001 Ton 1 Ton 182.00$ 182.00$

6 12.5 S.P. Traffic Level C - 0-100 Ton 1 Ton 356.00$ 356.00$

7 12.5 S.P. Traffic Level C - 101-500 Ton 1 Ton 246.00$ 246.00$

8 12.5 S.P. Traffic Level C - 501-1,000 Ton 1 Ton 191.00$ 191.00$

9 12.5 S.P. Traffic Level C - 1,001-5,000 Ton 1 Ton 184.00$ 184.00$

10 12.5 S.P. Traffic Level C - Over 5,001 Ton 1 Ton 180.00$ 180.00$

11 Mobilization - Task Order Total - $0.00- $50,000 1 LS 5,500.00$ 5,500.00$

12 Mobilization - Task Order Total - $50,001-$100,000 1 LS 5,500.00$ 5,500.00$

13 Mobilization - Task Order Total - $100,001-$500,000 1 LS 7,500.00$ 7,500.00$

14 Mobilization - Task Order Total - Over $500,000 1 LS 8,500.00$ 8,500.00$

29,324.00$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

334 SUPERPAVE ASPHALT CONCRETE

Mobilization

Subtotal - ASPHALT

Measure Price Per Unit Extended Price

1 Rejuvenation - 0-1,000 SY 10 SY 6.56$ 65.60$

2 Rejuvenation - 1,001-5,000 SY 10 SY 4.38$ 43.80$

3 Rejuvenation - 5,001-25,000 SY 10 SY 3.14$ 31.40$

4 Rejuvenation -25,001-50,000 SY 10 SY 1.61$ 16.10$

5 Rejuvenation - Over 50,000 SY 10 SY 1.47$ 14.70$

6 Test Core Removal - 0-1,000 EA 10 EA 450.00$ 4,500.00$

7 Test Core Removal - 1,001-5,000 EA 10 EA 450.00$ 4,500.00$

8 Test Core Removal - 5,001-25,000 EA 10 EA 450.00$ 4,500.00$

9 Test Core Removal - 25,001-50,000 EA 10 EA 450.00$ 4,500.00$

10 Test Core Removal - Over 50,000 EA 10 EA 450.00$ 4,500.00$

11 Test Core Laboratory Analysis - 0-1,000 EA 10 EA 562.50$ 5,625.00$

12 Test Core Laboratory Analysis - 1,001-5,000 EA 10 EA 562.50$ 5,625.00$

13 Test Core Laboratory Analysis - 5,001-25,000 EA 10 EA 562.50$ 5,625.00$

14 Test Core Laboratory Analysis - 25,001-50,000 EA 10 EA 562.50$ 5,625.00$

15 Test Core Laboratory Analysis - Over 50,000 EA 10 EA 562.50$ 5,625.00$

16 Rejuvenation (including Titanium Dioxide) - 0-1,000 SY 10 SY 11.37$ 113.70$

17 Rejuvenation (including Titanium Dioxide) - 1,001-5,000 SY 10 SY 8.33$ 83.30$

18 Rejuvenation (including Titanium Dioxide) - 5,001-25,000 SY 10 SY 4.97$ 49.70$

19 Rejuvenation (including Titanium Dioxide) - 25,001-50,000 SY 10 SY 3.42$ 34.20$

20 Rejuvenation (including Titanium Dioxide) - Over 50,000 SY 10 SY 3.09$ 30.90$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

ASPHALT REJUVENATION

Measure Price Per Unit Extended Price

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

ASPHALT REJUVENATION

21 Field Core Removal - 0-1,000 EA 10 EA 450.00$ 4,500.00$

22 Field Core Removal - 1,001-5,000 EA 10 EA 450.00$ 4,500.00$

23 Field Core Removal - 5,001-25,000 EA 10 EA 450.00$ 4,500.00$

24 Field Core Removal - 25,001-50,000 EA 10 EA 450.00$ 4,500.00$

25 Field Core Removal - Over 50,000 EA 10 EA 450.00$ 4,500.00$

26 Field Core Laboratory Analysis - Viscosity - 0-1,000 EA 10 EA 562.50$ 5,625.00$

27 Field Core Laboratory Analysis - Viscosity - 1,001-5,000 EA 10 EA 562.50$ 5,625.00$

28 Field Core Laboratory Analysis - Viscosity - 5,001-25,000 EA 10 EA 562.50$ 5,625.00$

29 Field Core Laboratory Analysis - Viscosity - 25,001-50,000 EA 10 EA 562.50$ 5,625.00$

30 Field Core Laboratory Analysis - Viscosity - Over 50,000 EA 10 EA 562.50$ 5,625.00$

Field Core Laboratory Analysis - Titanium Dioxide Penetration -

0-1,000 EA

10 EA 900.00$ 9,000.00$

Field Core Laboratory Analysis - Titanium Dioxide Penetration -

1,001-5,000 EA

10 EA 900.00$ 9,000.00$

Field Core Laboratory Analysis - Titanium Dioxide Penetration -

5,001-25,000 EA

10 EA 900.00$ 9,000.00$

Field Core Laboratory Analysis - Titanium Dioxide Penetration -

25,001-50,000 EA

10 EA 900.00$ 9,000.00$

Field Core Laboratory Analysis - Titanium Dioxide Penetration -

Over 50,000 EA

10 EA 900.00$ 9,000.00$

Field Core Laboratory Analysis - Titanium Dioxide NO2

Reduction - 0-1,000 EA

10 EA 1,012.50$ 10,125.00$

Field Core Laboratory Analysis - Titanium Dioxide NO2

Reduction - 1,001-5,000 EA

10 EA 1,012.50$ 10,125.00$

Field Core Laboratory Analysis - Titanium Dioxide NO2

Reduction - 5,001-25,000 EA

10 EA 1,012.50$ 10,125.00$

Field Core Laboratory Analysis - Titanium Dioxide NO2

Reduction - 25,001-50,000 EA

10 EA 1,012.50$ 10,125.00$

Measure Price Per Unit Extended Price

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

ASPHALT REJUVENATION

Field Core Laboratory Analysis - Titanium Dioxide NO2

Reduction - Over 50,000 EA

10 EA 1,012.50$ 10,125.00$

Field Core Laboratory Analysis - Titanium Dioxide Solar

Reflectance Index (SRI) - 0-1,000 EA

10 EA 2,812.50$ 28,125.00$

Field Core Laboratory Analysis - Titanium Dioxide Solar

Reflectance Index (SRI) - 1,001-5,000 EA

10 EA 2,812.50$ 28,125.00$

Field Core Laboratory Analysis - Titanium Dioxide Solar

Reflectance Index (SRI) - 5,001-25,000 EA

10 EA 2,812.50$ 28,125.00$

Field Core Laboratory Analysis - Titanium Dioxide Solar

Reflectance Index (SRI) - 25,001-50,000 EA

10 EA 2,812.50$ 28,125.00$

Field Core Laboratory Analysis - Titanium Dioxide Solar

Reflectance Index (SRI) - Over 50,000 EA

10 EA 2,812.50$ 28,125.00$

46 Mobilization - Task Order Total - $0.00- $50,000 1 LS 1,500.00$ 1,500.00$

47 Mobilization - Task Order Total - $50,001-$100,000 1 LS 1,500.00$ 1,500.00$

48 Mobilization - Task Order Total - $100,001-$500,000 1 LS 1,500.00$ 1,500.00$

49 Mobilization - Task Order Total - Over $500,000 1 LS 1,500.00$ 1,500.00$

343,983.40$

Mobilization

Subtotal - ASPHALT REJUVENATION

Measure Price Per Unit Extended Price

1 Crack Sealant - 0-500 Gallon 1 Gallon 48.0000$ 48.0000$

2 Crack Sealant - 501-1,000 Gallon 1 Gallon 38.0000$ 38.0000$

3 Crack Sealant - 1,001-5,000 Gallon 1 Gallon 35.0000$ 35.0000$

4 Crack Sealant - 5,001-10,000 Gallon 1 Gallon 34.0000$ 34.0000$

5 Crack Sealant - Over 10,000 Gallon 1 Gallon 31.0000$ 31.0000$

6 Mobilization - Task Order Total - $0.00- $50,000 1 LS 1,000.00$ 1,000.00$

7 Mobilization - Task Order Total - $50,001-$100,000 1 LS 1,000.00$ 1,000.00$

8 Mobilization - Task Order Total - $100,001-$500,000 1 LS 1,000.00$ 1,000.00$

9 Mobilization - Task Order Total - Over $500,000 1 LS 1,000.00$ 1,000.00$

4,186.0000$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

CRACK SEALING

Mobilization

Subtotal - CRACK SEALING

Measure Price Per Unit Extended Price

1 4" 10 GM 9,000.0000$ 90,000.0000$

2 6" 10 GM 10,690.0000$ 106,900.0000$

3 8" 10 LF 9.0000$ 90.0000$

4 12" 10 LF 19.1500$ 191.5000$

5 18" 10 LF 30.4000$ 304.0000$

6 24" 10 LF 38.2500$ 382.5000$

6 4" 10 GM 6,900.0000$ 69,000.0000$

7 6" 10 GM 8,250.0000$ 82,500.0000$

8 4" 10 GM 9,000.0000$ 90,000.0000$

9 6" 10 GM 10,690.0000$ 106,900.0000$

10 8" 10 LF 9.0000$ 90.0000$

11 12" 10 LF 19.1500$ 191.5000$

12 18" 10 LF 30.4000$ 304.0000$

13 4" 10 GM 6,900.0000$ 69,000.0000$

14 6" 10 GM 8,250.0000$ 82,500.0000$

PAVEMENT MARKINGS

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

YELLOW - SKIP

WHITE - SKIP

YELLOW - SOLID

WHITE - SOLID

Measure Price Per Unit Extended Price

PAVEMENT MARKINGS

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

15 4" 10 GM 18,000.0000$ 180,000.0000$

16 6" 10 GM 21,375.0000$ 213,750.0000$

17 Yellow - Skip 4" 10 GM 6,190.0000$ 61,900.0000$

18 Yellow - Skip 6" 10 GM 7,315.0000$ 73,150.0000$

19 White - Skip 4" 10 GM 6,190.0000$ 61,900.0000$

20 White - Skip 6" 10 GM 7,315.0000$ 73,150.0000$

21 "STOP" 10 EA 475.0000$ 4,750.0000$

22 "R X R" (Includes 6" white) 10 EA 732.0000$ 7,320.0000$

23 "ONLY" 10 EA 475.0000$ 4,750.0000$

24 "LANE" 10 EA 475.0000$ 4,750.0000$

25 "MERGE" 10 EA 585.0000$ 5,850.0000$

26 "SCHOOL" 10 EA 585.0000$ 5,850.0000$

YELLOW - DOUBLE

LEGENDS

AUDIBLE AND VIBRATORY PAVEMENT MARKINGS

Measure Price Per Unit Extended Price

PAVEMENT MARKINGS

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

27 "AHEAD" 10 EA 585.0000$ 5,850.0000$

28 "Vistor" 10 EA 835.0000$ 8,350.0000$

29 "Resident" 10 EA 960.0000$ 9,600.0000$

30 "Path" 10 EA 585.0000$ 5,850.0000$

31 TURN AND THROUGH LANE TURN ARROW 10 EA 315.0000$ 3,150.0000$

32 THROUGH LANE USE ARROW 10 EA 170.0000$ 1,700.0000$

33 TURN LANE USE ARROW 10 EA 170.0000$ 1,700.0000$

34 BIKE OR CART 10 EA 280.0000$ 2,800.0000$

35 BIKE ARROW 10 EA 225.0000$ 2,250.0000$

36 YIELD TRIANGLES 10 EA 69.0000$ 690.0000$

37 Bi-Directional, Amber 10 EA 18.0000$ 180.0000$

38 Mono-Directional Colorless 10 EA 18.0000$ 180.0000$

39 Bi-Directional, White/Red 10 EA 18.0000$ 180.0000$

1,437,953.5000$

REFLECTIVE PAVEMENT MARKERS

MARKINGS

Subtotal - PAVEMENT MARKINGS

Measure Price Per Unit Extended Price

Standard Index 600 Series MOT TWO- LANE AND

MULTILANE, WORK ON SHOULDER - 0-7 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT TWO- LANE AND

MULTILANE, WORK ON SHOULDER - 8-14 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT TWO- LANE AND

MULTILANE, WORK ON SHOULDER - 15-21 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT TWO- LANE AND

MULTILANE, WORK ON SHOULDER - 22-31 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT TWO- LANE AND

MULTILANE, WORK ON SHOULDER - Over 31 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY

WORK WITHIN THE TRAVEL WAY - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY

WORK WITHIN THE TRAVEL WAY - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY

WORK WITHIN THE TRAVEL WAY - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY

WORK WITHIN THE TRAVEL WAY - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY

WORK WITHIN THE TRAVEL WAY - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY, INTERSECTION WORK - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY, INTERSECTION WORK - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY, INTERSECTION WORK - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY, INTERSECTION WORK - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT TWO- LANE, TWO-WAY, INTERSECTION WORK - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

SHOULDER

WITHIN THE TRAVEL WAY

INTERSECTION WORK

MAINTENANCE OF TRAFFIC (MOT)

Measure Price Per Unit Extended Price

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

MAINTENANCE OF TRAFFIC (MOT)

Standard Index 600 Series MOT Multilane Roadway, Lane

Closures - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Lane

Closures - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Lane

Closures - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Lane

Closures - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Lane

Closures - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Intersection Work - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Intersection Work - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Intersection Work - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Intersection Work - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Multilane Roadway, Intersection Work - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Temporary Road Closure - 0-

7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Temporary Road Closure - 8-

14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Temporary Road Closure -

15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Temporary Road Closure -

22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Temporary Road Closure -

Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

MULTILANE ROADWAY, LANE CLOSURE

MULTILANE ROADWAY, INTERSECTION WORK

TEMPORARY ROAD CLOSURE

Measure Price Per Unit Extended Price

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

MAINTENANCE OF TRAFFIC (MOT)

Standard Index 600 Series MOT Two- Way Left-Turn Lanes -

0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Two- Way Left-Turn Lanes -

8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Two- Way Left-Turn Lanes -

15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Two- Way Left-Turn Lanes -

22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Two- Way Left-Turn Lanes -

Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

36 Standard Index 600 Series MOT Sidewalk Closure - 0-7 Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT Sidewalk Closure - 8-14

Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT Sidewalk Closure - 15-21

Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT Sidewalk Closure - 22-31

Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT Sidewalk Closure - Over 31

Days 1 Day 1,500.0000$ 1,500.0000$

Standard Index 600 Series MOT Work Within the Roundabout

- 0-7 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Work Within the Roundabout

- 8-14 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Work Within the Roundabout

- 15-21 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Work Within the Roundabout

- 22-31 Days 1 Day 3,000.0000$ 3,000.0000$

Standard Index 600 Series MOT Work Within the Roundabout

- Over 31 Days 1 Day 3,000.0000$ 3,000.0000$

120,000.0000$

ROUNDABOUT

Subtotal - MOT

TWO-WAY LEFT TURN LANES

SIDEWALK CLOSURE

Measure Price Per Unit

1 Performance Turf Sod N/A SY 6.0000$

2 Variable Message Board N/A Per Board

Per Day 50.0000$

3 SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF N/A AS 425.0000$

4 SINGLE POST SIGN, F&I GROUND MOUNT, 12-20 SF N/A AS 1,450.0000$

5 SINGLE POST SIGN, F&I GROUND MOUNT, 21-30 SF N/A AS 2,600.0000$

6 MAILBOX (REMOVE AND REPLACE) N/A EA 325.0000$

7 Silt Fence Type III N/A LF 3.2500$

8 Removal of Existing Marking N/A SF 3.6500$

9 Preform Thermoplastic 12” N/A LF 11.8500$

10 Preform Thermoplastic 24” N/A LF 25.0000$

11 Off Duty Law Enforcement Officer N/A HR 125.0000$

BID TABULATION

Bid #: 25-18-ITB

Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services

Asphalt Paving Systems, Inc.

Zaphyrhills, FL

MISC

File details come from the government source that posted it. Updated .