Existing Conditions Lintel Details (3 pages).pdf

PDF 2 MB Posted

Attached to
Z1DA--PN: 568-20-102 Upgrade Mental Health Lock Ward (FM)
Solicitation number
36C26323B0001
Issued by

About this file

This document contains construction drawings and specifications for upgrading security systems and partitions at a medical center. Key details include upgrading security systems for Project 568-09-109, revising door numbers, noting the location of a fiber patch panel and related equipment in Room CTC1, and specifications for constructing a partition in Closet 1 with 3 5/8-inch metal studs and track, 5/8-inch Type X gypsum board, hollow metal door frame, a pair of solid core flush birch doors, door hardware, and modifying acoustic ceiling tiles and installing vinyl base as needed. The contractor shall patch and repair all surfaces disturbed under the contract.

The related federal contract opportunity is solicitation number 36C26323B0001 to upgrade the mental health lock ward at a Department of Veterans Affairs medical center for Project 568-20-102.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

Note: Contractor shall patch/repair all surfaces disturbed under this contract.

Partition Construction for ACP-7 Closet

1. Partition construction- 3 5/8" 20ga. metal studs and track.

2. 5/8" Type X gyp board, tape and paint.

3. Hollow metal frames- 1-6'0"X7'0" hollow metal door frame (frame to be slugged).

3 a. Doors shall be-pair of 3-0X7-0 Solid core flush rotary cut birch

4. Door Hardware: 3 ea.-4 1/2"X4 1/2" ball bearing butts, 1 ea. Best Office Lock

(93K7AB15D), 1 ea. surface bolt on inactive leaf, 2 ea. clear plastic 16" plates.

5. Modify acoustical ceiling tile as needed, furnish and install vinyl base to match existing.

6. Partition(metal studs and gyp board) shall extend to the existing deck.

D r a w n

B y

S

R M

U p g r a d e

S c u r i t y

S y s t e m s f o r

M e d i c a l

C e n t e r

P r o j e c t

N o

R e v i s e d

D o o r

N u m b e r s

S R

M

Note location of fiber patch panel, media converter and power supply in room CTC1

P a r t i t i o n s

N o t e s

L o c a t i o n o f

C

T C

S R

M

R e v i s i o n s

P e r

R

F P

J S

V

A

B

C

Note: Contractor shall patch/repair all surfaces disturbed under this contract.

U p g r a d

S c u r i t y

S y s t e m s f o r

M e d i c a l

C e n t e r

P r o j e c t

N o

R e v i s e d

D o o r

N u m b e r s

S R

M

R e v i s i o n s

P e r

R

F P

J S

V

P15_148-8
P15_DD-14_A
P15_DD-15_A

File details come from the government source that posted it. Updated .