EXIBIT A_OneSAF_Exhibit_CDRLs_.pdf
PDF 607 KB Posted
- Attached to
- OneSAF SSN W900KK-22-R-0037 Documents
- Solicitation number
- W900KK-22-R-0037
About this file
This document package contains Contract Data Requirements Lists (CDRLs) and a federal contract opportunity notice for the OneSAF program. The CDRLs outline 15 data items required from the contractor, including progress reports, software test plans, manuals, training materials and documentation deliverables. Key deliverables are due monthly, quarterly, annually or with each software release throughout the contract period. The federal contract opportunity is a pre-solicitation notice for the OneSAF SSN contract under solicitation number W900KK-22-R-0037 from the Department of the Army to provide software and related services for the OneSAF program. Response and award dates are not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6. REQUIRING OFFICE
SFAE-STRI-SE-CSSPWS 3.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CPSMR See Block 16
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-XX-X-XXXOneSAF
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
4. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.
2. BLOCK 13: SHALL CONTINUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY GRAPHIC PACKAGES USED
TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF
COMPATIBLE FORMATS.
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SFAE-STRI-SE-CSSPWS 3.1.5
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Process Report Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-XX-X-XXX OneSAF
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
QRTLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran,Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 3: PROCESS REPORT TOPICS SHALL BE FINALIZED AT THE PAC.
2. BLOCK 12: SHALL BE DUE 120 DAYS AFTER PAC.
3. BLOCK 13: SHALL BE DUE THREE TIMES ANNUALLY THROUGH END OF CONTRACT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY
AND/OR ADOBE PDF COMPATIBLE FORMATS.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF THE SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-PM SE
PWS 3.1.1
5. CONTRACT REFERENCE
DI-MGMT-81334
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Work Breakdown Structure
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-XX-X-XXX OneSAF
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD
2. BLOCK 13: REVISIONS SHALL CONTINUE AS REQUIRED THROUGH THE
LIFE OF THE CONTRACT.
3. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC PACKAGES USED
TO CREATE FIGURES, TABLES AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE FORMAT USED BY THE U.S. ARMY.
4. THE GOVERNMENT WILL HAVE 20 WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-OPS
PWS 3.1.6
5. CONTRACT REFERENCE
DI-MGMT-80259
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Inventory Report Physical Inventories Report
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-XX-X-XXXXOneSAF
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ANNLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO
COMPLETION OF THE CONTRACT.
3. BLOCK 12: SHALL BE DUE NINETY (90) DAYS AFTER POST AWARD CONFERENCE.
4. BLOCK 13: SHALL BE UPDATED AFTER THE FIRST SUBMISSION AS
REQUIRED BY INVENTORY CHANGES, SUBMISSIONS REQUIRING APROVAL
SHALL BE PROVIDED FORTY-FIVE (45) DAYS PRIOR TO COMPLETION OF EACH
OPTION YEAR ON AN ANNUAL BASIS.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE USED BY THE U.S. ARMY AND/OR
ADOBE PDF COMPATIBLE FORMATS.
6. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
7. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IN ACCORDANCE WITH DI-MGMT-80259 IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.17.2
5. CONTRACT REFERENCE
DI-IPSC-81429A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
STrP SOFTWARE TRANSITION PLAN (STrP)
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
2 TIME
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
06 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 12: DRAFT SUBMISSION SHALL BE DUE TWELVE (12) MONTHS PRIOR
TO THE END OF THE CONTRACT.
2. BLOCK 13: FINAL SUBMISSION SHALL BE DUE SIX (6) MONTHS PRIOR TO
THE END OF THE CONTRACT.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE USED BY THE U.S. ARMY AND/OR
ADOBE PDF COMPATIBLE FORMATS.
4. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.4
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Technical Report Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 10 AND 12: SHALL BE DUE AS REQUIRED BY THE GOVERNMENT 30
DAYS FOLLOWING COMPLETION OF A SIGNIFICANT EVENT OR DEVELOPMENT,
INTEGRATION AND TEST ACTIVITY. TECHNICAL REPORT SHALL BE DUE 90
DAYS PRIOR TO THE END OF THE CONTRACT.
2. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY
AND/OR ADOBE PDF COMPATIBLE FORMATS.
3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF THE SUBMISSION.
4. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.3.4
5. CONTRACT REFERENCE
DI-SESS-80639D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
ECP Engineering Change Proposal (ECP)
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER CMAN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 12 AND 13: SHALL BE DUE 30 DAYS AFTER IDENTIFYING A CHANGE
TO ANY ESTABLISHED BASELINE.
2. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE FORMST USED BY THE U.S. ARMY
AND/OR ADOBE PDF COMPATIBLE FORMATS.
3. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
4. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMNET COMMENTS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSS
5. CONTRACT REFERENCE
PWS 3.15.3 , 3.15.4DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE Integrated Development Environment
Capability Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
SS
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
ANNLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 13: SUBSEQUENT SUBMISSIONS DUE ANNUALLY FOR THE LENGTH OF
THE CONTRACT. FINAL SUBMISSION SHALL BE DUE 60 DAYS PRIOR TO THE
END OF CONTRACT.
2. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC DOWNLOAD
AND SHALL CONTAIN ALL THE HARDWARE SPECIFICATIONS, SOFTWARE AND
MODIFICATIONS THEREOF, DATA, SETUP/CONFIGURATION INSTRUCTIONS,
PASSWORD LISTS, NETWORK DIAGRAMS AND ALL OTHER DOCUMENTATION
NEEDED TO SETUP ONESAF'S INTEGRATED DEVELOPMENT ENVIRONMENT (IDE).
3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
4. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.9, 3.9.1
5. CONTRACT REFERENCE
DI-AVCS-80700
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
OneSAF Software Version Release COMPUTER SOFTWARE PRODUCT END ITEMS
2. TITLE OF THE DATA ITEM
B001
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MCCR
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
SS
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 9: SOFWARE VERSION, TECHNICAL DOCUMENTS AND CODE BASE
SHALL INCLUDE THE FOLLOWING MARKING:
A. FOR A DOMESTIC VERSION RELEASE -
CUI//SP-CTI, EXPT//DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED TO
U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS(ADMINISTRATIVE OR
OPERATIONAL USE, MARCH 4, 2021). OTHER REQUESTS SHALL BE REFERREDTO THE
U.S. ARMY PROGRAM EXECUTIVE OFFICE SIMULATION, TRAINING, ANDINSTRUMENTATION
(PEO STRI), PROJECT MANAGER FOR CONSTRUCTIVE SIMULATION SUPPORT(PDM CSS),
ONE SEMI-AUTOMATED FORCES (ONESAF) PROGRAM
B. FOR DOMESTIC MINUS INTERNATIONAL VERSION RELEASES -
OTHER REQUESTS SHALL BE REFERREDTO THE U.S. ARMY PROGRAM
EXECUTIVE OFFICE SIMULATION, TRAINING, ANDINSTRUMENTATION (PEO
STRI), PROJECT MANAGER FOR CONSTRUCTIVE SIMULATION SUPPORT(PD
CSS), ONE SEMI-AUTOMATED FORCES (ONESAF) PROGRAM
2. BLOCK 12 AND 13: SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE
THROUGH THE LIFE OF THE DELIVERY ORDER.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED ON ELECTRONIC DISTRIBUTION
COMPATIBLE WITH THE INTEGRATION AND DEVELOPMENT ENVIRONMENT
SYSTEM AND SOFTWARE ENGINEERING ENVIRONMENT TOOLS. COPIES TO ACC.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.3
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SEE BLOCK 16 Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
B002
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 3: OneSAF Product Line Architecture Specification
2. BLOCK 12:
3. BLOCK 13:
4. BLOCK 14:
SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE. REVISIONS
AS REQUIRED THROUGH LIFE OF THE CONTRACT. REPRODUCIBLE SHALL
BE DELIVERED VIA ELECTRONIC DOWNLOAD
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT
FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF COMPATIBLE FORMATS.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 30 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.3
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SEE BLOCK 16 Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
B003
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 3: OneSAF Product Line Requirement Specification
2. BLOCK 12: SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE.
3. BLOCK 13: REVISION AS REQUESTED THROUGH THE LIFE OF THE CONTRACT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY
AND/OR ADOBE PDF COMPATIBLE FORMATS.
5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 30 DAYS TO INCORPORATE GOVERNMENT COMMENTS
7. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.3.1
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
OneSAF System Integration Plan Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
B004
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ANNLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran,Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 12: INITIAL SUBMISSION DUE 30 DAYS AFTER CONTRACT AWARD.
2. BLOCK 13: SUBSEQUENT SUBMISSIONS WILL OCCUR ANNUALLY THROUGH THE
LIFE OF THE CONTRACT.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE USED BY THE U.S. ARMY AND/OR
ADOBE PDF COMPATIBLE FORMATS.
4. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.18
5. CONTRACT REFERENCE
DI-MGMT-82000
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
OneSAF RMF Package SEE BLOCK 16
2. TITLE OF THE DATA ITEM
B005
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. Block 2: DOD Risk Management Framework (RMF).
2. BLOCK 4: The RMF artifacts for OneSAF shall be delivered in a format approved by the Governments Designated Accrediting Authority (DAA), Authorizing Official (AO), or Information Systems Security Manager (ISSM).
See tailoring below.
3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO A PRODUCT VERSION RELEASE AND 60
DAYS PRIOR TO AN ACCREDIDATION EVENT.
4. BLOCK 13: REVISIONS AS NEEDED THROUGHOUT CONTRACT PERIOD OF PERFORMANCE.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF COMPATIBLE
FORMATS.
6. BLOCK 4: All deliverable data shall conform to the Risk Management Framework (RMF) requirements.
7. BLOCK 4: Section 2.1.5 is changed into:
RMF Implementation Plan (RIP). The RIP shall use the approved DAA, AO, or
ISSM format. The RIP shall be used during the RIP Concurrence meeting with the Government. The RIP shall define which IA Controls (IACs) will be
Implemented, Inherited, Non-Compliant, or Not Applicable. The RIP shall be accomplished through the use of the Army's eMASS System. The RIP shall be approved by the DAA, AO, and ISSM prior to execution of the IA Test Plan.
8. BLOCK 4: Omit Section 2.1.6 PIT Implementation Plan (PIP).
9. BLOCK 4: Omit Section 2.1.8 PIT Designation Request.
10. BLOCK 4: Omit Section 2.1.9 PIT Determination Brief.
11. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
12. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.9, 3.9.1
5. CONTRACT REFERENCE
DI-IPSC-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
OneSAF Product Release Test Procedure Software Test Plan
2. TITLE OF THE DATA ITEM
B006
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER NDTI
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE
START OF ANNUAL RELEASE TESTING.THE GOVERNMENT WILL HAVE 10
WORKING DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION OF EACH
SUBMISSION. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO
INCORPORATE GOVERNMENT COMMENTS
2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER INITIAL PLANNING CONFERENCE
FOR EACH SOFTWARE VERSION RELEASE
3. BLOCK 13: SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE THROUGH
THE LIFE OF THE CONTRACT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH
MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF
COMPATIBLE FORMATS.
5. BLOCK 14: TEST PLAN SHALL ALSO BE PUBLISHED TO THE DEVELOPMENT
ENVIRONMENT IN FORMAT COMPATIBLE WITH MICROSOFT OFFICE FORMAT USED
BY THE U.S. ARMY AND/OR ADOBE PDF COMPATIBLE FORMATS.
6. BLOCK 14: PROPOSED CONTRACT TAILORING ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.9, 3.9.1, 3.10.1
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE OneSAF Operator Manual and
Bifrost Operator Manual Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
C001
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 3: UPDATES TO OPERATOR'S MANUAL SHALL INCLUDE SPECIFIC
PRODUCT/COMPONENT USER GUIDES SUCH AS Bifrost, MCA, OneSAF Control, ESS, etc.
2. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DOWNLOAD DELIVERY
AND SHALL INCLUDE UPDATES TO THE OPERATOR MANUAL
3. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DOWNLOAD
DELIVERY AND SHALL INCLUDE UPDATES TO THE OPERATOR MANUAL
4. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA SOFTWARE DOWNLOAD
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF
COMPATIBLE FORMATS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.9, 3.9.1, 3.10.3
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE OneSAF Maintenance Manual and
Bifrost Maintenance Manual Scientific and Technical Reports
2. TITLE OF THE DATA ITEM
C002
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 3: MAINTENANCE MANUAL SHALL INCLUDE INSTALLATION
INSTRUCTIONS AS APPROPRIATE FOR ALL PRODUCTS/COMPONENTS
2. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND
SHALL INCLUDE INCORPORATE UPDATES TO THE MAINTENANCE MANUAL
3. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY
4. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC
DOWNLOAD IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY AND/OR
ADOBE PDF COMPATIBLE FORMATS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
Fa1
SFAE-STRI-SE-CSSPWS 3.9, 3.9.1
5. CONTRACT REFERENCE
DI-IPSC-81442A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
OneSAF Version Description Document Software Version Description (SVD)
2. TITLE OF THE DATA ITEM
C003
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER IPSC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
06 JUL 2017
H. DATEG. PREPARED BY
Robbins, Bruce
1. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL
INCLUDE UPDATES TO THE VERSION DESCRIPTION DOCUMENT.
2. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY
3. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED IN MICROSOFT OFFICE
FORMAT USED BY THE U.S. ARMY AND/OR ADOBE PDF COMPATIBLE FORMATS.
4. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSS PWS 3.14
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE OneSAF User Training Material and Bifrost User Training ManualScientific and Technical Reports
2. TITLE OF THE DATA ITEM
C004
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Figaroa, Rodney
I. APPROVED BY
06 JUL 2017
H. DATEG. PREPARED BY
Robbins, Bruce
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND
SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS
2. BLOCK 13: REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE
DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE
DELIVERED 15 DAYS PRIOR TO CONDUCT OF THE TRAINING.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA
IN MICROSOFT OFFICE 2013 FORMAT. GRAPHIC PACKAGES USED TO CREATE
FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2013 AND/OR ADOBE PDF COMPATIBLE FORMATS.
4. THE GOVERMENT WILL HAVE 5 WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT
COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
SFAE-STRI-SE-CSSPWS 3.14
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE OneSAF Developer Training Material and Bifrost Developer Training MaterialScientific and Technical Reports
2. TITLE OF THE DATA ITEM
C005
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-XX-XXXXOneSAF
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
C
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATE
Tran, Oanh
I. APPROVED BY
07 JUL 2023
H. DATEG. PREPARED BY
Orozco, Jose
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND
SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS
2. BLOCK 13: REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE
DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE
DELIVERED 15 DAYS PRIOR TO CONDUCT OF THE TRAINING.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC DOWNLOAD
IN MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH MICROSOFT OFFICE FORMAT USED BY THE U.S. ARMY
AND/OR ADOBE PDF COMPATIBLE FORMATS.
4. THE GOVERMENT WILL HAVE 5 WORKING DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT
COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS
1 SFAE-STRI-SE-CSS
1 ACC-ORL-OPC
2 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
| A001_CDRL |
| A002_CDRL |
| A003_CDRL |
| A004_CDRL |
| A005_CDRL |
| A006_CDRL |
| A007_CDRL |
| A008_CDRL |
| B001_CDRL |
| B002_CDRL |
| B003_CDRL |
| B004_CDRL |
| B005_CDRL |
| B006_CDRL |
| C001_CDRL |
| C002_CDRL |
| C003_CDRL |
| C004_CDRL |
| C005_CDRL |
File details come from the government source that posted it. Updated .