ATTACHMENT 4_DRAFT_v12.0 TPO Memo 8 July 21.pdf
PDF 246 KB Posted
- Attached to
- OneSAF SSN W900KK-22-R-0037 Documents
- Solicitation number
- W900KK-22-R-0037
About this file
This memorandum documents the results of the OneSAF Version 12.0 Requirements Priority Board meeting held on May 27, 2021. The board prioritized 27 requirements submitted by the Army's six modeling and simulation communities for inclusion in OneSAF v12.0, which is scheduled for delivery in June 2023. The top five ranked requirements approved for funding are: degraded operations multi-domain operations modeling; high-resolution air defense radar modeling; COBWEBS improvements; long range precision munition modeling; and operational environment modeling of Chinese entities. Additional requirements will be funded if remaining funds are available after completing these top priorities. Mission command concurrency, terrain format concurrency, classified data standards, and information assurance security are also funded as part of OneSAF v12.0 development. The related pre-solicitation lists OneSAF SSN W900KK-22-R-0037 as the opportunity, to be awarded by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM FOR RECORD
SUBJECT: OneSAF v12.0 Requirements Prioritization Board (RPB)
1. References
a. MOA, OneSAF Requirement Prioritization Process, 10 May 2005.
b. 12.0 Priority Requirements RIB 21 May 2021 (Excel). (Enclosure 1).
c. 12.0 RPB Slides 27 May 2021 (Power Point) (Enclosure 2).
2. General. TRADOC Proponent Office (TPO)-Constructive/ OneSAF, with Pd OneSAF support, conducted OneSAF Version 12.0 Requirements Priority Board (RPB) teleconference 27 May 2021, with the six OneSAF M&S Communities (Intelligence, Experimentation, Acquisition, Analysis, Training and Test & Evaluation (56 Attendees)) using Microsoft Teams.
3. The purpose of the OneSAF v12.0 Requirements Board is to identify all new Pre- Planned Product Improvement requirements and prioritizing these requirements for by the six OneSAF Modeling & Simulation communities development in OneSAF 12.0 in
FY 23/24.
a. A total of 27 requirements were submitted for OneSAF Version 12.0 RPB from the Army six Modeling & Simulation communities. Pd OneSAF determined there will be $1.1 million available for v12.0 development. Delivery of OneSAF V12.0 is schedule for June 2023.
b. Each of the OneSAF M&S Communities voted on the five requirements to be developed for OneSAF version 12.0. AMSO funded a number of MDO Use-Case Modeling of new entities.
4. Specific. The following development initiatives were approved and prioritized:
a. Fund RIB 1, Degraded Operations MDO,
b. Fund RIB 2, High-Resolution Air Defense Radar,
c. Fund RIB 3, V12 COBWEBS Improvement,
d. Fund RIB 4, Long Range Precision Munition,
e. Fund RIB 5, OPFOR Concurrency: Operational Environment Concurrency
(Chinese Entities),
5. The following will be developed if additional funds are available or cost savings:
DEPARTMENT OF THE ARMY
NATIONAL SIMULATION CENTER
410 KEARNY AVENUE
FORT LEAVENWORTH, KANSAS 66027
ATTENTION OF:
REPLY TO
ATZL-CTN-O 8 July 2021
ATZL-CTN-O
SUBJECT: Requirements for OneSAF v12.0 Development
a. Fund RIB 6, Effects of Degraded PNT,
b. Fund RIB 7, Terrain Reasoning,
6. Mission Command concurrency, Terrain format concurrency, Classified Data Standard File Format, and Information Assurance Security are funded as part of the OneSAF 12.0 Development.
2 Encls JOHN N. DVORAK
1. V12.0 P3I prioritization_2 May 20 LTC, AR (FA57)
2. V12.0 RPB Slides Final, 1 May 20 Director, TPO Constructive
DVORAK.JOHN.
NEUMANN.104
0085757
Digitally signed by
DVORAK.JOHN.NEUMANN
.1040085757 Date: 2021.07.08 13:38:36 -05'00'
The above referenced enclosures are unavailable.