Exhibit R Proposal Form.pdf

PDF 278 KB Posted

Attached to
Fermilab - Removal and replacement of roofing systems
Solicitation number
ISD-356855-RK
Issued by

About this file

This document is an Exhibit II Request for Proposal (RFP) from the Fermi Research Alliance, LLC (FRA) for the removal and replacement of roofing systems at the Fermi National Accelerator Laboratory (FNAL) Site 40 Low Level Waste Handling Building. The project requires furnishing all supervision, labor, materials, tools, and equipment necessary to remove and dispose of the existing roofing and insulation and replace it with a new SBS Asphalt 4CID CR G roofing system. The work also includes relocation and reinstallation of existing roof equipment, removal and replacement of roofing trim, fascia, gravel stops, and coping, as well as a new ballasted roof edge railing system. The RFP provides the project description, location, and technical specifications, and requires offerors to submit their firm fixed price proposal by September 24, 2024 at 3:00 PM Central Time. Payment terms are Net 30 Days unless otherwise specified.

View the file

Other files

File Type Posted
Amendment No. 1 Fermilab Removal Systems.pdf PDF
Exhibit T 10-4-101_Site 40 LLRW_V2024_Roof-G02-REV1.pdf PDF
Exhibit S Request For Clarifications v1.pdf PDF
Exhibit 1- REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS TO OFFERORS Roof Replacement_Site40 v2.pdf PDF
Exhibit Q 10-4-101_Site 40 LLRW_Roof Replacement drawing set_240913.pdf PDF
Exhibit D FL-41 (Rev 12.22) - Bid Bond.pdf PDF
Exhibit M Site40_013100_ESH_Requirements_3-2022.pdf PDF
Exhibit F Performance Bond FL-40 (Rev 12.22).pdf PDF
Exhibit G Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit I Proposal Certifications Form PUR 466 Rev. 1 (10142021).pdf PDF
Exhibit N Site 40 013300 Submittals 240913.pdf PDF
Exhibit O Sample Subcontract.pdf PDF
Exhibit P Wage Determinations.pdf PDF
Exhibit J Subcontractor Annual Representations Certifications (SARC) Form SARC (Rev. 3) (04082022).pdf PDF
Exhibit H Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf PDF
Exhibit A FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Exhibit B 2022 Construction Insurance Requirements.pdf PDF
Exhibit E Payment Bond FL 42 (Rev 12.22).pdf PDF
Exhibit C SOW Site40_LLRW Roof Replacement_240913.pdf PDF
Exhibit K FAR 52-219-9-Small-Business-Subcontracting-Plan-.pdf PDF
Exhibit L Site40 010010_General_Requirements_3_2022_240913.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT II REFERENCE

REQUEST FOR PROPOSAL

FERMI RESEARCH ALLIANCE, LLC

REQUEST FOR PROPOSAL NO.

ISD-356855-RK

DATE September 24, 2024

TO: Fermi Research Alliance, LLC Richard Konan Email: rkonan@fnal.gov

(Date of Offer) Please enter your total firm fixed price in words and numbers:

(Dollars)($ )Firm Fixed Price

TERM OF PAYMENT: ___________________(Net 30 Days unless otherwise specified)

This Offer may be accepted for a period of Ninety (90) calendar days after the opening date unless the offeror specifies a longer acceptance period than FRA’s minimum requirement. The Subcontractor Annual Representations & Certifications (SARC) is made a part of this subcontract.

ENCLOSED IS BID GUARANTEE, CONSISTING OF: IN THE AMOUNT OF

NAME OF BIDDER (Type or Print) FULL NAME OF ALL PARTNERS (Type or Print)

BUSINESS ADDRESS (Type or Print) Include Zip Code

EMPLOYER I.D. NO.

BY (Signature in ink)(Print or Type Name)

TITLE (Print or Type)

REQUEST FOR PROPOSAL NO:

TITLE OF PROJECT:

DUE DATE AND TIME:

SUBMITTAL LOCATION:

ISD-356855-RK

SITE 40 LOW LEVEL WASTE HANDLING BUILDING

September 24 , 2024

3:00 P.M. CENTRAL TIME

Submit to FRA Oracle Cloud Service or: Richard Konan rkonan@fnal.gov

THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL

mailto:bquinn@fnal.gov mailto:bquinn@fnal.gov

EXHIBIT II
REQUEST FOR PROPOSAL NO.
FESS-317353-BWQ
April 16, 2021
TITLE OF PROJECT:
THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL

File details come from the government source that posted it. Updated .