Exhibit C SOW Site40_LLRW Roof Replacement_240913.pdf
PDF 174 KB Posted
- Solicitation number
- ISD-356855-RK
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity issued by the Fermi National Accelerator Laboratory (FNAL) for the removal and replacement of roofing systems on an existing building at the FNAL site in Batavia, Illinois.
The SOW requires the subcontractor to furnish all supervision, labor, materials, tools, and equipment necessary to remove and dispose of the existing roofing and insulation down to the bare roof decking, and replace it with a new SBS Asphalt 4CID CR G roofing system. The work also includes the relocation and reinstallation of existing roof equipment, removal and replacement of all roofing trim, fascia, gravel stops, and coping, as well as the installation of a new ballasted roof edge railing system. The project has a total duration of 75 calendar days from the Notice to Proceed (NTP), with key milestones at 0 days (NTP), 20 days (all material submittals), and 75 days (project completion). The subcontractor is responsible for all quality assurance activities, and no government-furnished property is anticipated for this project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) –
SITE 40 LOW LEVEL WASTE HANDLING BUILDING
September 13, 2024
1.0 INTRODUCTION AND BACKGROUND
Fermi National Accelerator Laboratory (FNAL) is requesting a proposal for removal and replacement of roofing systems; one low roof and one high bay roof, at one existing building.
The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of
Batavia, Illinois. The project is in DuPage County, located on West Batavia Road, and East of Receiving
Road. Refer to sheet G-01 of drawing set for vicinity map.
2.0 SCOPE OF WORK:
The Subcontractor shall furnish all required supervision, labor materials, tools, plant, and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.
All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.
Work will include:
A. Furnish all labor, materials and equipment required to remove and dispose of existing roofing and insulation down to bare roof decking. Replace with new SBS Asphalt 4CID CR G roofing systems, including miscellaneous associated work as described in the drawing set "10-4-101_Site 40
LLRW_CCR_RoofReplacement_200321.pdf”; ISD project number 10-4-101; dated 09/13/24.
B. Provide all associated work including but not limited to relocation and reinstallation of existing roof equipment; removal and replacement of all roofing trim, fascia, gravel stops and coping.
C. Furnish all labor, materials and equipment required for new ballasted roof edge railing system as described in the drawing set.
3.0 Deliverables
The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications.
4.0 Quality Assurance
A Fermilab Construction Coordinator will be assigned to this project. Refer to Specification section
010010, GENERAL REQUIREMENTS.
The Subcontractor is responsible for all activities necessary to manage, control, and document that work complies with the Subcontract documents. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by his/her organization, suppliers, sub-tier contractors, technical laboratories, and consultants.
5.0 Government - Furnished Property
No roofing materials and equipment necessary for completion are anticipated to be furnished for this project by FRA.
6.0 Security
All personnel working at Fermilab are required to provide Real ID and obtain badging from the
Fermilab Badging Office.
Compliance with the Fermilab COVID 19 requirements in effect at the time the work is performed is mandatory
7.0 Schedule/ Period of Performance
This project includes the following milestones:
1. Milestone 0: 0 Calendar Days- NTP.
a. This milestone marks the point where construction work may begin.
2. Milestone 1: 20 Calendar Days – All Material Submittals
a. The Notice To Proceed (NTP) represents the basis of the start of the project duration.
3. Milestone 2: 75 Calendar Days – Project Complete
a. The Project Complete milestone marks the completion of the project including punchlist items, clean-up and acceptance of as-built drawings and if required, submittals.
Encl:
10-4-101_Site 40 LLRW_Roof Replacement drawing set_240913.pdf
Site40 013100_ESH_Requirements_3-2022.docx
Site 40 013300 Submittals_240913.docx
Site40 010010_General_Requirements_3_2022_240913 .docx