EXHIBIT Q - PACT Space Module Design Guide.pdf

PDF 269 KB Posted

Attached to
X1DZ--Berks Community Base Outpatient Clinic
Solicitation number
36C24425R0038
Issued by

About this file

This document is Exhibit Q from the PACT Space Module Design Guide, showing architectural diagrams and specifications for a VA Community-Based Outpatient Clinic (CBOC) prototype layout. The document focuses on Section 4.0 Planning and Design, specifically subsection 4.1 Clinic Organization.

The design features a Team Work Zone approximately 30 feet wide with adjacent consultation/exam rooms, patient corridors, and support areas. The layout includes dual access points for some patient care rooms and single door access for others, with approximately six patient care rooms along the Patient Corridor. Key spaces include a teamwork support zone, staff corridor, medication area, procedure room, group care room, patient transition area, and various consultation/exam rooms. The design emphasizes efficient flow between staff and patient areas while maintaining appropriate separation, with specific consideration given to square footage requirements and space utilization in the Team Work Zone.

View the file

Other files

File Type Posted
36C24425R0038 0004.docx DOCX document
36C24425R0038 0001_1.docx DOCX document
EXHIBIT B - AgencyTechnical Requirements Final Revision.pdf PDF
EXHIBIT AC - LA-23-04 FAR Clause 52.204-27.pdf PDF
EXHIBIT D - 3516 Solicitation Provisions.Oct. 2023.pdf PDF
EXHIBIT W - Signage Design Manual.pdf PDF
EXHIBIT C - Security Requirements.FSL Level II.pdf PDF
EXHIBIT G - Form 1217 - Lessor_s Annual Cost Statement.Nov. 2016.pdf PDF
EXHIBIT J - Security Standards.pdf PDF
EXHIBIT M - Unit Price List. Berk County.xlsx XLSX spreadsheet
EXHIBIT AD.VA Provision Addendum Alternate Protest Procedure Real Property Lease Procurements.pdf PDF
EXHIBIT A - 36C24425L0008.docx DOCX document
EXHIBIT L - DOL Wage Determination 02.pdf PDF
EXHIBIT Z - Past Performance Questionnaire.pdf PDF
EXHIBIT K - Security Unit Price List FSL II Oct 2024.xlsx XLSX spreadsheet
EXHIBIT H - Prelease FPLS Evaluation Form 12000.pdf PDF
EXHIBIT F - 1364 Proposal to Lease Space.Jan. 20230.pdf PDF
36C24425R0038.docx DOCX document
EXHIBIT AA - FAR 52.204-24 Representation Digital.pdf PDF
EXHIBIT O - Contract Submittal Schedule.docx DOCX document
EXHIBIT AB - FAR 52.204-25 Reporting Clause 8 2020.pdf PDF
EXHIBIT P - Space Requirement.pdf PDF
EXHIBIT E - 3517B General Clauses.Oct. 2023.pdf PDF
EXHIBIT L - DOL Wage Determination.pdf PDF
EXHIBIT N - Tenant Improvements Cost Summary TICS Table Jul. 2022 .xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PACT Space Module Design Guide 2015

U.S. Department of Veterans Affairs Office of Construction and Facilities Management

4.0 PLANNING AND DESIGN

4.1 Clinic Organization

31’-0”

+/- MAX.

S

IN

G

LE

D O

O R

A C

C E

S S

STAFF CORRIDOR

TEAMWORK ZONE

E Q

P T

MEDICATION

PATIENT TRANSITION AREA

TEAMWORK SUPPORT ZONE

PA

TI

E N

T C

O R

R

ID

O R

PA

TI

E N

T C

O R

R

ID

O R

STORAGE

PROC

ROOM

STAFF TLT

GROUP CARE

ROOM

PAT. TLT

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

SUPPORT

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

Figure 4.1-2 PACT Prototype Design Diagram

CONSULT/

EXAM

PATIENT CORRIDOR

In parallel to the development of the PACT Space Module, VA-CFM was conducting a CBOC Prototype Study through a VA Innovation Project. This Study arrived at a variation of the PACT Space Module;

the Team Work Zone is approximately 30 feet wide in the Prototype developed in the Study.

This width provides a greater net square foot area in the Team Work Zone. With this wider spacing, the Team Work Zone in the future could be reconfigured to include two 6’-0” wide corridors and enclosed functional space.

Utilization of the CBOC Prototype requires additional PACT Care Team members to be located in this Zone. To maintain the program level of net square foot area in the Team Work Zone, the length of the zone is shorter as compared to the PACT Space Module’s Team Work Zone. This results in approximately six (6) patient care rooms being located along the Patient Corridor with single door access vs. the dual door access as provided in patient care rooms that are located adjacent to the Team Work Zone. Staff in turn will utilize the Access Hallway and co-mingle with patients in the Patient Corridor to access these outer rooms.

If this outer layer of patient care rooms is positioned adjacent to the Team Work Zone, the length of the Team Work Zone would become greater, providing an excess of net square foot area in the Work Zone.

CONSULT/

EXAM

PAT. TLT

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

CONSULT/

EXAM

S U

P P

LY

EXHIBIT Q

LEASE NO. 36C24425L0008 LESSOR:___________ GOVERNEMENT:_____________

Berk CBOC

File details come from the government source that posted it. Updated .