This file is a Tenant Improvements Cost Summary (TICS) Excel template for contract 36C24424R0034, which appears to be related to a VA clinic project in Berks County. The template is designed to capture detailed cost breakdowns for both tenant improvements (TI) and shell construction work across 23 construction divisions, including general requirements, site work, concrete, masonry, metals, woods/plastics, thermal/moisture protection, doors/windows, finishes, specialties, equipment, furnishings, special construction, HVAC, plumbing, electrical, lighting, communications, security, and exterior work.

The template includes sections for material and labor costs, with formulas to calculate total costs, contractor fees, architectural/engineering fees, lessor soft costs, overhead, and profit margins. While the file provides the structure for cost reporting, it contains no actual cost data, as all fields show zero values or blank entries. The template appears to be part of a larger solicitation package for the Department of Veterans Affairs Veterans Health Administration VISN 4 facility project.

View the file

Other files

File Type Posted
36C24425R0038 0004.docx DOCX document
36C24425R0038 0001_1.docx DOCX document
EXHIBIT B - AgencyTechnical Requirements Final Revision.pdf PDF
EXHIBIT AC - LA-23-04 FAR Clause 52.204-27.pdf PDF
EXHIBIT D - 3516 Solicitation Provisions.Oct. 2023.pdf PDF
EXHIBIT W - Signage Design Manual.pdf PDF
EXHIBIT C - Security Requirements.FSL Level II.pdf PDF
EXHIBIT G - Form 1217 - Lessor_s Annual Cost Statement.Nov. 2016.pdf PDF
EXHIBIT J - Security Standards.pdf PDF
EXHIBIT Q - PACT Space Module Design Guide.pdf PDF
EXHIBIT M - Unit Price List. Berk County.xlsx XLSX spreadsheet
EXHIBIT AD.VA Provision Addendum Alternate Protest Procedure Real Property Lease Procurements.pdf PDF
EXHIBIT A - 36C24425L0008.docx DOCX document
EXHIBIT L - DOL Wage Determination 02.pdf PDF
EXHIBIT Z - Past Performance Questionnaire.pdf PDF
EXHIBIT K - Security Unit Price List FSL II Oct 2024.xlsx XLSX spreadsheet
EXHIBIT H - Prelease FPLS Evaluation Form 12000.pdf PDF
EXHIBIT F - 1364 Proposal to Lease Space.Jan. 20230.pdf PDF
36C24425R0038.docx DOCX document
EXHIBIT AA - FAR 52.204-24 Representation Digital.pdf PDF
EXHIBIT O - Contract Submittal Schedule.docx DOCX document
EXHIBIT AB - FAR 52.204-25 Reporting Clause 8 2020.pdf PDF
EXHIBIT P - Space Requirement.pdf PDF
EXHIBIT E - 3517B General Clauses.Oct. 2023.pdf PDF
EXHIBIT L - DOL Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

EXHIBIT N - 36C24424R0034
TENANT IMPROVEMENTS COST SUMMARY (TICS)
for0NUSF SF=- 0
Agency:0TIA PER NUSF SF=$ - 0
0Location:0TOTAL TIA$ - 0
RU FactorERROR:#DIV/0!RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Site work & Demolition$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Foundations / Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Woods & Plastics$ - 0$ - 0
Div 7Thermal & Moisture$ - 0$ - 0
Div 8Doors & Windows$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 15General Construction$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23HVAC$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications, Security & Other Elec. Systems$ - 0$ - 0
Div 28.1Electrical safety & Security$ - 0$ - 0
Div 28.2Security$ - 0$ - 0
Div 32Exterior$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs)$ - 0$ - 0
Other Lessor Soft Costs***$ -$ -
Taxes0.00%
SubtotalLessor's Costs:
Lessor's Overhead and ProfitPercent$ - 0$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0$ - 0
Cost per NUSF SFERROR:#DIV/0!ERROR:#DIV/0!
Notes:Cost per RSFERROR:#DIV/0!ERROR:#DIV/0!
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the DEFINITIONS tablein the work book for the breakdown.
***Other Lessor Soft Costs: typically project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. Provide separate breakdown separately or within the INPUT PROJECT INFO worksheet.
****Where document uses ANSI/BOMA or ABOA replace all occurrances with Net Usabel Square Feet (NUSF).

INPUT PROJECT INFO

INFORMATION NEEDED TO COMPLETE TICS TABLE
LEASE 36C24425L00038
Agency
Location: City, State
General contractor fee and Lessor's overhead and profit fields are structured to allow you to choose percentage or a lump sum.
ABOA SF =
TIA PER ABOA SF =
NUSF=
DATE:
BasisAmount
Tenant Improvement General Contractor FeepercentPercent
Shell General Contractor FeepercentLump Sum
Tenant Improvement A/E Fees (per Lease)percent
Shell A/E Feespercent
Lessor's TI Project Management Fee (per Lease)percent

StevenTFreund: Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee.

TI Shell

Other Lessor Costs Established Under the Lease
TIShell
taxes (if not included on contractor's bid), material only
Lessor's Overhead and ProfitPercent$ - 0
Other Lessor Soft costs, i.e. project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. list seperately.
TIShell
project management
mortgage banking fee
counsel
travel
appraisal
permits
TOTAL$ -$ -
General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
For A/E fees established as a cost per ABOA sf, convert

INSTRUCTIONS

INSTRUCTIONS
Read and understand SHELL DEFINITION tab.

Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worsheet. This includes ANSI-BOMA Office (ABOA) square footage, soft costs, overhead and profit, fees, and taxes.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material
Description Accurately describe each item being priced.
Quantity List the quantity e.g., 1,2, 3, etc.
Unit (Example) LS,EA,GAL,LF, SF, etc.
Cost Amount
Total Total cost of all material.
Labor
Hours Time projected to perform the task.
Labor Rate Cost per hour of labor.
Total Cost of labor.
TOTAL Combines overall materials and labor.
Shell

1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.

2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.

Tenant Improvements (TI) TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out fields titled (TI), inputting only costs associated with (TI).

2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.

DATE PREPARED
CONSTRUCTION COST ESTIMATE
DIVISION 9 - FINISHES (TI)
MATERIALLabor RateLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTALHOURSLabor RateTOTAL
XYZ Paint1GAL$25.00$25.002.5$36.25$90.630.0$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Total$25.00Total$90.63Total$0.00
TOTAL$115.63TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)
ABC Paint10GAL$27.00$270.006.0$36.25$217.500.0$0.00$0.00
$0.00$0.00
$0.00$0.00
Total$217.50Total$0.00
TOTAL$423.75TOTAL$0.00

SHELL-TI DEFINITIONS

COST SUMMARY

CONSTRUCTION COST ESTIMATEMaterials
TIShell
DIVISION 1 GENERAL REQUIREMENTS$ - 0$ - 0$ - 0
DIVISION 2 SITE WORK AND DEMOLITION$ - 0$ - 0$ - 0
DIVISION 3 CONCRETE$ - 0$ - 0$ - 0
DIVISION 4 MASONRY$ - 0$ - 0$ - 0
DIVISION 5 METALS$ - 0$ - 0$ - 0
DIVISION 6 WOOD AND PLASTICS$ - 0$ - 0$ - 0
DIVISION 7 THERMAL & MOISTURE$ - 0$ - 0$ - 0
DIVISION 8 DOORS AND WINDOWS$ - 0$ - 0$ - 0
DIVISION 9 FINISHES$ - 0$ - 0$ - 0
DIVISION 10 SPECIALTIES$ - 0$ - 0$ - 0
DIVISION 11 EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 12 FURNISHINGS & EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 13 SPECIAL CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 15 GEN CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 21 FIRE SUPPRESSION SYSTEMS$ - 0$ - 0$ - 0
DIVISION 22 PLUMBING$ - 0$ - 0$ - 0
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING$ - 0$ - 0$ - 0
DIVISION 26.1 ELECTRICAL$ - 0$ - 0$ - 0
DIVISION 26.2 LIGHTING$ - 0$ - 0$ - 0
DIVISION 27 COMMUNICATIONS$ - 0$ - 0$ - 0
DIVISION 28.1 ELECTRONIC, SAFETY$ - 0$ - 0$ - 0
DIVISION 28.2 SECURITY$ - 0$ - 0$ - 0
DIVISION 32 EXTERIOR$ - 0$ - 0$ - 0

TOTAL $ - 0 $ - 0 $ - 0

A&E DESIGN

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
A & E DESIGN (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
A & E DESIGN (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 1 - GENERAL REQUIREMENTS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 1- GENERAL REQUIREMENTS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 2 - SITE WORK AND DEMO

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 2 - SITE WORK AND DEMO (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 2 - SITE WORK AND DEMO (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 3 - CONCRETE

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 3 - CONCRETE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 3 - CONCRETE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 4 - MASONARY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 4 - MASONARY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 4 - MASONARY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 5 - METAL

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 5 - METAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 5 - METAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 6 - WOOD & PLASTICS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 6 - WOOD & PLASTICS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 6 - WOOD & PLASTICS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 7 - THERMAL & MOISTURE

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 7 - THERMAL & MOISTURE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 7 - THERMAL & MOISTURE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 8 - DOORS & WINDOWS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 8 - DOORS & WINDOWS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 8 - DOORS & WINDOWS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 9 - FINISHES

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 10 - SPECIALTIES

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 10 - SPECIALTIES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 10 - SPECIALTIES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 11 - EQUIPMENT

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 11 - EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 11 - EQUIPMEN (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 12 - FURNISHINGS & EQUIP

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 12 - FURNISHINGS & EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 13 - SPECIAL CONSTRUCTION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 13 - SPECIAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 13 - SPECIAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 15 - GEN CONSTRUCTION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 15 - GENERAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 15 - GENERAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 21 - FIRE SUPPRESSION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 22 - PLUMBING

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 22 - PLUMBING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 22 - PLUMBING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 23 - HVAC

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 23 - HVAC (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 23 - HVAC (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 26.1 - ELECTRICAL

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 26.1 - ELECTRICAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.1 - ELECTRICAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 26.2 - LIGHTING

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 26.2 - LIGHTING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - LIGHTING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 27 - COMMUNICATIONS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 27 - COMMUNICATIONS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 27 - COMMUNICATIONS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 28.1 - ELECTRIC, SAFETY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 28.1 - ELECTRICAL SAFETY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.1 - ELECTRICAL SAFETY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 28.2 - SECURITY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 28.2 - SECURITY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.2 - SECURITY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 32 - EXTERIOR

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 32 - EXTERIOR (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Sheet1 image1.jpeg

File details come from the government source that posted it. Updated .