Exhibit L Tenant Improvement Cost Summary.pdf
PDF 244 KB Posted
- Attached to
- Harlingen Mental Health Clinic
- Solicitation number
- 36C24W25R0051
- Issued by
-
Department of Veterans Affairs
About this file
The document is a Tenant Improvements Cost Summary (TICS) template for a federal lease opportunity related to the Harlingen Mental Health Clinic project. The template is a blank GSA cost breakdown form designed to itemize construction and improvement costs across 32 different Masterformat CSI system elements, including divisions such as General Requirements, Site Work, Concrete, Metals, Electrical, and Security Systems. The form is structured to capture both Tenant Improvement (TI) and Shell costs, with sections for trade costs, contractor fees, architectural and engineering fees, and total price calculations. Currently, all cost fields are populated with zero or placeholder values, indicating this is a blank template ready to be filled out with specific project cost details for the VA facility lease in Harlingen, Texas.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
for 0 ABOA SF= -
Agency: 0 TIA PER ABOA SF= -$
January 0, 1900 Location: January 0, 1900 TOTAL TIA -$
RU Factor #DIV/0! RSF= -
Masterformat
CSI
System Elements TI* SHELL**
Div 1 General Requirements -$ -$ Div 2 Site work & Demolition -$ -$ Div 3 Concrete -$ -$ Div 4 Foundations / Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Woods & Plastics -$ -$ Div 7 Thermal & Moisture -$ -$ Div 8 Doors & Windows -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 15 General Construction -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 HVAC -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications, Security & Other Elec. Systems -$ -$ Div 28.1 Electrical safety & Security -$ -$ Div 28.2 Security -$ -$ Div 32 Exterior -$ -$
Subtotal -$ -$ General Contractor Fee Percent -$ -$
Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) lump sum -$ -$ Other Lessor Costs Established Under the Lease -$ -$
Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$
Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF #DIV/0! #DIV/0!
Notes:
Cost per RSF #DIV/0! #DIV/0!
* Include all subcontractors' costs.
** Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.
TENANT IMPROVEMENTS COST SUMMARY (TICS)
Trade Costs
Lessors Initials_____________ Government Initials_____________
File details come from the government source that posted it. Updated .