Exhibit K ITD-01 Transportation Report Format.xlsx
XLSX spreadsheet 65 KB Posted
- Attached to
- EAGLE Detroit, MI W519TC-24-R-0006
- Solicitation number
- W519TC24R0006
About this file
This document contains templates and reporting formats for various transportation-related reports required under a federal contract for maintenance, supply, and transportation services. Key reports include a transportation statistical data report, non-ASC customer work request log, vehicle accident log, bus passenger log, lost/stolen GSA fuel credit card report, CBL register, wheels up/down report, locomotive projected workload report, and locomotive utilization report. The reports require data on transportation assets, passenger travel, maintenance activities, fuel usage, cargo shipments, and accident reporting. They must be submitted in Microsoft Excel format on a regular monthly, annual, or as-needed basis to the contracting officer's representative and quality assurance evaluator. The related federal contract opportunity is for maintenance, supply, and transportation services at Detroit Arsenal, Michigan under solicitation number W519TC24R0006 issued by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRLs ITD-01 Transportation Report FORMAT
| The Contractor shall provide all CDRLs in electronic format unless otherwise directed by the Government. | |||||
| Number | Report Title | Format | Frequency | Date Due | Recipients |
| 1 | Transportation Statistical Data | Microsoft Exce1 | Monthly | 5th Workday | COR/QAE |
| 2 | Non-ASC Customer Work Request | Microsoft Exce1 | Monthly | Monthly | COR/QAE |
| 3 | Vehicle Accident Log | Microsoft Exce1 | Monthly | NOTIFY GOV PERSONNEL IMMEDIATELY WHEN ACCIDENT OCCURS | COR/QAE |
| 4 | Bus Passenger Log | Microsoft Exce1 | Monthly | 5th Workday | COR/QAE |
| 5 | Lost/Stolen GSA Fuel Credit Card Report | Microsoft Exce1 | Monthly | NOTIFY GOV PERSONNEL IMMEDIATELY WHEN NOTIFIED OF LOST CARD | COR/QAE |
| 6 | CBL Register | Microsoft Exce1 | Monthly | 5th Workday | COR/QAE |
| 7 | Wheels Up/Down Report | Microsoft Exce1 | As Required | Within 2 hours from wheels up/down | COR/QAE/UMC and IOC |
| 8 | Locomotive Projected Workload For The Installation | Microsoft Exce1 | Monthly | 5th Workday | ASC, 404th, COR, ITO |
| 9 | Locomotive Utilization | Microsoft Exce2 | Monthly | 5th Workday | ASC, 404th, COR, ITO |
Transportation Statistical
| Transportation Statistical Data | ||||||||||||||||
| Functional Area | Unit | Dec-14 | Jan-15 | Feb-15 | Mar-15 | Apr-15 | May-15 | Jun-15 | Jul-15 | Aug-15 | Sep-15 | Oct-15 | Nov-15 | Total | Difference | % increase/ decrease |
| Transportation Motor Pool | ||||||||||||||||
| Extended Dispatch Vehicles | ||||||||||||||||
| Vehicles on Dispatch to Authorized Customers | Number |
General Dispatch Vehicles Number
| Bus Support (incl driver; do not include Non-ASC Customer or WTU Trips ) | |
| Shuttle Bus Riders | Number |
Troop Lift Support Riders Number
Tractor/Trailer Support (incl driver)
Vehicles Coordinated for Maintenance Number
| Licenses (Non-ASC Customer Service) | |
| Requests Received | Number |
Licenses Issued Number
| Passenger Travel/Movements | |
| Number of Moves Processed for Charter Bus Support | Number |
Individual Passengers Moved by Commercial Bus (Govt Ticket) Number
Passengers Moved by Air Travel Number
Portcalls Processed Number
Govt Transportation Requests (GTR) Issued Number
| Personal Property Movements | |
| Customers Counseled on Entitlements | Number |
Outbound Shipments (DPS and TOPS) Number
Army Shipments Inspected (In-person/Face to Face) Number
Army Shipments Inspected (Virtual and/or Telephonic) Number
Joint Service (Non-Army) Shipments Inspected (In-person/Face to Face) Number
Joint Service (Non-Army) Shipments Inspected (Virtual and/or Telephonic) Number
Inbound Shipments (DPS and TOPS) Number
Diverted Shipments Number
DITY Moves Counseling Number
DITY Computations for Finance Number
Local Drayage Moves Processed (DPM) Number
Entitlement Extensions Coordinated Number
HHG and NTS TAC/LOA Verifications Number
Certified Storage Expiration Letters Coordinated with Trans Officer Number
Storage Extensions (Inbound&NTS) Coordinated Number
POV Storage Actions Processed Number
Reimbursements Coordinated Number
Excess Cost Calculations Prepared Number
Collection Actions Prepared Number
Retirement/Separations/etc. Briefings Conducted Number
Reweighs Processed Number
| Outbound Freight Shipments | |
| Shipping Documents Received from Customers | Number |
CBLs Processed Number
Small Packages Processed Number
Rail Moves Processed (number of CBL Included with CBL Processed above) Number
Outbound Shipments picked up on schedule (CBL + Small package) Number
Total Shipped Pounds
Route Requests Processed to SDDC on DD Form 1085 Number
Equipment Load Plans Prepared Number
Transportation Discrepancy Reports Processed Number
REPSHIPS for AA&E Number
REPSHIPS completed within 2 hours of shipment departure Number
AA&E Shipments requiring TDRs Number
AA&E Shipment TDRs completed within 24 hours Number
| Movement Automation | |
| RFID/CCID Tags Written | Number |
HAZMAT Documents Reviewed Number
Military Shipping Labels Created Number
Deployment Assets inventoried (number of items on hand) Number
| MPA OPS | |
| MPA OPS Supported | Number |
Rolling Stock Inspected Number
| Air Load OPS | |
| Air Load Missions Conducted | Number |
Air Load Plans Processed Number
Joint Inspections Performed Number
| MHE Support | |
| MHE Unit Movements Supported | Number |
| Container OPS | |
| Container Inspections for packing (unit) | Number |
Container Work Orders Submissions Number
Containers Moved (by Rail, Truck, etc?) Number
NOTES:
Non-ASC Work Req Non-ASC Customer Work Request
| 3/1 IBCT |
| REDEPLOYMENT (OCP T/I) |
| OCO FUNDED |
Item Total # Hours/ Buses Cost Per Total Daily Cost Miles Cost per Mile Mileage Cost Overtime Hours Overtime Cost Total
Vehicle Accident Log
| Vehicle Accident / Damage Log YYYY | ||||||||||||
| # | Unit | GSA Tag # | Accident Date | Date Reported | Estimate of Repair | Classification | Description of Accident | POC DD Form 200 | Repairs Complete | Final Bill | Driver Responsible | Remarks |
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 | ||||||||||||
| 5 | ||||||||||||
| 6 | ||||||||||||
| 7 | ||||||||||||
| 8 | ||||||||||||
| 9 | ||||||||||||
| 10 | ||||||||||||
| 11 | ||||||||||||
| 12 | ||||||||||||
| 13 | ||||||||||||
| 14 | ||||||||||||
| 15 | ||||||||||||
| 16 | ||||||||||||
| 17 | ||||||||||||
| 18 | ||||||||||||
| 19 | ||||||||||||
| 20 | ||||||||||||
| 21 | ||||||||||||
| 22 | ||||||||||||
| 23 | ||||||||||||
| 24 | ||||||||||||
| 25 | ||||||||||||
| 26 | ||||||||||||
| 27 | ||||||||||||
| 28 | ||||||||||||
| 29 |
Bus Passenger Log
| Daily Bus Passenger Log | ||||||
| Month/Year | ||||||
| # | Date | Data Entry In/Start Time | Data Entry End Time | Time | Pickup | |
| Location | Destination | |||||
| Location | Miles | |||||
| Used | Total | |||||
| Pax | TMP Driver | Other | Comment | |||
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 |
Lost Stolen GSA Credit Card
| Lost/Stolen GSA Fuel Credit Card Report | ||||||
| Month | ||||||
| Unit | Vehicle Tag Number | Date Notified by Unit | Date Reported to GSA | Date Reported to COR/QAE | Brief Description | Action Taken |
CBL Register
| CBL Register (there are multiple tabs to include Small Package) | ||||||||||||||||||
| Category | Load Type | CBL# | CBL Creation Date | SCAC | Fort/ Origin | Fort/ Destination | Unit | WGT | Cost | PCS | DOCs | CBLs | Pick Up on Time | Secure | CXL | TCMD | Route Req | Initials |
Wheels Up Down Report
| Wheels Up Down Report | |
| Reporting Installation: | POC: |
| Air Field: | Inbound Freight: |
| Mission Number: | Type Aircraft: | |||
| Tail #: | POE: | POD: | ||
| Actual Departure (Wheels Up): | Actual Arrival (Wheels Down): |
| DTG (Zulu Time) | DTG (Zulu Time) | |||
| Actual Cargo Totals | ||||
| Total PAX | Total Cargo | Type of Cargo |
PAX S-tons Cargo S-tons
ULN
ULNs that were closed out:
Unit
Locomotive Projected Workload
| Locomotive Projected Workload For The Installation | ||
| 30 Days | ||
| Projected Workload | Dates | Dest |
| 60 Days | ||
| Projected Workload | Dates | Dest |
| 90 Days | ||
| Projected Workload | Dates | Dest |
| 120 Days | ||
| Projected Workload | Dates | Dest |
| Past Moves | ||
| Completed Workload | Dates | Dest |
| Intraplant Switches | ||
| Completed Workload | Dates | Dest |
Locomotive Utilization
| Locomotive Number XXX Utilization | |||||
| Put Into Service On DDMMMYY | |||||
| Current Hours (Date) | Last Hours (Date) | Hours Used | Fuel (gals) | Miles as of Date | |
| Gen 1 | Gen 1 | Current | Current | ||
| Gen 2 | Gen 2 | Last | Last | ||
| Gen 3 | Gen 3 | Used | Total |
| Issues | Date Reported | POC |
| No Pno roblems |
| Corrected Issues | |||
| Issue | Reported | Corrected | Fixed by |
| Abnormal Occurrences | ||
| Issue | First Date Noted | Frequency |
File details come from the government source that posted it. Updated .