About this file

This document is a Building Information Sheet that provides details about the TSA Boise Airport (Leased Space) facility. The facility is a 3-story building with approximately 9,174 square feet of cleanable interior space. The key work requirements include carpet cleaning, office space cleaning, recycling, restroom cleaning, trash collection, and high cleaning (above 70 inches). The cleaning schedule varies by floor, with Floors 2 and 3 having different frequencies. The document also references a separate, related federal contract opportunity for the TSA Boise Airport Janitorial Services, which is Solicitation Number 47PL0224Q0029 issued by the General Services Administration (GSA) Region 10.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING INFORMATION SHEET

The figures below are estimates based on the information that is currently available, therefore, it is the Contractors responsibility to verify all the information. When necessary and if available, the COR will provide access to assignment drawings and blueprints.

1. BUILDING DATA:

Name and Building Number Boise Airport Gowen Field

Building Location Boise Idaho

Population Approximately 100

Number of Stories 3

Normal Building Operating Hours 24 hours per day, 7 days a week

2. BUILDING STATISTICS AND ITIMIZED WORK REQUIREMENTS:

INTERIOR SPACE

CLEANABLE SQUARE FEET 9, 174 sq ft

MAJOR WORK ITEMS INCLUDED IN INTERIOR SPACE

✓ Carpet cleaning of common areas ✓ Office space and other room cleaning

✓ Carpet spotting ✓ Open, close, & secure entrance doors

✓ Carpet vacuuming (traffic & thorough) ✓ Recycling from building and desk side

✓ Drinking fountain/interior or exterior ✓ Room cleaning

✓ Dusting horizontal areas (70” & below) ✓ Snack bar/vending & break areas

✓ Elevators ✓ Stairways

✓ Elevator rug maintenance (vac/clean) ✓ Storage space

✓ Entrance rug maintenance (vac/clean) ✓ Toilet room cleaning & sanitation

✓ Entrances, lobbies and corridors ✓ Toilet room supply & restock

✓ Floor maintenance ✓ Trash collection from work areas

✓ Venetian blinds dusting

✓ High cleaning (above 70 inches) ✓ Warehouse areas

✓ Windows (interior)

MAJOR WORK ITEMS INCLUDED IN INTERIOR AREAS

Task Approximate Square Footage and Comments

✓ FSD Offices 3rd floor, 4300 sq ft

✓ Training Office 3rd floor, 1631 sq ft

✓ Break Area 2nd floor, 1897 sq ft

✓ Coordination Ctr 2nd floor, 300 sq ft

✓ Locker and Restroom 2nd floor, 300 sq ft

High Cleaning 1X per year

Windows 67 total

SPECIFIC ROOMS/AREAS REQUIRING A DIFFERENT CLEANING SCHEDULE

Floor 2 – Monday through Sunday including Federal Holidays.

Floor 3 – Monday through Friday Excluding Federal Holidays

COMMON CARPET AREAS TO BE CLEANED

The COR will provide a marked up drawing of carpet areas that need to be cleaned as follows:

1. All common carpet areas 1X per year (7985 sq ft)