Exhibit I ODOT Standard Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- S-73000-00017818
- Issued by
- Josephine County, Oregon
About this file
This document consists of Oregon Department of Transportation (ODOT) Standard Drawings for Midwest Guardrail Systems, specifically addressing guardrail installation specifications and components. The drawings provide technical guidance for the emergency guardrail removal and replacement project on US Highway 26 at milepost 107.9-110.1 in Jefferson County, Oregon, where fire-damaged guardrail and associated components require immediate replacement. The project scope includes removal and replacement of up to 642 rails, 1,313 steel posts, 1,313 poly blocks, and four end treatments on the southbound shoulder on the west side of the highway. The damaged rail to be replaced will be marked with white painted "X" marks. All materials must comply with current Oregon Standard Specifications, and all work must be designed in accordance with these standard drawings under the direction of a registered professional engineer. The vendor is responsible for providing all traffic control, as traffic control will not be provided by the agency.
The standard drawings specify detailed requirements for Midwest Guardrail System components, including W-beam and Thrie beam rail elements available in multiple effective lengths (6.25 feet, 12.5 feet, and 25 feet), steel posts (W6x8.5 or W6x9), wood blocks (6x8 or 8x8), and installation hardware including bolts, nuts, washers, and anti-rotation nails. The drawings cover specific installation procedures for various conditions, including placement on slopes with different slope ratios and shoulder widths, terminal configurations, and proper spacing and alignment requirements. All posts within a guardrail run must be of the same type (either wood or steel), and blocks must be routed or toe-nailed to prevent rotation based on post material. The effective dates for these standard drawings are June 1, 2026 through November 30, 2026, indicating current regulatory compliance requirements for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers August 31 2026.docx | DOCX document | |
| Exhibit A Specifications and Special Provisions R1.pdf | ||
| Exhibit G Project Wage Rates.pdf | ||
| 00017818 Emergency Request for Bids R1~1.pdf | ||
| 00017818 ATT A Sample Contract R1.pdf | ||
| Exhibit H FHWA_1273.pdf | ||
| ATT C Bid Pricing Form R1~4.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
EFFECTIVE LENGTHSRAILTYPE
NORMAL RAIL ELEMENT DATA
GAUGE
TRANSITION
2A
Thrie beam
Thrie beam
W-beam
W-beam
6.25'
6.25', 12.5', 25'
6.25', 12.5', 25'
6.25', 12.5', 25'
10 and 12
10 and 12
10 and 12
10 and 12
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
achieve required guardrail height.
Existing posts shall not be raised. Replace posts as necessary to8.
used, see ODOT's QPL.
Wood blocks shown. Blocks of an approved alternate material may be7.
nails in top of block to prevent block rotation.
Wood block shall be toenailed to the post with two 16d galvanized6.
tolerance.
from final paved surface at face of rail, typical all types. 1-inch ±
Final paved surfacing to extend to face of post. Rail height measured5.
Lap guardrail in direction of adjacent traffic.4.
nut; trim the treated portion as needed.
/2 inch from the face of the tightened1nch to1/4 ibeyond limits of traffic lane. The bolt's threaded portion is not permitted to extend
Orient post bolts with the button head located on the side nearest the3.
guardrail.
When required by the plans, drainage curb alignment same as face of2.
See appropriate guardrail standard drawing(s) for details not shown.1.
RD402
SYSTEM TYPES
MIDWEST GUARDRAIL
R D
.d g n
REVISED DETAILS AND NOTES07-2021
11-JUL-2025N/A
J A
N
07-2025 REVISED DETAILS AND NOTES, UPDATED CAD STANDARDS
W-BEAM GUARDRAIL
For Type 3 use double thickness (2) rail elements
TYPES 2A AND 3
See General Note 3
DOUBLE SIDED WITH CHANNEL RAIL
METAL MEDIAN BARRIER
F a c e o f g u a r d r a il
(wood or steel
Post with hex nut and washer " button head bolt8 nail on each side of block, typ.
16d galvanized, anti-rotation
W-beam block rail, typ.
W-beam
See General Note 2 where required.
Drainage curb, (wood or steel
Post
F a c e o f g u a r d r a il
F a c e o f g u a r d r a il
W-beam block, typ.
Channel rail block, typ.
on each side of anti-rotation nail
16d galvanized, TYPICAL INSTALLATION
W-BEAM GUARDRAIL ASSEMBLY
nom.
8" nom.
8"
" diameter thru hole, typ.4
" diameter thru holes4
Pre-drilled
THRIE BEAM GUARDRAIL
TYPE 4 AND TRANSITION INITIAL INSTALLATION
F a c e o f g u a rd ra il nail on each side of block, typ.
16d galvanized, anti-rotation block Thrie beam and washer, typ.
bolt with hex nut
" button head8
(wood or steel Post
See General Note 2 where required.
Drainage curb, rail, typ.
Thrie beam nom.
8" nom.
8" thru hole, typ.
" diameter4 and washer, typ.
bolt with hex nut
" button head8
RD404
STEEL POST AND BLOCK
MIDWEST GUARDRAIL SYSTEM
R D
.d g n
REVISED DETAILS AND NOTES07-2021
19-JUL-2021N/A
J U
L
See general note 5
SIDEFRONT
S e e p o s t le n g th t a b le
2"
6'-9"
7'-0"
6'-6"
6'-6"
6'-6" or 6'-0"
POST LENGTHPOST SIZE
THRIE BEAM
W-BEAM
b lo c k
SIDE
7b lo c k
7"
6"
7"
W-BEAM WOOD BLOCK FOR STEEL POST
POST SPACING
4 (Transition)
Metal median barrier
2A
"83
"83
GUARDRAIL STEEL POST TABLE
TOP
TOP
TOP
TOP
W-BEAM STEEL POST
See general note 5
See general note 5
"2
6"
"4
*1
See general note 5
"4 1*1
"4
* 1
8"
8"
1" (Typ.)
1" (Typ.)1" (Typ.)
1" (Typ.) 6" to prevent rotation
Routed block
6"
"4
"4
6"
6"
"4
6" terminal sections except those on
Plain washer - All posts
Symmetry
� of
"4 3 "4 terminal sections except those on Plain washer - All posts
8" rail element W-beam
6"
8"
7"
7"
6"
6"
Symmetry � of
"2
"4
"4
4"
W6x9
W6x9 or W6x8.5
W6x9 or W6x8.5
W6x9 or W6x8.5
W6x9 or W6x8.5
"2 13'-1
6'-3" 6'-3"
"2 13'-1
6'-3"
"2
"2
"4
"4 block W-beam block Thrie beam
(See general note 3)
Post
(W6x8.5 or W6x9)
(See general note 5) " dia. hole16
13" or4
(6x8 wood block shown)
Post
W-BEAM ASSEMBLY DETAIL
(W6x8.5 steel post and 6x8 wood block shown)
(See general note 8) rail element Thrie beam
Post
THRIE BEAM ASSEMBLY DETAIL
(W6x8.5 steel post and 6x8 wood block shown)
GUARDRAIL TYPE
FRONT
4"
"4
(See general note 5) " dia. hole16
13" or4
"4 1* 1
" recessed nut8
" guardrail bolt8
" dia. hole4
" guardrail bolt8
" recessed nut8
" dia. hole4 for guardrail bolt " dia. hole16
13" or4 for post attachment through block
" dia. hole4 attachment for post through block
" dia. hole4 with washer & hex nut " guardrail bolt8 post W6x8.5 or W6x9
(Typ.)
thru hole
" dia.4
(See gen. note 7) anti-rotation nail
" dia. hole for 16d galv.4
Field drill
(See gen. note 7) anti-rotation nail
" dia. hole for 16d galv.4
Field drill
(See gen. note 7) anti-rotation nail 16d galv.
(See gen. note 7) anti-rotation nail 16d galv.
(See gen. note 7) anti-rotation nail 16d galv.
(See gen. note 7) " dia. hole4
1Field drill
(See gen. note 7) " dia. hole4
1Field drill
(See gen. note 7) anti-rotation nail 16d galv.
" on center.2 1be W6x9 and a maximum of 3'-1
8. When required by the plans, nested thrie beam steel post shall of routing the blocks.
Or, anti-rotation holes and 16d galvanized nails shall be used instead
7. Blocks shall be routed when steel posts are used to prevent rotation.
may be used. See ODOT's QPL.
6. Wood routed blocks shown. Blocks of an approved alternate material bolt holes on approaching traffic side of post web.
left, right, or both sides of web. Attach blockouts to steel posts using
5. Steel posts are shifted to accommodate bolt holes. Holes may be on
4. Dimensions shown are for nominal posts and blocks.
" hole(s) used.4 3Drill 12" below top
3. Lowest hole(s) required only when channel rail is to be installed.
requirements.
2. See Bridge Dwgs. for bridge transition guardrail post and block
1. See appropriate guardrail standard drawing(s) for details not shown.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(Pre-drilled) lternate holeA
SIDEFRONT
THRIE BEAM STEEL POST
SIDE
THRIE BEAM WOOD BLOCK FOR STEEL POST
S e e p o s t le n g th t a b le
(Typ.)
for guardrail bolt
" dia. hole16 13" or4
(W6x8.5 or W6x9)
Post
FRONT
(6x8 wood block shown) (Routing not required)
(Typ.)
thru hole
" dia.4
(Typ.)
with washer & hex nut
" guardrail bolt8 post W6x8.5 or W6x9 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
PLACEMENT OF GUARDRAIL ON SLOPES
transition sections or anchors.
NOTE: Cases shown do not apply to terminals, from face of guardrail to the slope breakpoint
Use when there is less than a 2'-0" shoulder widening
Do not use in weak soil conditions.
(Steel post shown)
CASE 4
from face of guardrail to the slope breakpoint
Use when there is a 4'-0" or greater shoulder widening
(Wood post shown)
CASE 2
from face of guardrail to the slope breakpoint
Use when there is a 2'-6" or greater shoulder widening
(Wood post shown)
CASE 3
Sl.
V :1
H m ax im u m
Shoulder
Sl.1V:2H m axim um
CASE 1
Sl.
V :1
H m ax im u m
H m axim um
Sl.1V:1
Face of barrier
W ≥ 2'-0"
Blockout breakpoint Slope m in im u m p o s t m in im u m p o s t
Face of barrier
Face of barrier
Face of barrier m in im u m p o s t m in im u m p o s t
BlockoutBlockout
Blockout
Shoulder
Shoulder
Shoulder
W ≥ 4'-0"
Slope breakpoint breakpoint Slope breakpoint Slope
W ≥ 2'-6"
(Wood post shown)
Ground line
W6x9 steel post or W6x8.5 or 6"x8" wood post
Ground line
W6x9 steel post or W6x8.5 or 6"x8" wood post
Ground line
W6x9 steel post or W6x8.5 or 6"x8" wood post
W
< 2'-0"
Ground line post W6x9 steel W6x8.5 or
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
type: wood or steel.
All posts for guardrail run shall be of the same3.
QPL.
alternate material may be used. See ODOT's
Wood blocks shown. Blocks of an approved2.
for details not shown.
See appropriate guardrail standard drawing(s)1.
(ft)
LENGTH
POST
POST TYPE
6 Wood/Steel
6 Wood/Steel
SLOPE / EMBANKMENT TABLE
2'-0" minimum
4'-0" minimum slope of breakpoint) (Face of barrier to
W (ft)
8 Steel Less than 2'-0"
(V:H)
SLOPE
1:2 or flatter
1:1 or flatter or flatter2 11:1
8 Wood/Steel 2'-6" minimum1:1 or flatter
RD406
ON SLOPES
PLACEMENT OF GUARDRAILS
R D
.d g n
NEW DRAWING CREATED07-2021
20-JAN-2023N/A
-J A
N -2
12-2021 REVISED DETAILS AND NOTES
REVISED NOTE12-2022
RD407
W-BEAM
MIDWEST GUARDRAIL SYSTEM
R D
.d g n
REVISED DETAILS AND NOTES07-2021
19-JUL-2021N/A
J U
L
TYPICAL ELEVATION
(6x8 or 8x8)
WOOD POST
TYPICAL SECTION
TYPICAL W-BEAM RAIL ELEMENT
8"
(Typ.)
6x8 block
Post
Paved shldr.
"4
Slope break point
(Steel post shown)
6'-3"
12'-6" between splices
Mid span splice
12'-6" between splices 12'-6" between splices
"2
3'-1 "2
3'-1 6'-3" 6'-3""2
3'-1 "2
3'-1
Mid span splice Ground line
Block Post rail element
W-beam
"2
3'-1
2" (Typ.)
about � Symmetrical
6'-3"
"2 113'-6
"2 13'-1
Dir ec tio nof tra ve l
FITTINGS
(W6x8.5 or W6x9)
STEEL POST
10 ga. & 12 ga.6.25', 12.5', 25'
Effective LengthsType
2A, 3
NORMAL RAIL ELEMENT DATA
(See gen. note 2) (Where reqd.)
Drainage curb, eight (8) reqd. per splice recessed hex nut (Typ.), " splice bolt with8
(See gen. note 7) steel post W6x8.5 or W6x9
(See gen. note 7) wood post 6x8 or 8x8 element W-beam rail
(Typ.)
& recessed hex nut
" post bolt with washer8 g u a rd ra il
F a c e o f
" 4
" 4
Thkn. (Galv.)
eight (8) reqd.
each end slice bolt slot
" 8 1"x 132
31" W-beam guardrail
(Typ.)
post bolt slot
"2 1"x24 hex nut & washer " recessed8 hex nut & washer " recessed8
(See gen. note 6) 6'x8" block
SECTION THRU RAIL ELEMENT
post bolt slots "2
1" x 24
"16
"4
"32
"4
"16
(T yp
(Typ.)
" rad.8
(T yp
(T yp
0.105" nom. (Before galv.)
Base metal thkn.
")16
Tol.(-0,+ "16
(Typ.)
" rad.16 splice slots (Typ.)
" 8
1"x132
(See gen. note 5) anti-rotation nail 16d galv.
(See gen. note 5) anti-rotation nail 16d galv.
(See gen. note 5) 16d galv. anti-rotation nail pre-curved to industry standard. Install "Radius Identification Plate".
8. For guardrail installed on radii of 150' or less (5' min. radius) use rail elements
7. All posts for guardrail run shall be of the same type: wood or steel.
See ODOT's QPL.
6. Wood blocks shown. Blocks of an approved alternate material may be used.
used to prevent rotation (see Std. Dwg. RD404).
Std. Dwg. RD403). Blocks shall be rounted or toe-nailed when steel posts are
5. Blocks shall be toe-nailed to prevent rotation when wood posts are used (see paved surface at face of rail to top of rail (typ. all types). 1" ± tolerance.
4. Final paved surfacing to extend to face of post. Rail height measured from final
3. Lap guardrail in direction of adjacent traffic.
2. When required by the plans, drainage curb alignment same as face of guardrail.
1. See appropriate guardrail standard drawing(s) for details not shown.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
W-BEAM ASSEMBLY DETAILS
b. All post bolt threads to be set after assembly for wrench removal only.
".2 1" to4
1tightened nuts within limits of
a. When required by the plans, post bolts to extend beyond the
NOTES:
" rad.8
" rad.64
"8 11"2
"32
29 Mid-span
SLOT
SPLICE BOLT
SLOT
POST BOLT
at mid-span Rail splice lap eight (8) reqd. per splice with recessed hex nut, " splice bolt8 with washer & recessed hex nut " guardrail bolt8 rail element W-beam the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD416
(NUTS, BOLTS, WASHERS AND MISC.)
STANDARD HARDWARE
MIDWEST GUARDRAIL SYSTEM
R D
.d g n
13-JAN-2020N/A
J A
N
2"
4"
"2 min.
3"
1"
Slotted hole
"8 plate
Steel
"4
ALTERNATIVE No. 1 hex nut mod. heavy
"-118
10" "4
5"
(Traffic side)
"4
1"
"8
(For additional details, see Std. Dwgs. RD472 and RD473)
BASE PLATE DETAILS
box culvert, etc.
Concrete top of washer (4 reqd.)
Leveling nut & than normal for post installation.)
(Use when depth of cover is less bonded anchor
" bolt, or resin4 grout pad
" min.2
ELEVATION
RAIL WASHER
SNOW LOAD
ab
PLAN
c a d b
"16
Use on back of post.
(See general note 6) as directed by the engineer
Use in area of heavy snow, " dia. hole16 plate
" steel4
POST WASHER
SNOW LOAD PLAIN WASHER
base plate
"8
10"x6"x
Height as reqd.
post to be vertical.
W6x9 steel
"8
7"
(See general note 4)
RADIUS IDENTIFICATION PLATE
plate
" steel4
" dia. hole4
(See general note 5)
"4
L
T
"16
"32
"16
"8
RADIUS IDENTIFICATION PLATE MOUNTING DETAIL
HHf "8
H "8
12.5"
HHfH f
L
T
L
T
"16
"32
"16
"16
"8
BOLT DIMENSION TABLE
ALTERNATIVE No. 2
" GUARDRAIL POST/SPICE BOLT (BUTTON HEADED)8
" DIA. RECESSED HEX NUT8
" DIA. CARRIAGE BOLT8
slot
Splice bolt plate (See detail)
Radius identification slot
Splice bolt plate (See detail)
Radius identification rail element
W-beam rail element
W-beam base plate
"8
10"x6"x place as shown.
slotted holes, " 2
4 - 1"x1 steel post
W6x9 recess one or both sides
" deep16
1"x
Cast in place or core and install using approved resin bonding system.
6" min. penetration into concrete slabs other than bridge decks.
Furnished & installed by structure contractor when shown on structure plans.
Type C End Piece as shown.
Use rectangular Snow Load Rail washer under bolt head and nut on
Not required if Snow Load Post washer option is used.
SUPPLEMENTARY NOTES:
d c plate " steel16
"16
(L) (in.)
Length
4 min.
4 min.
4 min.
min.4 min.8
(T) (in.)
Thread Length
°(T yp terminals.
on rail element face. Snow Load Rail Washers shall not be installed on on the backside of the post and a Snow Load Rail Washer shall be placed
6. When required by the plans, a Snow Load Post Washer shall be used the P.C. of the guardrail radius.
back side of the rail element with the lowest splice bolt nearest
5. The guardrail radius identification plate is to be mounted on the after placement of digits.
" max. width. Plate shall be galvanized4
" min. height and2 shown on the Radius Identification Plate detail. Digits shall be on the plate with a raised weld bead replacing the letters "HHH",
4. Radius dimensions, in feet to the nearest 0.5 foot, shall be placed welded.
3. All indicated welds shall attain the full strength of the section see special details or Standard Drawings as called for on plans.
2. For details of guardrail connections to structural handrails, not shown.
1. See appropriate guardrail standard drawing(s) for details
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD417
END SECTIONS
MIDWEST GUARDRAIL SYSTEM
R D
.d g n
13-JAN-2020N/A
J U
L
ELEVATION
"2
SECTION B-B
PLAN
(See detail)
Terminal connector
3" min.
24" ± 1"
" rad.4
"2
"32 a p p r o x
(Typ.)
" slot8
"x132
6" ra d.
2" "2
(Typ.)
" slot8
"x132
"2
"32
25" min.
"r ad
18" "4
Use rectangular washer under bolt head and nut on Type C End Piece as shown.
Trim post as required ra d.
"r ad
ALTERNATE 1
PLAN
ALTERNATE 2
ELEVATION
(Typ.)
" slot8
"x132
"2 bolt slots (Typ.)
" splice8
"x132
W-BEAM TYPE B END PIECE
W-BEAM TYPE C END PIECE
THRIE BEAM TYPE B END PIECE
THRIE BEAM TYPE C END PIECE
ELEVATION
PLAN
ELEVATIONSECTION A-A
ALTERNATE 2
PLAN
details or Standard Drawings as called for on plans.
2. For details of guardrail connections to structural handrails, see special
1. See appropriate guardrail standard drawing(s) for details not shown.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
A
B
B
A
2"
2" ap pr ox .11
"r ad
(See detail) terminal connector
Thrie beam
(Typ.)
" slot8
"x132
"2
ALTERNATE 1
2"
"2
(Typ.)
" slots8
"x132
"4
2"
(For details not shown, see Type B End Piece)
2" "2
2" "2 in rail member
Splice bolt slot a p p r o x
Neutral axis"8
.5
ELEVATION
ELEVATION
PLAN
W-BEAM TERMINAL CONNECTOR
element
Rail
3"3"
PLAN
4" 4" 2"
"4
3"
3" "2
2'-6"
.5 end piece.
for use with alternate Type "C"
25.5" bend and hole reqd. only
S y m m e tr ic a l a b o u t
12 ga. galv. plate
10 ga. galv.
"2
(Typ.)
splice bolt slots
" 8 1"x132 element � Beam
"4
"4
3" 2"
4" 4"
(Typ.)
1" dia. holes
2'-6"
" holes4
" dia. hole4
(Optional) post bolt slot
"2 1"x24
S y m m e tr ic a l a b o u t
12 ga. galv.
Metal thkn.
12 ga. galv.
Metal thkn.
a a a a a b b b
THRIE BEAM TERMINAL CONNECTOR
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD420
TERMINAL
NON-FLARED ENERGY-ABSORBING
MIDWEST GUARDRAIL SYSTEM
R D
.d g n
19-JAN-2024N/A
J A
N
Normal edge of paved shldr.
W
E
10:1taper
Edgeofpavement
Guardrail Length of need
Non-Flared Terminal system length - Var
Edge of pavement at face of post.
Top of shldr. rock
10:1taper
Topofshldr.rock
Top ofsh ldr.r ock
3'
12'-6""2
3'- 1
Post 1
Post 3
Post 1Post 3
(Typ.)
6'-3"
Finish grade
Pay limit
Guardrail
Guardrail Length of need
Post 1Post 3
MSKT-SP-MGS (TL-3) System length = 50' - 0"
"4
6'-
(Typ.)
6'-3"
"16
5'-3
" 2
Max-Tension (TL-3) System length = 55'-
5' - 8" 4' - 7"
"2
Post 5
Pay limit
Guardrail " 2
Softstop (TL-3) System length = 50'- 9
Pay limit
Guardrail
Adjacent traffic flowPLAN
(See general note 4)
Cross slope
(See general note 3)
(S e e g e n e ra l n o te
L e n g th o f n e e d p o in t
Finish grade
Finish grade
(S e e g e n e ra l n o te
L e n g th o f n e e d p o in t
(See general note 9)
Length of need point
(See general note 9)
Length of need point
ELEVATION
(MSKT-SP-MGS Shown)
(SOFTSTOP Shown)
ELEVATION
ELEVATION
(MAX-TENSION Shown)
Anchor Post
Anchor Post
T y p m in paved shldr.
Normal edge of normal edge of paved shldr.
Extend top of shldr. rock to
9. Length of need post location varies by manufacturer.
8. "W" distance is measured to face of guardrail at end post, exclusive of end piece.
"W" 4 feet or less according to manufacturer's recommendations.
7. Install a reflectorized object marker on head of every guard rail terminal with recommendations (post count varies). Provide shop drawings to Engineer.
6. Provide guardrail terminal from ODOT's QPL. Install according to manufacturer's
See Std. Dwgs. RD443 and RD444.posts on both ends of guardrail runs is required.
terminal flared or non-flared. Paving of widened shldr. to the face ofcrashworthya
5. On two way two lane highways, both ends of guardrail runs shall be provided with
If required, maximum grade break at normal edge of shoulder 8%.
If required, maximum shoulder slope 10% for guardrail widening.
4. Cross slope to match adjacent roadway cross slope (preferred).
that the end piece is entirely off normal shldr.
3. Guardrail Non-flared terminal shall be installed with a min. 1 foot offset ensuring
E=2' or as shown on project plans.
See Std. Dwg. RD701 for drainage curbs, where required.
See project plans for details not shown.
2. See appropriate guardrail standard drawing(s) for details not shown.
test level for the project.
manufacturer's recommendations. Ensure that guardrail terminal meets appropriate
Install a guardrail terminal system that meets MASH requirements per
1. Use details shown as a general guide since manufacturer's details may vary.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
File details come from the government source that posted it. Updated .