About this file

Ocean Center Kitchen Renovation - Exhibit H Construction Documents

This file comprises architectural and engineering construction documents for the Ocean Center Commercial Kitchen Renovation Project in Daytona Beach, Florida, prepared by SGM Engineering, Inc. The documents serve as exhibit materials supporting the general contractor RFP for kitchen renovation services. The project involves comprehensive renovation of the Ocean Center's commercial kitchen facility, including demolition of existing flooring, wall finishes, and ceiling systems; installation of new finishes such as epoxy coatings, fiberglass-reinforced panels (FRP), stainless steel sheets, and painted surfaces; and coordination of mechanical, electrical, plumbing, and fire protection systems. The construction documents include general notes, abbreviations and symbols reference, demolition plans, proposed floor plans, reflected ceiling plans, and finish plans at 1/8" = 1'-0" scale. All work must comply with Florida Building Code, Florida Fire Prevention Code, NFPA standards, and OSHA regulations, with the general contractor required to hold a current Florida license. The contractor is responsible for site verification, coordination of all trades, dust control, safety planning around school operations, and restoration of any areas damaged during construction to "like new" condition.

The construction documents establish comprehensive requirements for contractor performance, including verification of all existing conditions and dimensions prior to bidding, coordination with the architect for any discrepancies, and strict adherence to manufacturer specifications for all installed materials and equipment. Work is classified as Assembly Group A-2 occupancy with specific life safety requirements, including maximum travel distances of 250 feet and provisions for emergency lighting, exit signage, fire suppression systems, and smoke detection. The contractor must schedule work to avoid interruption of school operations, implement temporary barriers with minimum 10-foot separation from occupied areas, maintain stabilized vehicular access, and provide GPR scanning for underground conduits with hand-digging requirements. The documents mandate that all work remain in compliance with fire protection standards, with notification required to Miami-Dade County Public Schools prior to disconnection of any fire suppression or detection systems, and building evacuation or approved fire watch procedures if systems are out of service for more than four hours in a 24-hour period.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

PROJECT NOTES

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE

CODES. ENGINEERING SHALL CONFORM WITH ALL APPLICABLE MUNICIPAL, STATE AND FEDERAL

REGULATIONS HAVING JURISDICTION INCLUDING ACCESSIBILITY STANDARDS AND ADA

REQUIREMENTS.

CONTRACTOR NOT TO START WORK WITHOUT INSPECTING THE SITE AND CONTACTING THE

OWNER AND A/E OF ANY DEVIATIONS FROM ORIGINAL SCOPE. THE CONTRACTOR IS TO STOP

WORK IF MORE DAMAGE IS FOUND THAN WHAT IS SPECIFIED IN THE CONSTRUCTION DOCUMENTS

AND MUST INFORM THE OWNER AND A/E.

I. GENERAL NOTES

1. THE GENERAL CONTRACTOR SHALL BE LICENSED IN THE STATE OF FLORIDA.

2. THE GENERAL CONTRACTOR SHALL VERIFY SITE EXISTING CONDITIONS AND DIMENSIONS PRIOR

TO BIDDING. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO REPORT TO THE

ARCHITECT ANY DISCREPANCY IN SUFFICIENT TIME FOR HIS REVIEW AND CONSIDERATION BEFORE

TO PROCEEDING WITH THE WORK. NO ADDITIONAL COMPENSATION WILL BE PROVIDED TO THE

CONTRACTOR FOR ANY EXPENSE DUE TO THE LACK OF EXAMINATION OR FAILURE TO DISCOVER

CONDITIONS WHICH AFFECT HIS WORK.

3. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND/OR THE CONSTRUCTION

MANAGER TO PROVIDE ALL SUBCONTRACTORS WITH ALL NECESSARY INFORMATION AS

PROVIDED. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER PORTIONS OF THE CONTRACT DOCUMENTS. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL GENERAL

NOTES, ABBREVIATIONS AND SYMBOLS. ALL NOTES ARE TO BE REVIEWED AND APPLIED TO

RELATED BUILDING COMPONENTS. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS

AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON ANY ONE SHEET ARE TO BE

APPLIED ON RELATED DRAWINGS AND DETAILS.

4. THE CONTRACTOR SHALL RESTORE TO EXISTING CONDITIONS ALL AFFECTED AREAS TO THE

ARCHITECT'S AND OWNER'S SATISFACTION. CONTRACTOR SHALL REMOVE AND/OR PROTECT

EXISTING FINISHES TO REMAIN AS REQUIRED.

5. THE GENERAL CONTRACTOR SHALL COORDINATE WORK OF ALL THE TRADES INCLUDING

ASSISTING WITH THE SCHEDULING OF WORK UNDER SEPARATE CONTRACTS.

6. ALL CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE NOTIFIED BY THE GENERAL

CONTRACTOR TO THE ARCHITECT AND REQUEST ADDITIONAL INFORMATION IN WRITING.

7. ARCHITECT IS NOT RESPONSIBLE FOR ANY CHANGES OR ADDITIONS TO THE WORK UNLESS

AUTHORIZED BY THE ARCHITECT AND CLIENT IN WRITING.

8. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS

AND PROJECT SPECIFICATIONS.

9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF

WALLS IN THE SPACE.

10. THE STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS ARE OF EQUAL

IMPORTANCE WITH THE ARCHITECTURAL DRAWINGS IN DEFINING THE WORK OF THE CONTRACT

DOCUMENTS. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CHECK WITH

THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF STRUCTURAL, MECHANICAL

AND ELECTRICAL WORK. SHOULD THERE BE A DISCREPANCY BETWEEN THE ARCHITECTURAL

DRAWINGS AND THE ENGINEERING DRAWINGS THAT WOULD CAUSE AN AWKWARD OR IMPROPER

INSTALLATION. IT SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION FOR CLARIFICATION

PRIOR TO INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE

ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE GENERAL CONTRACTOR AT HIS

EXPENSE AND AT NO ADDITIONAL COST TO THE OWNER OR ARCHITECT.

11. DURING THE ENTIRE CONSTRUCTION THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE

TO MAINTAIN CONDITIONS AT THE JOB SITE MEETING ALL REQUIREMENTS FOR OCCUPATIONAL

SAFETY AND HEALTH ACT, OSHA. THIS APPLIES TO ALL CONTRACTOR'S EMPLOYEES AND ALL

OTHER PERSONS WORKING OR VISITING THE SITE.

12. THE GENERAL CONTRACTOR SHALL PROVIDE DUST CONTROL AS REQUIRED DUE TO

CONSTRUCTION ACTIVITIES.

13. DO NOT SCALE THE DRAWINGS. THE DRAWINGS ARE NOT NECESSARILY TO SCALE. THE

CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED

FOR CLARIFICATION BEFORE COMMENCING THE WORK. EXPLICIT DIMENSIONS SHALL HAVE

PRECEDENCE OVER SCALE.

14. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHERE SPECIFIC

DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE ARCHITECT

BEFORE PROCEEDING WITH THE WORK.

15. FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE FLOOR, UNLESS OTHERWISE NOTED.

IV. MISCELLANEOUS NOTES

1. ALL BASE BUILDING INTERIOR PARTITIONS SHALL WITHSTAND MINIMUM INWARD AND OUTWARD

ACTING PRESSURES OF 5 PSF.

2. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID

MOLECULAR BREAKDOWN.

3. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR

MECHANICAL EQUIPMENT. ALL ACCESS PANELS SHALL BE CONCEALED AND LOCATIONS SHALL BE

REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING.

4. WHERE DISCREPANCIES EXIST BETWEEN THE DRAWINGS OF THE VARIOUS TRADES, CONSULT

THE ARCHITECT BEFORE PROCEEDING WITH WORK.

5. COORDINATE PLACEMENT OF ALL CEILING ELEMENTS WITH MECHANICAL, ELECTRICAL AND

INSTALLER. WHERE DISCREPANCIES EXIST BETWEEN DRAWINGS AND INSTALLATION, REVIEW WITH

ARCHITECT PRIOR TO PROCEEDING.

6. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL STIFFENERS, BRACINGS, BACKING PLATES

AND SUPPORTING BRACKETS REQUIRED FOR THE PROPER INSTALLATION OF ALL CASEWORK, AS

WELL AS ALL WALL-MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL AND/OR MISCELLANEOUS

EQUIPMENT WHETHER SHOWN OR NOT, INCLUDING ITEMS.

7. WHETHER OR NOT EXPLICITLY INDICATED, ALL GLAZING SHALL BE SAFETY GLAZED WHEN WITHIN 18" (450MM) OF THE FLOOR OR WITHIN 3'-0" (900MM) HORIZONTAL DISTANCE FROM ANY DOOR. A CERTIFICATE MUST ACCOMPANY ALL GLAZING PRODUCTS STATING THAT THE PRODUCTS CONFORM

WITH APPLICABLE CONSUMER PRODUCT SAFETY STANDARDS.

8. ALL MECHANICAL AND ELECTRICAL EQUIPMENT, LOUVERS, EXPOSED PIPING, CONDUITS, ETC.

SHALL BE FINISHED WITH INDUSTRIAL ENAMEL PAINT AND COLOR CODED AND/OR AS DIRECTED.

9. ALL RECESSED CABINETS, PANELS, BOXES LOCATED IN FIRE- RATED WALLS SHALL BE INSTALLED

AND TO MAINTAIN THE FIRE-RATED CONSTRUCTION.

10. ALL ARCHITECTURAL WOODWORK/PANELING SHALL BE TREATED WITH MATERIALS COMPLYING

WITH APPLICABLE FLAME SPREAD AND SMOKE DEVELOPMENT RATING REQUIREMENTS. ALL WOOD

USED IN BACKING AND BLOCKING SHALL BE FIRE RETARDANT TREATED.

11. BUILDING MAINTENANCE IN ACCORDANCE WITH ALL APPLICABLE CODES.

II. DIMENSIONING

1. NEW PARTITIONS ARE DIMENSIONED TO THE UNFINISHED FACE OF NEW WALLS OR FINISHED

FACE OF EXISTING CONSTRUCTION UNLESS NOTED OTHERWISE.

2. ALL DIMENSION SHALL BE VERIFIED IN THE FIELD BEFORE PROCEEDING WITH THE WORK. THE

ARCHITECT SHALL BE NOTIFIED OF ANY CORRECTION.

3. DOOR OPENINGS ARE GENERALLY DIMENSIONED TO CLEAR OPENING. DOOR OPENINGS THAT

ARE NOT DIMENSIONALLY LOCATED ARE TO BE CENTERED BETWEEN WALLS OR POSITIONED WITH ONE JAMB AGAINST AN ADJACENT WALL OR COLUMN AS SHOWN ON THE PLANS AND/OR DETERMINED

FOR THE DETAILS.

4. WHEN UN DIMENSIONED PARTITIONS APPEAR IN CONJUNCTION WITH DOOR OPENINGS, THE

DOOR WIDTH AND DOOR FRAME DETAILS DETERMINE THE LOCATION OF ADJACENT WALLS AND

FRAMES.

5. ALL DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH ALL OF THE WORK OF ALL

TRADES.

III. MECHANICAL AND ELECTRICAL AREAS

1. ALL WALLS BETWEEN MECHANICAL OR ELECTRICAL SPACES AND INTERIOR SPACES SHALL BE ACOUSTICALLY ISOLATED FROM THE INTERIOR SPACES AND SHALL MAINTAIN A MINIMUM STC RATING

OF 52.

2. GENERAL CONTRACTOR TO COORDINATE ALL MECHANICAL AND ELECTRICAL FLOOR, ROOF AND WALL SLEEVES AND ALL MECHANICAL SHAFTS WITH MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL, STRUCTURAL AND ARCHITECTURAL DRAWINGS.

3. REFER TO CERTIFIED MECHANICAL AND ELECTRICAL CONTRACTOR'S DRAWINGS AND

MANUFACTURER'S TEMPLATE DRAWINGS FOR ALL MECHANICAL AND ELECTRICAL EQUIPMENT

SUPPORTS, BOLT SETTING TEMPLATES, ISOLATIONS, SPRING ISOLATION, ETC. ALL ITEMS FOR

COMPLETE INSTALLATION SHALL BE INCLUDED WETHER OR NOT IS SHOWN ON DETAILS.

4. FIRE DAMPERS SHALL BE PROVIDED AS SHOWN AND WHEREVER AIR DUCT PENETRATE FIRE-

RATED WALLS OR CEILINGS. FIRE DAMPERS SHALL BE UL LISTED AND APPROVED.

16. ANY DETAILS, SYSTEMS, MATERIALS, (I.E. ARCHITECTURAL, STRUCTURAL, MECHANICAL, ETC.)

WHICH ARE PROPOSED TO BE CHANGED MUST FIRST BE REVIEWED BY THE OWNER, ARCHITECT

AND GENERAL CONTRACTOR PRIOR TO THE PREPARATION OF SHOP DRAWINGS.

DRAWING

1A

45925C

B

A

8D

118'-6"

LEVEL 2

LEVEL 2

118'-6"

TRUE NORTH

GB3

ROOM NAME

4-309

SHEET NUMBER

PLAN OR DETAIL

DESIGNATION

SHEET NUMBER

SECTION

DESIGNATION

A10-01

DATUM POINT

KEY NOTE

BREAK LINE

DRAWING TITLE

SEE 1D/A04-09

INTERIOR ELEVATION TAG

SHEET NUMBER

SHEET NUMBER

SYMBOLS LEGEND

PARTITION TAG

DOOR NUMBER TAG

EQUIPMENT AND FURNITURE TAG

WINDOW TYPE TAG

DRAWING REVISIONS

TOILET ACCESSORY TAG

WINDOW TYPE

SHEET GROUP

DISCIPLINE CODE

COLUMN SYMBOL &

GRID LINES

GRAPHIC SCALE

ROOM NAME & NUMBER TAG

NORTH ARROW

SPOT ELEVATION

VERTICAL ELEVATION

SHEET NUMBER ON

WHICH CONTINUATION

IS FOUND

MATCH LINE

PARTIAL PLAN & DETAIL TAG

SECTION TAG

FHCFHC

FIRE HOSE CABINET

FECFEC

FIRE EXTINGUISHER CABINET

(RECESSED AND SURFACE MOUNTED)

(RECESSED AND SURFACE MOUNTED)

ELEVATION

DESIGNATION

SHEET NUMBER

EXTERIOR ELEVATION TAG

EXISTING DOOR & FRAME

DOOR NUMBER -

USE ROOM NUMBER

WITH DOOR MARK

SHEET NUMBER

ELEVATION

DESIGNATION

FD

FLOOR DRAIN

1/4" = 1'-0"

SCALE: 1" = 4'-0"

0 2' 4' 8'

REVISION NUMBER

TITLE

SCALE

B

PLAN OR DETAIL

DESIGNATION

PARTITION TYPE

A-100

A-100

A-100

A-100

ABBREVIATIONS LEGEND

ABBREVIATIONS WHEN USED IN COMPOSITION MAY INCLUDE PERIODS FOR CLARIFICATION

ABOVE FINISHED FLOOR

ADJACENT

AIR HANDLING UNIT

AMERICANS WITH DISABILITIES ACT

APPROXIMATE

ARCHITECTURAL

AREA DRAIN

BACK TO BACK

BOTTOM OF

CABINET UNIT HEATER

CATCH BASIN

CENTERLINE

CENTER TO CENTER

CLASSROOM*

CLEANOUT

CLOSED CIRCUIT TELEVISION

CLOSET*

COLUMN

COMMUNICATION*

CONCRETE

CONCRETE MASONRY UNIT

CONFERENCE CONF*

CONTINUOUS

CONTROL JOINT

CORRIDOR*

CUBIC

CUSTODIAN*

DEGREE

DEMOLISH, DEMOLITION

DEPARTMENT DEPT*

DIAGONAL

DIAMETER

DIMENSION

DOUBLE

DOWNSPOUT

DRINKING FOUNTAIN

EACH

EDGE OF SLAB

ELECTRIC(AL)

ELECTRIC WATER COOLER

ELEVATION

ELEVATOR ELEV*

ENCLOSURE

EQUAL

EQUIPMENT

EXHAUST

EXISTING

EXPANSION JOINT

EXPOSED

EXTERIOR

FACE OF

FACE TO FACE

FACE BRICK

FEET, FOOT

FINISH(ED)

FINISHED OPENING

FIRE ALARM

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE DEPARTMENT CONNECTION

FIRE DEPT. CONNECTION CABINET

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FIRE HOSE CABINET

FIRE HOSE RACK

FIRE HYDRANT

FIRE PROTECTION

FLOOR DRAIN

FOOTING

FOUNDATION

FRAMING

FURNISH, FURNITURE

GAUGE

GALVANIZED

GENERAL

GLASS

GREASE TRAP

GYPSUM BOARD

HEATING, VENTILATION, AIR CONDITIONING

HEAT-STRENGTHENED

HIGH POINT

HOLD OPEN

HOLLOW METAL

HORIZONTAL

HOSE BIBB

HOUSEKEEPING*

INCLUDE(D), INCLUDING

INSIDE DIAMETER

INTERIOR

AFF

ADJ

AHU

ADA

APPROX

ARCH

AD

B/B B/

CUH

CB

CL

C/C

CLRM

CO

CCTV

CLO

COL

COMM

CONC

CMU

CONF

CONT

CJ

CORR

CU

CUST

DEG

DEMO

DEPT

DIAG

DIA

DIM

DBL

DS

DF

EA

EOS

ELEC

EWC

EL

ELEV

ENCL

EQ

EQUIP

EXH

EXIST

EJ

EXP

EXT

F/ F/F F/B

FT

FIN

FO

FA

FAAP

FACP

FDC

FDCC

FE

FEC

FHC

FHR

FH

FP

FD

FTG

FDTN

FRMG

FURN

GA

GALV

GEN

GL

GT

GYP BD

HVAC

HS

HP

HO

HM

HORIZ

HB

HSKPG

INCL

ID

INT

JANITOR*

KITCHEN*

LABORATORY*

LAVATORY

LIGHTING

LINEAR FOOT, (LINEAR FEET)

LONG LEG HORIZONTAL

LONG LEG VERTICAL

LOW POINT

LIGHWEIGHT INSULATING CONCRETE SYSTEM

MACHINE*

MAINTENANCE*

MANHOLE

MANUFACTURER

MASONRY OPENING

MATERIAL

MAXIMUM

MECHANICAL*

MEETING*

METAL

MEZZANINE

MINIMUM

MISCELLANEOUS

MULLION

NOMINAL

NOT IN CONTRACT

NOT TO SCALE

OCCUPY, OCCUPANT OCC*

OFFICE OFF*

ON CENTER

OPPOSITE

OPPOSITE HAND OPP

OUT TO OUT

OUTSIDE DIAMETER

OWNER FURNISHED, CONTRACTOR INSTALLED

OWNER FURNISHED, OWNER INSTALLED

PAIR

PERPENDICULAR

PLASTER

PNEUMATIC TUBE SYSTEM

POUND(S)

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PREFABRICATE(D)

PREFINISH(ED)

PRELIMINARY

PROPERTY

PUBLIC ADDRESS

PULL STATION

RADIUS

REFERENCE

REINFORCE, REINFORCING

REQUIRED

REVISION/REVISED

RIGHT OF WAY

RISER (Stair)

ROOM*

ROUGH OPENING

SANITARY

SERVICE SINK

SIMILAR

SOUND TRANSMISSION CLASS

SPRINKLER

SQUARE FOOT (SQUARE FEET)

STAINLESS STEEL

STORAGE*

STRUCTURE, STRUCTURAL

SYSTEM

TELEPHONE

TELEVISION

TEMPORARY

TOILET

TOP OF

TOPOGRAPHY, TOPOGRAPHIC

TREAD

TYPICAL

UNDERWRITERS’ LABORATORIES

UNIT HEATER

UNLESS NOTED OTHERWISE

VENTILATION

VERIFY IN FIELD

VERTICAL

VESTIBULE*

WATER CLOSET

WATER HEATER

WITH

WITHOUT

WORKING POINT

JAN

KIT

LAB

LAV

LTG

LF

LLH

LLV

LP

LWIC

MACH

MAINT

MH

MFR

MO

MATL

MAX

MECH

MTG

MTL

MEZZ

MIN

MISC

MULL

NOM

NIC

NTS

OCC

OFF

OC

OPP

OPP HD

O/O

OD

OFCI

OFOI

PR

PERP

PLAS

PTS

LB(S)

PSF

PSI

PREFAB

PREFIN

PRELIM

PROP

PA

PS

R

REF

REIN

REQ

REV

ROW

R

RM

RO

SAN

SS

SIM

STC

SPKLR

SF

SST

STOR

STRUCT

SYS

TEL

TV

TEMP

TLT

T/

TOPO

T

TYP

UL

UH

UNO

VENT

VIF

VERT

VEST

WC

WH

W/ W/O

WP

MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METHODS SHALL BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS AS IF FULLY WRITTEN HEREIN.

FAILURE OF THE CONTRACTOR TO OBTAIN MANUFACTURER'S INSTRUCTIONS SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF THE REQUIREMENTS OF THE WORK. CONTRACTOR SHALL CONFIRM ALL

EQUIPMENT DIMENSIONS, ELECTRICAL REQUIREMENTS AND UTILITY CONNECTIONS PRIOR TO

CONSTRUCTION WITH ACTUAL EQUIPMENT'S MAKE AND MODEL.

UNLESS OTHERWISE NOTED ALL OWNER PROVIDED ITEMS SHALL BE INSTALLED BY THE CONTRACTOR.

THE INSTALLING CONTRACTOR

OF ALL OWNER PROVIDED ITEMS SHALL PREPARE COORDINATION SHOP DRAWINGS TO CONFIRM

INSTALLATION REQUIREMENTS PRIOR TO RECEIVING EQUIPMENT. INSTALLATION CONTRACTOR SHALL

BE RESPONSIBLE FOR RECEIVING AND MOVING EQUIPMENT FROM DELIVERY LOCATION TO

INSTALLATION SITE

MANUFACTURER'S INSTRUCTIONS

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

A-001

ABBREVIATIONS,

SYMBOLS, MATERIALS,

INDEX SITE PLAN &

GENERAL NOTES

100% Construction

Documents

BALLROOM A

LOADING DOCK

EL

EV

ARENA

SECURITY

WATER HEATER/ MOP SINK

ICE/ BEVERAGE ROOM

OFFICE 2

OFFICE 3

STORAGE

UP

06/01/05

T R A

IL

E R

T R A

IL

E R

C O M P A C T O R

C O N T A

IN

E R

C O M P A C T O R

C O N T A

IN

E R

DEMOLITION PLAN LEGEND

DENOTES AREA "NOT IN CONTRACT"

DENOTES AREA OR ELEMENT TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

EXISTING DOOR AND FRAME TO REMAIN

EXISTING DOOR AND FRAME TO BE DEMOLISHED

GENERAL DEMOLITION NOTES

1. ITEMS TO BE REMOVED IN DEMOLITION AREAS ARE TO BE VERIFIED BY FIELD INSPECTION. IT IS THE INTENT TO REMOVE EXISTING FEATURES AS REQUIRED TO PREPARE THE AREA FOR CONSTRUCTION. IF A

FEATURE TO BE REMOVED IS NOT SHOWN IT DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF REMOVING SUCH A FEATURE OR ENTITLE HIM TO AN EXTRA FOR THE REMOVAL OF

SUCH FEATURE.

2. REPAIR ALL PAVED AND WALK SURFACES DAMAGED DURING DEMOLITION AND CONSTRUCTION TO

MATCH EXISTING AND ADJACENT AREAS.

3. THE WORK SHALL BE SCHEDULED AROUND SCHOOL OPERATION AND TESTING SCHEDULES. AND SHALL

OCCUR ONLY IN AREAS ALLOWED/ASSIGNED BY THE SCHOOL.

4. THE CONTRACTOR SHALL SUBMIT SAFETY PLAN FOR APPROVAL. SAFETY PLAN SHALL CLEARLY DELINEATE AREAS FOR CONSTRUCTION TRAFFIC DURING THE VARIOUS PHASES OF THE PROJECT AND

WHEN CONDITIONS CHANGE. WHERE HEAVY MACHINERY IS TO BE USED, THE WORK SHALL BE

SEPARATED FROM SCHOOL OCCUPANTS BY SECURE DOUBLE BARRIERS WITH DISTANCES OF 10 FEET IN

BETWEEN, CONSTRUCTION, IT'S STAGING, ETC.

SHALL NOT IMPEDE OR REDUCE THE MEANS OF EGRESS.

5. PROVIDE AND MAINTAIN STABILIZED VEHICULAR ACCESS TO CONSTRUCTION AREAS.

6. PROVIDE AND MAINTAIN ACCESS TO STAGING AND CONSTRUCTION AREAS.

7. PROVIDE TEMPORARY CONSTRUCTION BARRICADES TO THE E/TENT REQUIRED TO ALLOW DEMOLITION AND NEW CONSTRUCTION TO OCCUR IN A SAFE MANNER. MAINTAIN SAFE EGRESS AND ACCESS TO AND

FROM ALL REMAINING OCCUPIED BUILDINGS.

8. WORK REQUIRING SHUT DOWN OF LIFE SAFETY SYSTEMS SHALL BE PERFORMED AFTER SCHOOL HOURS. SYSTEMS SHALL BE RESTORED & TESTED PRIOR TO START OF FOLLOWING SCHOOL DAY.

9. WORK IN AREAS OF SCHOOL THAT WILL BE IN OPERATION SHALL BE LIMITED TO START AFTER SCHOOL

HOURS. CONTRACTOR SHALL SCHEDULE WORK TO CONFORM TO THIS REQUIREMENT.

10. ALL SYSTEMS SHALL REMAIN OPERATIONAL DURING ALL PHASES OF CONSTRUCTION. TRANSFER, RELOCATION, OR REMOVAL OF ANY SYSTEM SHALL BE PERFORMED IN SUCH A MANNER THAT SCHOOL

OPERATION WILL BE MAINTAINED WITH ALL SYSTEMS IN A SAFE, WORKING ORDER.

11. REMOVE TEMPORARY BARRIERS UPON COMPLETION OF THE WORK. RESTORE ALL AREAS DAMAGED DURING CONSTRUCTION TO A "LIKE NEW" CONDITION, INCLUSIVE OF LANDSCAPE AREAS, FLOORS, WALLS, CEILINGS, UTILITIES, BELOW AND ABOVE GRADE IMPROVEMENTS, ETC. PROVIDE PHOTOGRAPHS

RECORDING EXISTING CONDITIONS PRIOR TO COMMENCING WORK

12. PROVIDE SIGNS ON EXTERIOR FACE OF TEMPORARY CONSTRUCTION BARRIERS TO READ:

"CONSTRUCTION AREA NO TRESPASSING."

13. RESTORE AREAS AFTER UNDERGROUND WORK TO A MATCHING FINISHED

APPEARANCE.

14. REPLACE, REPAIR, REFINISH ALL EXISTING IMPROVEMENTS DAMAGED DURING CONSTRUCTION.

15. STAGING AREAS SHALL BE MINIMIZED TO MAINTAIN PROPER SAFE SCHOOL

OPERATIONS. THEY SHALL BE INSTALLED AND/OR SHALL BE RELOCATED AS

WORK PROGRESSES.

16. IF NECESSARY, PROVIDE GREEN VISUAL SCREEN TO EXISTING FENCES IN CONSTRUCTION AREA.

MAINTAIN IN A FINISHED CONDITION FOR THE DURATION OF THE WORK.

17. CONTRACTOR IS RESPONSIBLE FOR GPR SCANNING. FOR FA UNDERGROUND CONDUITS & BOXES, CONTRACTOR TO HAND DIG & NOT USED ANY HEAVY MACHINERY.

18. NEW WORK AND DEMOLITION OPERATIONS SHALL BE IN COMPLIANCE WITH NFPA 1 CHAPTER 16, FBC CHAPTER 33, NFPA 241, AND OSHA REGULATIONS FOR PROPER, WASTE DISPOSAL OF CONSTRUCTION MATERIALS, HAZARDOUS MATERIALS HANDLING, MAINTENANCE OF MEANS OF EGRESS, PRESERVATION OF EXISTING FIRE PROTECTION SYSTEMS, AND ACCESS FOR EMERGENCY SERVICE VEHICLES AT ALL

TIMES.

19. MDCPS SHALL BE NOTIFIED PRIOR TO DISCONNECT ANY EXISTING FIRE SUPPRESSION OR DETECTION

SYSTEM.

20. WHEN ANY EXISTING FIRE PROTECTION OR DETECTION SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS IN A 24 -HOUR PERIOD, THE AHJ SHALL BE NOTIFIED , AND THE BUILDING EVACUATED OR AN APPROVED, FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED BY THE SHUTDOWN

UNTIL THE SYSTEM HAS BEEN RETURNED TO SERVICE.

D1D2

D3

D4

D5

F E

F E

C

250' MAX TRAVEL DIST

204' TOTAL TRAVEL DIST

250' MAX TRAVEL DIST

210' TOTAL TRAVEL DIST

LIFE SAFETY LEGEND

EXIT ACCESS TRAVEL DISTANCE

COMMON PATH DISTANCE

DEAD END DISTANCE

DOOR WIDTH AND EGRESS CAPACITY

CEILING MOUNTED EXIT SIGN

AREA NOT IN CONTRACT

FIRE ALARM COMBINATION SPEAKER/STROBE

FP FIRE PULL STATION, TOP OF PULL STATION

NOT TO EXCEED 54" AFF

WALL MOUNTED EMERGENCY LIGHT

ONE HOUR FIRE RATED PARTITION

TWO HOUR FIRE RATED PARTITION

SMOKE PARTITION

FIRE RATING OF DOOR IN MINUTES

SD SMOKE DETECTOR

EXISTING EMERGENCY LIGHT

EMERGENCY LIGHT

EXISTING EXIT SIGNE

FE

FIRE EXTINGUISHER WALL MOUNTED CABINET, TOP

OF FIRE EXTINGUISHER NOT TO EXCEED 48" AFF

72" 360

45 DOOR OCCUPANT LOAD

S

EXISTING EMERGENCY SHOWER/EYE WASH

STATION

FEC

EXISTING FIRE EXTINGUISHER WALL MOUNTED,

TOP OF FIRE EXTINGUISHER NOT TO EXCEED 48"

AFF

EW

# FT. TRAVEL DISTANCE

# FT. COMMON PATH

# FT. DEAD END

OCCUPANCY CLASSIFICATION

• ASSEMBLY GROUP A-2: includes assembly uses intended for food and/or drink consumption including, but not limited to:

Restaurants, cafeterias and similar dining facilities (including associated commercial kitchens)

FLORIDA FIRE PREVENTION CODE FLORIDA BUILDING CODE 303.2

• ASSEMBLY

TRAVEL DIST.

FBC

1017.2

250 FTASSEMBLY: 250 FT

FFPC

101.39.2.6.3

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

D-201

DEMOLITION FLOOR

PLAN AND EXISTING

LIFE SAFETY

100% Construction

Documents

03-10 DEMO KEYNOTE LEGEND

NUMBER DESCRIPTION

D1 EXISTING QUARRY FLOORING AND BASE TO BE REMOVED

D2 EXISTING POLISHED CONCRETE FLOOR TO BE DEMOLISHED FOLLOWING

CONTROL JOINTS ACCORDING TO PLUMBING WORK SCOPE

D3 EXISTING TILE ON WALL TO BE REMOVED

D4 EXISTING WALLS TO BE PREPPED FOR NEW MATERIALS, PATCHING AND

PAINTING

D5 EXISTING WALL MOUNTED DEVICES TO BE CAREFULLY REMOVED.

CONTRACTOR TO COORDINATE WITH OWNER ON WHICH DEVICES ARE TO BE

SALVAGED OR DISPOSED

1/8" = 1'-0"1 DEMOLITION FLOOR PLAN AND EXISTING LIFESAFETY

N

EL

EV

ARENA

SECURITY

WATER HEATER/ MOP SINK

ICE/ BEVERAGE ROOM

OFFICE 2

OFFICE 3

STORAGE

UP

06/01/05

T R A

IL

E R

T R A

IL

E R

C O M P A C T O R

C O N T A

IN

E R

C O M P A C T O R

C O N T A

IN

E R

RCP DEMOLITION PLAN LEGEND

DENOTES AREA "NOT IN CONTRACT"

DENOTES AREA OR ELEMENT TO BE DEMOLISHED

GYPSUM CEILING TO REMAIN

EXISTING PARTITION TO REMAIN

CEILING TAG

LIGHTS FIXTURES TO BE REMOVED

SMOKE DETECTOR

FIRE ALARMF.A.

LIGHTS FIXTURES TO BE REMOVED

LIGHTS FIXTURES TO BE REMOVED

TYPE

#' #" AFF

D6

D7

D8

D9

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

D-300

DEMOLITION

REFLECTIVE CEILING

PLAN

100% Construction

Documents

03-10 DEMO KEYNOTE LEGEND

NUMBER DESCRIPTION

D6 EXISTING CEILING GRID AND ACT TO BE DEMOLISHED ACCORDING TO MEP

WORK SCOPE

D7 ALTERNATE: CEILING GRID TO BE EVALUATED FOR REUSE

D8 EXISTING LIGHT FIXTURES, AIR SUPPLY, AND RETURN GRILLES TO BE

DEMOLISHED, SALVAGED AND RETURNED TO OWNER, (TYP)

D9 EXISTING SPRINKLERS, FIRE ALARM AND STROBE DEVICES TO BE

COORDINATED WITH ELECTRICAL DRAWINGS TO BE REPLACED AND/OR

RELOCATED AS REQUIRED

1/8" = 1'-0"1 DEMOLITION REFLECTED CEILING PLAN

EV

ARENA

SECURITY

WATER HEATER/ MOP SINK

ICE/ BEVERAGE ROOM

OFFICE 2

OFFICE 3

STORAGE

UP

06/01/05

T R A

IL

E R

T R A

IL

E R

C O M P A C T O R

C O N T A

IN

E R

C O M P A C T O R

C O N T A

IN

E R

FLOOR PLAN GENERAL NOTES

1. REFER TO FLOOR PLAN LEGEND FOR ALL SYMBOLS

2. ALL DIMENSIONS ARE FROM UNFINISHED FACE OF NEW PARTITIONS OR TO FACE OF FINISHED

EXISTING CONSTRUCTION UNLESS NOTED OTHERWISE. ALL DIMENSIONS SHOWN ON THE

DRAWING SHALL BE CONSIDERED CRITICAL OR CLEAR

3. REFER TO PARTITION TYPES FOR PARTITION HEIGHTS AND THICKNESS

4. VERIFY ALL STRUCTURAL, MECHANICAL AND ELECTRICAL REQUIREMENTS AND COORDINATE

REQUIRED CHANGES PRIOR TO CONSTRUCTION

5. VERIFY DIMENSIONS WITH ARCHITECT PRIOR TO CONSTRUCTING PARTITIONS. SUBMIT FINISHES

TO ARCHITECT FOR APPROVAL

6. CONTRACTOR TO COORDINATE WITH THE CLIENT AT THE COMMENCEMENT OF CONSTRUCTION

ALL SECURITY REQUIREMENTS FOR ALL DOORS AND FRAMES

7. CONTRACTOR TO PROVIDE ADEQUATE BACKING WITHIN WALL FOR THE INSTALLATION OF ANY

REQUIRED WALL MOUNTED ITEMS

8. CONTRACTOR SHALL REPAIR/REPLACE ANY AND ALL CEILINGS, CEILING TILES, FIXTURE, AND

DEVICES THAT ARE REMOVED OR RELOCATED DURING FIRE ALARM/SPRINKLER OR MECHANICAL

WORK. SEE MECHANICAL PLANS

9. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY IF ANY WORK INDICATED IN

THE CONTRACT DOCUMENTS CANNOT BE PERFORMED DUE TO EXISTING CONDITIONS

10. THESE DRAWINGS ARE BASED ON AS-BUILTS PROVIDED ON 02/11/26

FIELD VERIFICATION

THESE DRAWINGS INCORPORATE BUILDING INFORMATION COMPILED FROM VARIOUS SOURCES

ASSOCIATED WITH THIS PROJECT AND DEEMED AS RELIABLE. CONDITIONS DIRECTLY AFFECTING THE

PRODUCT MUST BE FIELD VERIFIED BY THE CONTRACTOR.

F1

F2 F3

F4

F4 F4

F4

F4

F5

F4

F4

F6

F6

F5

F5

F5

F5

F5

F5

F5

F7

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

A-201

PROPOSED FLOOR

PLAN

100% Construction

Documents

KEYNOTE LEGEND

NUMBER DESCRIPTION

F1 FLOORING TO BE PREPPED FOR GRIT EPOXY COATING INSTALLATION.

NEW BASE BOARD INSTALLED TO MATCH WALL COLOR.

F2 POUR NEW CONCRETE WITHIN CONTROL JOINTS IN IMPACTED AREA.

FINISH TO BE POLISHED TO MATCH EXISTING.

F3 PREP WALL FOR INSTALL OF STAINLESS STEEL SHEETS

F4 PREP WALL FOR FRP

F5 PREP WALL FOR PAINT; COLOR TBD BY OWNER

F6 INSTALL METAL THRESHOLD; TBD BY OWNER

F7 PATCH AND MATCH EXISTING POROUS CONCRETE

1/8" = 1'-0"1 PROPOSED FLOOR PLAN

EV

ARENA

SECURITY

WATER HEATER/ MOP SINK

ICE/ BEVERAGE ROOM

OFFICE 2

OFFICE 3

STORAGE

UP

06/01/05

T R A

IL

E R

T R A

IL

E R

C O M P A C T O R

C O N T A

IN

E R

C O M P A C T O R

C O N T A

IN

E R

REFLECTED CEILING NOTES

1. REFER TO G-001 FOR GENERAL NOTES

2. REFER TO POWER AND COMMUNICATION PLANS FOR PLACEMENT OF CEILING

MOUNTED ELECTRICAL DEVICES

3. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CEILING HEIGHTS

CONDITIONS FOR CLEARANCE OF MECHANICAL UNITS, DUCTWORK, PIPING LIGHT

FIXTURE, ETC

4. ALL CEILING HEIGHTS SHALL BE MEASURED FROM THE TOP OF FINISHED

FLOOR

5. ALL LIGHT FIXTURES, DUCT WORK, GRILLS, DIFFUSERS, SPRINKLER LINES,

SPRINKLER HEADS, , EXIT SIGNS, STROBE LIGHTS, ETC, SHALL BE LOCATED IN THE

CENTER OF THE WALL OR CEILING UNLESS OTHERWISE NOTED.

6. REFER TO ELECTRICAL DRAWINGS FOR EMERGENCY LIGHT FIXTURE

LOCATIONS,FIXTURE SCHEDULE AND ADDITIONAL INFO

7. PROVIDE 16 GA METAL GROUNDS AND BLOCKING FOR ATTACHMENT OF TRIM

FIXTURES, ETC.

8. REFER TO ENGINEER DOCUMENTS FOR EXIT LIGHT AND SIGN LOCATIONS AND

SPECIFICATIONS

9. ALL RECESSED WALL WASH & DOWN LIGHT FIXTURES SHALL BE ON DIMMERS

10. CEILING HEIGHTS TO BE VERIFIED IN FIELD

11. CONTRACTOR TO PROVIDE ADDITIONAL DRYWALL AS NEEDED TO MEET NEW

CEILING HEIGHT

NOTE:

CONTRACTOR TO COORDINATE RCP WITH MECHANICAL, ELECTRICAL,

PLUMBING,AND FIRE PROTECTION SHEETS

SYMBOLS-LEGEND

TYPE DESCRIPTION

2' x 2' RECESSED LIGHT FIXTURE

2' x 2' RECESSED LIGHT FIXTURE W/90

MIN. BATTERY BACKUP

2' x 4' RECESSED LIGHTING FIXTURE

2' x 4' RECESSED LIGHT FIXTURE W/90

MIN. BATTERY BACKUP

SUPPLY DIFFUSER SEE ELEC DWGS.

RETURN DIFFUSER SEE ELEC

DWGS.

GWB CEILING

2'x 2" ACOUSTICAL CEILING

8" RECESSED DOWNLIGHT

X'-XX" CEILING ELEVATION

EXIT SIGN

4' LIGHT FIXTURE W/90 MIN. BATTERY

BACKUP

EF EXHAUST FAN

EXISTING

NOTE:

CONTRACTOR IS RESPONSIBLE FOR PROVIDING ACCESS PANELS AS REQUIRED

BY CODE. ALL ACCESS PANELS TO BE STEALTH TYPE.

NOT IN CONTRACT

REFER TO MEP AND

STRUCTURAL DRAWINGS

NOTE

RCP1

RCP2

RCP3

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

A-301

PROPOSED REFLECTED

CEILING PLAN

100% Construction

Documents

KEYNOTE LEGEND

NUMBER DESCRIPTION

RCP1 NEW LIGHT FIXTURES TO BE INSTALLED IN LOCATION OF PREVIOUS

ONES; REFER TO ELECTRICAL DRAWINGS

RCP2 INSTALL NEW VYNIL ACOUSTICAL CEILING TILE; FULL CEILING

REPLACEMENT

RCP3 ROOF WORK: CONTRACTOR TO CONFIRM EXISTING OPENINGS AND

MODIFY FRAMES AS NECESSARY FOR NEW FANS; REFER TO

STRUCTURAL DRAWINGS FOR ADDITIONAL INFO

1/8" = 1'-0"1 PROPOSED REFLECTED CEILING PLAN

x

D D x

D DD

24 x 72

C

D

D

A

IR

INA

IR

O U T

BPDOV-2

BPDOV-1

BPDOV-3

G

BPDOV-2

BPDOV-1

BPDOV-3

G

D

E1

E E

D x

24 x 60 x x

24 x 60

24 x 60

24 x 60

24 x 60 x x x 72

24 x 60

24 x 60 x x

24 x 54 x x x

24 x 60 x x 6 x 6

24 x 60 24 x 60 24 x 60

D

A N D

W A S T E

X P R E S S

IS

F E E T

M A X

IM

U M

D

IS

T A N C E

B E T W E E N

D

IS

P O S E R

IN

LE

T O U

TL

E T

B O T H

S

ID

E S

W A S T E

F R O M

D

IS

P O S E R

IN

F R O M

E

IT

H E R

S

ID

E

D R A

IN

E

IT

H E R

S

ID

E

H

H

C

H

C

24 x 60

DD

H

H

C x 6

D

D

H

E

GLASS

RACK

GLASS

RACK

GLASS

RACK

GLASS

RACK

GLASS

RACK

CC

DG

CC

DG

E1 E1

G

F E C

GLASS RACK

STORAGE ABOVE

TABLE LIMIT

SWITCH

GLASS RACK

STORAGE ABOVE

GLASS RACK STORAGE

ABOVE DOUBLE SIDED

RACKING SHELF

GLASS RACK STORAGE

BELOW TABLE ON

TUBULAR SUPPORT

WATER GUSHER FOR

TROUGH

HD MAGNET INSTALLED HERE

FOR SILVERWARE SAVER

LOADING DOCK

EL

EV

ARENA

SECURITY

BEVERAGE EQUIP STORAGE

DRY STORAGE

WALK IN COOLER 3

WATER HEATER/ MOP SINK

DISH STORAGE

WALK IN COOLER 2

WALK IN COOLER 1

HO

T

BO

X

PA

RK

IN

G

ICE/ BEVERAGE ROOM

OFFICE 2

OFFICE 3

PREP SPACE

DISHROOM

STORAGE

UP

06/01/05

T R A

IL

E R

T R A

IL

E R

C O M P A C T O R

C O N T A

IN

E R

C O M P A C T O R

C O N T A

IN

E R

WB-1

FL-1

WF-3

WB-1

FL-1

WF-3

WB-1

FL-1

WF-3

WB-1

FL-1

WF-3

WB-1

FL-1

WF-3

WB-1

FL-1

WF-1

WB-1

FL-1

WF-3

WB-1

FL-1

WF-3

WF-2

WB-1

FL-1

WF-1

WB-1

FL-1

WF-1

WB-1

FL-1

WF-1

WB-1

FL-1

WF-3

FL-2

FL-3

OCEAN CENTER

DAYTONA BEACH

2025-108

ENE

No. 93562

C S

J U

L I A

N

MA RT I N

HARR

I S

JULIAN M. HARRIS

FL-93562

STATE OF

L

OLF

O FES

OIS

P

A L E N

N

G I

E E R

ADIR

R

I

I N

DAYTONA BEACH

OCEAN CENTER

KITCHEN

RONOVATIONS

SGM-30X42-BRD.DWG 2025-108

AS SHOWN

FOR DIGITAL

SIGNATURE

S

GM

E

NG

IN

EE

RI

NG

IN

C D

RA

W

IN

GS

W

RI

TT

EN

M

AT

ER

IA

L, A

ND

D

ES

IG

N

C

ON

C

EP

TS

S

HA

LL

N

OT

B

E

US

ED

O

R

RE

PR

OD

UC

ED

I N

W

HO

LE

O

R

PA

RT

I N

AN

Y

FO

RM

O R

FO

RM

AT

W

IT

HO

UT

P

RI

OR

W

RI

TT

EN

C

ON

SE

NT

O

F

SG

M E

NG

IN

EE

RI

NG

IN

C

DO

N

OT

S C

AL

E

DR

AW

IN

GS

US

E

GI

VE

N

DI

M

EN

SI

ON

S

ON

LY

IF

N

OT

S

HO

W N, V

ER

IF

Y C

OR

RE

C T

DI

M

EN

SI

ON

S W

IT

H

TH

E

EN

GI

NE

ER

C

ON

TR

AC

TO

R

SH

AL

L C

HE

C K

AN

D

VE

RI

FY

A

LL

D

IM

EN

SI

ON

S

AN

D

C

ON

DI

TI

ON

S

AT

J

OB

SI

TE

Sheet Number:

Issue: 09/12/25 100%

CD'S

DescriptionDateNo.

Seal:

Sheet Name:

Project Name:

Client Name:

Drawing File Name:

Engineer of Record:

License Number:

Drawn By:

Checked By:

Project Number:

Scale:

Design By:

*NOT ISSUED FOR CONSTRUCTION

A-600

FINISH PLAN

100% Construction

Documents

1/8" = 1'-0"1 FINISH PLAN

FINISH LEGEND

DESCRIPTION

KEYNOTE

NUMBER SPECIFICATION

BASE FINISH

RUBBER BASE WB-1 COLOR TO MATCH WALL PAINT AND FRP TBD BY OWNER

FLOOR FINISH

EPOXY FLOOR FL-1 EXPOXY COATING WITH GRIT/SAND TEXTURE FOR SLIP RESISTANCE; RUBBER MATCS TO BE USED; COLOR TBD BY OWNER

WALL FINISH

FRP WF-1 FRP COLOR TBD BY OWNER; PROVIDE SUBMITTAL

POLISHED CONC FLOOR FL-2 MATCH EXISTING ADJACENT POLISHED CONCRETE

CONCRETE FLOOR FL-3 EXTERIOR POROUS CONCRETE

STAINLESS STEEL SHEET WF-2 PROVIDE SUBMITTAL

PAINT WF-3 COLOR TBD BY OWNER

Sheets
A-001 - ABBREVIATIONS, SYMBOLS, MATERIALS, INDEX SITE PLAN & GENERAL NOTES
A-201 - PROPOSED FLOOR PLAN
A-301 - PROPOSED REFLECTED CEILING PLAN
A-600 - FINISH PLAN
D-201 - DEMOLITION FLOOR PLAN AND EXISTING LIFE SAFETY
D-300 - DEMOLITION REFLECTIVE CEILING PLAN

File details come from the government source that posted it. Updated .