This solicitation requests proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for the Naval Facilities Engineering Systems Command Southeast. The requirement is a competitive 8(a) Program set-aside for small business firms located in Texas. The contract will result in five fixed-price IDIQ awards for general building projects such as construction, renovation, demolition and repair work in the Corpus Christi and Kingsville areas. The period of performance is a five-year ordering period from 2021 to 2026 with an aggregate value of $99 million across all contracts. A minimum guarantee of $1,000 will be provided for each contract. Projects will range from $250,000 to $10 million. A two-phase best value tradeoff source selection method will be used, with Phase Two involving a seed project proposal. The pre-proposal conference and site visit for Phase Two will be specified in a subsequent amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Design-Build Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for Naval Facilities Engineering Systems Command Southeast, newest first.
File Type Posted
N6945021R0045-0002.pdf PDF
N6945021R0045-0001.pdf PDF
Exhibit C Past Performance Questionnaire.pdf PDF
Exhibit A Construction and Design Project Data Sheet.pdf PDF
Exhibit B Safety Data Sheet.pdf PDF
Exhibit J Facility Electronic Operation and Maint Support Info. (eOMSI).pdf PDF
Exhibit F SECNAV 5512 Base Access.pdf PDF
Exhibit E AMAG Form.xls XLS spreadsheet
Exhibit D ProjNet How To Guide.pdf PDF
Exhibit H Cost-Loaded Network Analysis Schedules (NAS).pdf PDF
N69450-21-R-0045 Solicitation.pdf PDF
Exhibit I Electronic Construction Contract Management System.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR DESIGN-BUILD

11/16

NAVFAC SE VERSION

PART 1 GENERAL

1.1 GOVERNMENT POLICY

Military installations are required to direct at least 60 percent of their non-hazardous solid wastes (including waste from construction and demolition operations) from the waste stream. This guide specification requires the reduction of the amount of construction and demolition waste requiring landfill disposal or incineration, and to promote more efficient use of construction materials during construction.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.05 25 SUSTAINABILITY REPORTING FOR DESIGN-BUILD. Submit the following in accordance with Section 01 33 00.05 25 CONSTRUCTION SUBMITTAL PROCEDURES and 01 33 10.05 25

DESIGN SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Waste Management Plan; G

SD-11 Closeout Submittals

Records; S

1.3 DISPOSAL

Control accumulation of waste materials and trash. Recycle or dispose of collected materials off-site at intervals approved by the Contracting Officer and in compliance with waste management procedures. Except as otherwise specified in other sections of the specifications, disposal must be in accordance with the following:

[1.3.1 Reuse

Give first consideration to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. [Coordinate reuse with the Contracting Officer. ][Reuse materials as indicated on the drawings.] Consider sale or donation of waste suitable for reuse.

]1.3.2 Recycle

Recycle waste materials not suitable for reuse, but are recyclable.

[Recycle all fluorescent lamps, HID lamps, and mercury-containing thermostats removed from the site. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials.]

[1.3.3 Compost

Consider composting on site if a reasonable amount of compostable material will be available. Compostable materials include plant material, sawdust, and certain food scraps.

]1.3.4 Waste

Dispose of materials with no practical use or economic benefit to waste-to-energy plants where available. As the last choice, dispose of materials at a landfill or incinerator.

1.3.5 Return

Set aside and protect mis-delivered and substandard products and materials and return to supplier for credit.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 WASTE MANAGEMENT PLAN

Submit a waste management plan within [15][_____] days after [contract award][notice to proceed] and not less than 10 days before the [preconstruction][pre-demolition] meeting and prior to initiating any site preparation work. The plan must demonstrate how the project waste diversion goal is met and plan must include the following:

a. Name of individuals on the Contractor's staff responsible for waste prevention and management.

b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.

c. Description of the regular meetings to be help to address waste management.

d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.

e. Characterization, including estimate types and quantities, of the waste to be generated.

f. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.

g. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. Include the name, location, and phone number for each reuse facility to be used, and provide a copy of the permit or license for each facility.

h. List of specific waste materials that will be salvaged for resale, salvaged and reused, or recycled. Identify recycling facilities that will be used. Provide percentage of non-hazardous construction and demolition waste materials that have been diverted from the waste stream.

i. Identification of materials that cannot be recycled/reused with an explanation or justification.

j. Description of the means by which any waste materials identified in item (h) above will be protected from contamination.

k. Description of the means of transportation of the recyclable materials

(whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).

l. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration or landfill cost avoidance.

m. Actions that will be taken to divert at least the required amount of non-hazardous solid wastes (including waste from construction and demolition operations) from the waste stream. Report actual diversion rates during construction and demolition.

n. Identification of base, local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. [_____]

3.2 RECORDS

Maintained records to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Report with monthly invoicing the tons diverted, the tons sent to the landfill, cost for each, and the monthly diversion rate. Make the records available to the Contracting Officer during construction, and a copy of the records must be [delivered to the Contracting Officer upon completion of the construction][included in the Sustainability Notebook].

-- End of Section --

PART 1 GENERAL
1.1 GOVERNMENT POLICY
1.2 SUBMITTALS
1.3 DISPOSAL
[1.3.1 Reuse
]1.3.2 Recycle
[1.3.3 Compost
]1.3.4 Waste
1.3.5 Return
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 WASTE MANAGEMENT PLAN
3.2 RECORDS