This is a service and maintenance checklist document for the Speedgate B-secure 2.0 UL USA security gate system manufactured by Bavak Beveiligingsgroep B.V. The checklist provides comprehensive inspection and maintenance procedures that must be performed by trained and competent personnel who have received training from Bavak.
The checklist covers 36 numbered inspection items organized into mechanical, electrical, and safety system categories. Mechanical inspections include motor functionality, drive units, panel hinges, bearings, manual release mechanisms, and guidance systems. Electrical checks encompass photo cells, safety edges, detection loops, induction loop detectors, PCB (printed circuit board) operations, cabling, traffic lights, and electrical signals. Safety systems require verification of photocell beam interruption responses, safety edge activation within 2-second response times, and detection loop functionality. The document specifies technical parameters such as frequency inverter settings (45 Hz for gates under 13 feet, 25-45 Hz for gates over 13 feet) and standard gate movement speed of approximately 1 meter per second. Additional maintenance activities include lubrication of all moving parts, documentation of cycle counts in the logbook, rust prevention and repainting, and powder coating damage assessment. Daily user-level inspections require visual checks for proper functionality and safety provision operation. Monthly maintenance includes cleaning, guiding rail waste removal, and gate operator testing with contact reversal verification. Critical safety adjustments to force or travel limits may only be performed by Bavak-qualified technicians. All work must be documented in a logbook maintained near the installation, preferably in the control cabinet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Conference Minutes.pdf | ||
| Exhibit A - Pricing Schedule.xlsx | XLSX spreadsheet | |
| Exhibit I - Oil Datasheet Arnica S46.pdf | ||
| Prospective Offerors Cover Letter.pdf | ||
| SF-1442.pdf | ||
| Exhibit H - Inspection Report Bavak B-Secure Speedgates.pdf | ||
| 191T7026R0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Checklist Service & Maintenance Speedgate B-secure 2.0 UL USA
Checklist Speedgate B-protect V202205 1/5
WARNING / ATTENTION
Only carry out inspections and maintenance when the Speedgate's power supply has been switched off.
Switch off the mains switch in the control cabinet and the motor (disconnect) switch in the RH column! Tag and lock the switch to prevent unintended automatic movement of the gate during service activities on the gate.
N'effectuez les inspections et l'entretien que lorsque l'alimentation électrique du Speedgate est coupée.
Couper l'interrupteur principal dans l'armoire de commande. Étiquetez et verrouillez l'interrupteur pour empêcher tout mouvement automatique involontaire de la porte pendant les activités d'entretien sur la porte.
WARNING / ATTENTION
Risk of electric shock Risque de choc électrique
The Speedgate is designed to work safely and properly. Maintenance is necessary to guarantee that it continues to do so. Inspection and maintenance work must only be carried out by trained and competent personnel (both mechanically and electro technically), who are familiar with the latest technical and safety regulations. The personnel must also have been trained by Bavak Beveiligingsgroep B.V.
Check everything on functionality, adjustment, connection and securing , wear and tear, conservation and lubrication All work carried out and parts that are replaced, during maintenance and/or service visits, have to be reported in the log chart (log book) and inspection report, in order to create a historic overview of the installation. Furthermore all work should be carried out according this check list that corresponds with the inspection report.
Keep the log book in a safe place near the installation, preferably in the control cabinet of the installation.
Note:
the numbers on this checklist relate to the number indications mentioned on the Inspection Report
No. Part to be checked Related activities
1. Motor Check motor on:
• Functioning
• Mechanical connections on motor plate
• Electrical connections
• Leakage gearbox
• Strange noise
• Clearance and adjustment
2. Drive unit Check if motor+gearbox is well secured in SG drive unit.
• Clearance and adjustment
• Functioning
• Mechanical connections (torc on bolts and secured with lock-tite).
Check all bearings / turning parts on clearance and lubrication.
Exhibit G - Checklist Bavak B-Secure Speedgates
Checklist Speedgate B-protect V202205 2/5
Check drive rods: should not be bended (right-angled) Check ball joints (at drive rods) if well secured & lubricated
3. Manual release • Check the functioning of the manual release to fully open and close the Speedgate manually.
• Keep the emergency hand cranck in a (safe) place near the SG
4. Encoder Check absolute encoder (at motor) on adjustment during movement of the Gate:
• Speedgate panels should stop in fully open and fully closed position. Adjust by software of PCB
Panel hinges
Check hinges:
• Alignments.
• Lubrication.
• Smooth operation.
• Securing of shafts/axles
6. Bearings panel hinges Check all bearings on clearance and lubrication.
7. Movement of panels • Both panels must be in line and in spirit level in closed position.
(Check this at the top and at the bottom side of the panels)
• In open position, the panels should extend fully fold (parallel) behind the Speedgate Columns
• The space between the panels and drive unit compartment should be parallel.
• Adjustments by using encoder / PCB and possibly drive rods
8. End / limit stop
9+
Guide wheel assembly Check:
• Advise: replace each year the guide wheels
• The distance between the guide wheel and the drive unit.
Adjust the height by turning the axle.
• The connection of the lock nut on the guide wheel axle.
• Check connection of the guide wheel mounting bracket.
11 Bearing at top side column Check on:
• clearance & lubrication
• bolts on wear, tear and connection
12 Bearing at bottom side column Check on:
• clearance & lubrication
• bolts on wear, tear and connection
13 Connections / attachments Check if all connections, bolts, nuts etc are secured (with lock-tite).
14 Brushes / draught strips (option) Check attachments / sealing of rubbers / brushes.
15 Locks Check locks in service hatches & control cabinet on functionality
3/5
16 Steel plate cladding (option)
Check if the panel infill is well attached to the gate panels, all as per definitive drawing.
No noise / vibration heard during movement of the Speedgate.
17 Inspection hatches Check if the service doors in the columns and drive unit are well fitted.
18 Drainage of drive unit gate Check if water is properly drained off. Are water drainage outlets still functioning?
Remove waist in the guiding rail
19 Cabling in drive unit Check on proper connection and damage.
20 Photo cell (transmitter & receiver) Check photocell on functioning during closing and opening of the Speedgate.
• Speedgate should stop when an object interrupts the infrared light beam of the photocell during opening. To restore the operation of the Speedgate, an open or close signal needs to be given to the PCB.
• Speedgate should stop when an object interrupts the infrared light beam of the photocell during closing. The SG re-opens withing 2 seconds to the fully open position.
21 Safety edges & alu rail Check safety edges during closing and opening of the Speedgate.
• During opening: Speedgate should stop and reverse movement within 2 seconds. The gate travels to closed position until the circuit is safe again (contact between obstacle/vehicle and safety edge is released). Close until a release of safety circuit.
• During closing: Speedgate should stop and then re-open within 2 seconds to the fully open position.
• Check the status of the safety edges at the display of the PCB.
• Check the securing of the mounting profile in which the edge is installed
22 Detection loops Check the status of the detection loop on the PCB.
Measure isolation resistance of the loops.
Note: loops do not have to be adjusted at the same sensitivity:
check them separately.
When defect, report function, measured value and type of pavement (bricks, asphalt etc.)
23 Induction loop detector Test with use of a vehicle if the detectors are adjusted sensitively enough. (Should not react on the panels!).
24 Electrical components Check all connections / functioning of the electrical components installed.
Check the output speed (Hz.)of the frequency inverter:
Frequency inverter setting Speedgates < 13 ft.: 45 Hz.
Frequency inverter setting Speedgates > 13 ft.: 25- 45 Hz.
Moving speed of Speedgate: approx. 1 m/sec. (= 3 ft./sec.)
4/5
25 Electrical signals Check all electrical signals (inputs and outputs) on proper functioning.
26 PCB Check on proper functioning sequence of operation
27 Cabling Check all cabling on damages and connection. There should not be any tension on cables and plug.
Cables should be prevented to come in between rotating parts (use cable duct and tie-rap).
28 Traffic lights Check traffic lights:
• Mechanical & electrical connections.
• Functioning of light bulbs.
29 Pavement level The distance between the bottom side of the panels and pavement should be at least app.1.97” (50mm).
Bad pavement can also causes damages on detection loops!
30 Measurements Check if everything is in spirit level and in line
31 Powder coating Check on damages / rust
32 PCB software Report which software version is being used.
33 Type plate Check type plate is still attached and readable (SG column)
33 Log book (log chart) Check if log book (log chart) has been filled in and kept in a safe place.
34 Sequence of operation/test run Perform a test run during app 5 minutes and check the sequence of operation of the gate
35 Cleaning Clean the Speedgate
36 Log book / log chart Check is log book is present and report finding of the maintenance/service visit.
Report the number of cycles made
Additional activities to be carried out during maintenance:
• Note the number of movements (PCB: P000), as indicated on the counter, in the logbook and inspection report
• Lubricate all lubrication points and moving parts.
• In case of a pedestrian door: check door closer on clearance (oil)leakage and adjustment. Clean the door and touch up damaged parts.
• Check conservation for forming of rust. Repaint the damaged part.
• Fill in the log book, work order and/or inspection report after each inspection and maintenance visit with findings and work carried out and.
• Keep the log book in a safe place near the installation, preferably in the control cabinet of the installation.
General:
On a daily base, to be carried out by the user:
• Carry out visual inspection (everything at spirit level, undamaged, proper function etc.) Report deviations.
Damaged parts should be replaced by adequate and trained personnel.
• Check all safety provisions on proper functioning. If safety provisions are not working or if there is any doubt, the Speedgate must not be used. Contact Bavak Beveiligingsgroep B.V. or the qualified / certified installer.
• Check if warning sign is still attached are visible on both sides of the Speedgate.
• Check on sinusoidal acceleration and deceleration of speed.
5/5
Check monthly:
• Clean the Speedgate and the guiding rail (remove waste). Depending on environmental conditions (sand, mud a.o.) this has to be carried out on a regular basis.
• Test the gate operator monthly. The gate MUST reverse on contact with a rigid object or stop when an object activates the non-contact sensors. After adjusting the force or limit of travel, retest the gate operator. Failure to adjust and retest the gate operator properly can increase the risk of severe injury or death.
Important: adjusting the force or the limit of travel may only be done by a qualified Bavak technician or by a technician trained by Bavak!