Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
Inlet Harbor ADA Parking Dune Walkover Beach Access
Solicitation number
26-B-30IF
Issued by
Volusia County, Florida

About this file

This is a bid price sheet for Repair 26-B-30IF, an Inlet Harbor ADA Parking Dune Walkover Beach Access project submitted to Volusia County, Florida. The project encompasses thirteen line items totaling approximately 2,966 units of work, including mobilization and demobilization, construction and as-built surveying, environmental compliance, temporary traffic control, demolition and hauling, clearing and grubbing, grading and compaction, concrete sidewalk installation (157 square yards), concrete ADA parking space and van access aisle (52 square yards), timber railing along sidewalk (381 linear feet), timber pedestrian access structure with handrail (1,920 square feet), pavement striping with ADA signage and wheel stops, and bahia sod installation (455 square yards). The bid response deadline is January 6, 2026 at 3:01 p.m., with a non-mandatory pre-bid meeting on December 16, 2025 at 10:30 a.m. and a question submission deadline of December 23, 2025. Substantial completion is required within 120 days of the Notice to Proceed, with final completion within 150 days. The project is located at 4801 S. Atlantic Avenue in Ponce Inlet and replaces an existing 300-linear-foot timber boardwalk with an ADA-compliant facility.

The bid price sheet shows all line items with zero dollar amounts entered, indicating this is a blank template awaiting contractor pricing. The project is estimated at $408,325.00 and is funded through the Volusia County Coastal Department with federal FEMA compliance requirements. Contractors must submit a five percent bid bond and, upon award, provide a Payment and Performance Bond equal to 100 percent of the contract price. Only Florida-licensed General or Building Contractors are eligible, and all bidders must comply with E-Verify employment verification requirements and be registered with the Florida Department of State Division of Corporations. The contract is subject to Davis-Bacon Act prevailing wage requirements, Equal Employment Opportunity regulations, and domestic material procurement preferences. Liquidated damages are assessed at $500 per day for project delays, and construction is restricted during marine turtle nesting season from May 1 through October 31. All subcontractors must be listed and approved by the county.

View the file

Other files

File Type Posted
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access_(Addendum_#3_Revision).pdf PDF
Exhibit_J_-_ECHO_sign_requirements.pdf PDF
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access_(Addendum_#1_Revision).pdf PDF
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls XLS spreadsheet
Technical_Specifications.pdf PDF
Bid_Tabulation.xlsx XLSX spreadsheet
Bid_Tabulation.xlsx XLSX spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
Bid_Tabulation.xlsx XLSX spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
Technical_Specifications.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
Technical_Specifications.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair 26-B-30IF, Inlet Harbor ADA Parking Dune Walkover Beach Access

Contractor NameContractor's Cost
UNITTOTAL
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling, Disposal1LS$ - 0$ - 0
6Clearing and Grubbing1LS$ - 0$ - 0
7Grading and Compaction1LS$ - 0$ - 0
8Concrete Sidewalk157SY$ - 0$ - 0
9Concrete ADA Parking Space and Van Access Aisle52SY$ - 0$ - 0
10Timber Railing Along Sidewalk381LF$ - 0$ - 0
11Timber Pedestrian Access Structure with Handrail1,920SF$ - 0$ - 0
12Pavement Striping, ADA Signage & Wheel Stop1LS$ - 0$ - 0
13Bahia Sod455SY$ - 0$ - 0
Subtotal$ - 0
Payment and Performance Bond$ - 0
Total Bid Price (inclusive of Payment and Performance Bond)$ - 0

LS=Lump Sum, SY= Square Yard, SF= Square Foot, LF = Linear Foot image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .