Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx
XLSX spreadsheet 52 KB Posted
- Solicitation number
- 26-B-30IF
- Issued by
- Volusia County, Florida
About this file
This is a Bid Price Sheet for Volusia County, Florida's Inlet Harbor ADA Parking Dune Walkover Beach Access project located at 4801 S. Atlantic Avenue in Ponce Inlet. The project involves thirteen line items encompassing mobilization and demobilization, construction and as-built surveying, environmental compliance, temporary traffic control, demolition and hauling, clearing and grubbing, grading and compaction, concrete sidewalk installation (157 square yards), concrete ADA parking space and van access aisle (52 square yards), timber railing along sidewalk (381 linear feet), timber pedestrian access structure with handrail (1,920 square feet), pavement striping with ADA signage and wheel stops, and Bahia sod installation (455 square yards). The project replaces an existing 300-linear-foot timber boardwalk with a new ADA-compliant beach access facility including an ADA ramp and timber dune walkover stairs. The bid response deadline is January 6, 2026 at 3:01 p.m., with a non-mandatory pre-bid meeting scheduled for December 16, 2025 at 10:30 a.m. and a question submission deadline of December 23, 2025. Substantial completion is required within 120 days of the Notice to Proceed, with final completion within 150 days. The contract term extends through project completion with liquidated damages assessed at $500 per day for delays.
The bid price sheet contains blank line item unit prices and amounts, with all pricing entries showing $0, indicating this is a template for contractor cost submissions. The estimated project cost is $408,325.00. Bidders must submit a five percent bid bond and, upon award, provide a Payment and Performance Bond equal to 100 percent of the contract price. The project is funded through the Coastal Department and subject to federal contract provisions including FEMA compliance, Davis-Bacon Act prevailing wage requirements, Equal Employment Opportunity regulations, and domestic material procurement preferences. Eligible bidders must be Florida-licensed General or Building Contractors registered with the Florida Department of State Division of Corporations and compliant with E-Verify employment verification requirements. Contractors must maintain comprehensive insurance coverage including Workers Compensation, Commercial General Liability, and Auto Liability policies, with Volusia County named as an additional insured. All subcontractors must be listed and subject to county review for competency. Environmental restrictions prohibit construction during marine turtle nesting season from May 1 through October 31.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair 26-B-30IF, Inlet Harbor ADA Parking Dune Walkover Beach Access
| Contractor Name | Contractor's Cost | ||||
| UNIT | TOTAL | ||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | PRICE | AMOUNT |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling, Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Clearing and Grubbing | 1 | LS | $ - 0 | $ - 0 |
| 7 | Grading and Compaction | 1 | LS | $ - 0 | $ - 0 |
| 8 | Concrete Sidewalk | 157 | SY | $ - 0 | $ - 0 |
| 9 | Concrete ADA Parking Space and Van Access Aisle | 52 | SY | $ - 0 | $ - 0 |
| 10 | Timber Railing Along Sidewalk | 381 | LF | $ - 0 | $ - 0 |
| 11 | Timber Pedestrian Access Structure with Handrail | 1,920 | SF | $ - 0 | $ - 0 |
| 12 | Pavement Striping, ADA Signage & Wheel Stop | 1 | LS | $ - 0 | $ - 0 |
| 13 | Bahia Sod | 455 | SY | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | ||||
| Payment and Performance Bond | $ - 0 | ||||
| Total Bid Price (inclusive of Payment and Performance Bond) | $ - 0 |
LS=Lump Sum, SY= Square Yard, SF= Square Foot, LF = Linear Foot image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .