Exhibit F Scope of Work.pdf
PDF 97 KB Posted
- Solicitation number
- HHS0015989
- Issued by
- Texas
About this file
This is a Scope of Work exhibit for a blanket service contract issued by the Texas Health and Human Services Commission for the Texas Center for Infectious Disease facility. The contract seeks a qualified contractor to provide comprehensive service, repair, replacement, and software upgrades for the TAC Vista 5.1 energy management system integrated with a Phoenix Control negative air system on an as-needed, on-call basis. The scope includes maintenance of controls and associated equipment to original manufacturer specifications, labor, materials, transportation, tools, and equipment. The system manages HVAC operations, energy costs, and negative air pressure setpoints critical to hospital operations. Key system components include TAC Xenta controllers (401/401, 451A/452A, 913 Gateway, and 102-AX VAV Controller), server and workstation interfaces, webstation access, and ScreenMate user controls. The contractor must respond to standard service requests within 24 hours and emergency requests within 2 hours, maintaining a continuously monitored 24/7 telephone line for support. Work is scheduled Monday through Friday from 8:00 a.m. to 5:00 p.m., coordinated with the Owner's Representative, with all work performed at an occupied facility requiring minimal site disruption. The contractor must provide written estimates prior to service delivery.
The contract requires firm fixed pricing submitted on a standard pricing sheet and mandates comprehensive insurance coverage including workers' compensation, commercial general liability, commercial automobile liability, professional liability, and umbrella liability. Bidders must demonstrate a minimum of five years of relevant experience with fully trained personnel possessing at least three years of field experience. The initial contract term extends from award through August 31, 2026, with two optional one-year renewal periods extending potential coverage through August 31, 2028. Question submission deadlines were April 17, 2025, with answers posted by April 22, 2025, and final bid responses due April 30, 2025, at 10:30 a.m. Contractors must provide verifiable references, conduct background checks, maintain professional conduct consistent with state regulations, and comply with all performance standards and state regulatory requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit F Scope of Work
Texas Center for Infectious Disease HVAC Energy Management System
GENERAL INFORMATION
Texas Center for Infectious Disease is requesting a blanket contract for a company that has full access to the TAC Vista system, which is intergraded with the Phoenix Control negative air system services (including system services and repairs, labor, materials transportation, tools and equipment) on an “as needed, on-call” basis.
SCOPE OF WORK
Contractor shall maintain controls and associated equipment to the original manufacturer’s performance specifications. Provide service, repair, replacement, and software upgrade if required of the TAC Vista system, which is intergraded with a Phoenix Control negative air system services.
System Description:
1. TAC Vista 5.1 runs on Microsoft Windows with standard LAN communication on Ethernet or fiber optics using TCP/IP and standard network equipment.
Field bus communication features open LonWorks technology, which is used by TCID.
2. TAC Vista integrates with the Phoenix control systems on one network to maintain energy costs and negative air set-points within the hospital.
3. TAC Vista is the software solution that efficiently controls, checks, and analyzes a building's daily operation and economic efficiency, which may require periodic upgrades.
4. The TAC Vista Server communicates with and monitors the environmental and security controllers and serves data to the TAC Vista Workstation, which is the primary user interface. The workstation displays daily operations through a graphical user interface, providing operators with ready access to alarms, historical logs, sophisticated data trend logs, and standard and custom reports.
5. The Webstation allows access to the control system using standard web browsers. Users can navigate their site, view graphics and trend charts, and manage alarms. Webstation provides access to trace events in the system, and the Webstation server provides access to periodic or automatic reports
6. TAC Vista ScreenMate allows users to read and make custom changes to settings such as the room temperature setpoint or to view the outside air temperature directly from the user's.
Controls:
1. TAC Xenta 401/401
2. TAC Xenta 451A/452A Universal Input and Analog Output Module
3. TAC Xenta 913 Gateway
4. TAC Xenta 102-AX VAV Controller with Onboard Actuator and Air Flow
Transducer
Overview and Purpose:
Contractors shall provide on an “on call, as needed” basis, including labor, materials, tools, equipment, supplies, services, tasks, transportation, and all incidental and customary work. The contractor will provide a written estimate of repairs, etc., prior to services rendered. All customary work shall include but not be limited to electrical services, including maintenance, repair, modifications, and improvements at the Texas Center for Infectious Disease facility.
Exhibit F Scope of Work
CONTRACT TASKS
When so requested, the Contractor shall provide service within twenty-four (24) hours, unless notified that an emergency exists which requires immediate attention to keep the facility in operation. In the event of an emergency, service shall be provided within two (2) hours.
The contractor must provide a constantly monitored telephone number that can be reached 24 hours a day, 7 days a week, for service.
Contractor’s use of site:
This is an occupied site and normal operations must be maintained during performance of work. Do not unreasonably encumber site with materials or equipment. Where in certain instances unavoidable, advise Owner Representative ahead of time and make suitable arrangements.
Working Hours:
Work will be carried out Monday to Friday, 8:00 a.m. to 5:00 p.m., unless otherwise approved by Owner Representative.
Working times must be coordinated with Owner’s Representative prior to commencement of work.
GENERAL INFORMATION
File details come from the government source that posted it. Updated .