This Design Criteria Package is issued by the City of St. Petersburg, Florida for a progressive Design-Build Marina Redevelopment project spanning the North, Central, and South Marina Basins. The project scope encompasses design and construction of floating docks, dock houses, ship store renovation or replacement, fueling facilities, seawalls, bridge replacement connecting to Demens Landing, utilities infrastructure, roadway improvements, and associated facilities. The Design-Build firm will deliver pre-construction services including conceptual design, cost modeling, value engineering, constructability review, risk analysis, and permitting, followed by construction services and commissioning. Minimum improved facilities total approximately 14,700 square feet and include a ship store (2,000 sf), covered bath building (3,500 sf), laundry building, dock houses ranging from 1,000 to 5,000 sf, maintenance facility (1,700 sf), and marina admin office (1,500 sf). The solicitation was released October 28, 2025, with proposal responses due December 2, 2025 at 3:00 pm, followed by interviews of shortlisted candidates on January 13, 2026. Substantial completion is required within 60 months from Notice to Proceed.

The project operates under a total construction budget of $148,000,000 with guaranteed maximum price packages to align with City budget phasing. The Design-Build firm must be licensed as a general contractor in Florida and will serve as the single point of contractual responsibility, publicly bidding trade contracts and competitively bidding self-performed work. The firm must demonstrate experience in coastal marine facilities design, saltwater environments, seawall construction, bridge replacement, and facilities in coastal high-hazard zones. Evaluation criteria allocate 33 points for team background, 25 points for relevant experience, and 22 points for project approach. The project includes preferences for Minority Business Enterprises, Small Business Enterprises, Women Owned Business Enterprises, and Disadvantaged Business Enterprises. Insurance requirements include $10,000,000 Commercial General Liability, $5,000,000 Pollution/Environmental Liability, and $5,000,000 Professional Liability. A Public Construction Bond equal to cumulative guaranteed maximum prices, with surety rating of "A" and Class VII financial category, is required. The project emphasizes resilience and sustainability, with seawalls and bridges designed for minimum 75-year service life consistent with Tampa Bay Regional Planning Council sea level rise recommendations.

View the file

Other files

File Type Posted
Marina_Redevelopment_(Project_No._25204-130)_(Addendum_#2_Revision).pdf PDF
Marina_Redevelopment_(Project_No._25204-130)_(Addendum_#1_Revision).pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_PROOF_1.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_RECEIPT.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_PROOF_1.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_RECEIPT.pdf PDF
Marina_Redevelopment_(Project_No._25204-130).pdf PDF
Public_Construction_Bond_.pdf PDF
SF330-21a.pdf PDF
SF330-21a.pdf PDF
Public_Construction_Bond_.pdf PDF
SF330-21a.pdf PDF
Public_Construction_Bond_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
Exhibit_E_-_Design_Criteria_Package.pdf PDF
Exhibit_E_-_Design_Criteria_Package.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Solicitation_Development_Form_(Internal_Use_Only).pdf PDF
Solicitation_Development_Form_(Internal_Use_Only).pdf PDF
Solicitation_Development_Form_(Internal_Use_Only).pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit E - Design Criteria Package Progressive Design-Build

Marina Redevelopment City Of St. Petersburg, Florida

Project No. 25204-130

INTENT

The City of St. Petersburg (“City”) invites qualified Firms to submit qualifications to provide Design- Build (“DB”) services at a Guaranteed Maximum Price (“GMP”) for the design and construction of the scope items provided below for the Marina Redevelopment (“Project”), including any additional work necessary for the completion of the Project

The DB Firm should have experience in the development of coastal marine facilities (saltwater environment), including seawalls, accessory buildings with experienced design professionals specializing in bridge replacement and design of facilities within coastal high hazard zones. The City will utilize a progressive DB delivery method.

The project is multi-phased within the North, Central, and South Marina Basins:

NORTH

BASIN

CENTRAL

BASIN

SOUTH

BASIN

BACKGROUND

This Project involves the design and construction of floating docks, dock houses, the renovation or replacement of the ship store, fueling facilities, seawalls adjacent to each of the marina basins, and bridge connecting to Demens Landing and associated infrastructure. Work will also include routinely inspecting the existing facilities for safe operations, and sequencing the replacement or selective rehabilitation of elements.

This is a capital project under a progressive DB delivery method to realize synergies between all components, minimize disruptions, and assign a single point of contractual responsibility for the redevelopment of the Marina.

Separately, the City is issuing an RFQ for the commercial development of the southeast corner of 2nd Avenue and Bayshore Drive NE. The DB will be required to coordinate with the selected developer.

SCOPE

The DB Firm shall participate in the design process, perform construction cost estimating, provide value engineering, constructability review and risk analysis, obtain permits, manage the schedule, maintain operations, and perform construction services and commissioning. All DB Firms must be licensed to practice as general contractors in the State of Florida pursuant to Chapter 489 Florida Statutes by the submittal date for proposals.

The contract for DB services shall consist of the pre-construction phase and the construction phase. The Pre-construction Services Phase, for which the DB Firm will be paid a fixed fee, will include design, cost estimating, value engineering, constructability review, risk analysis, and preparing the GMP during the design development. The pre-construction Services will include multiple GMPs dependent upon design components, construction sequencing, long-lead, and owner-direct purchase items. It may be possible to have multiple critical paths.

If the GMPs are accepted by City staff and approved by City Council, the Construction Services Phase will be authorized following execution of the agreement for construction services. In all aspects of the contract, the DB Firm serves as the single point of responsibility for the successful performance of the pre-construction and construction of the project and shall publicly bid trade contracts. The self‑performed work shall be competitively bid along with the subcontractors in accordance with the contract.

Comprehensive Pre-construction and Construction Service Phases shall include, but not be limited to, the following components:

Coordination:

• The DB team will coordinate with the commercial developer of the SE corner of 2nd Ave and Bayshore Dr NE, the St Pete Pier, Special Events, and other City Departments as needed. This may include, but not limited to:

o Phasing o Architectural cohesion of the dock houses, operational facilities, and fueling station.

o Coordination with the City and other local stakeholders.

Minimum Improved Facilities:

Facility Estimated Square Footage Comments

Ship Store and Offices 2000 Covered Bath Building

Covered Laundry Building Covered Bath Building 2 Demens Dock House 5000 Maintenance Facility 1700 includes 500 sf laydown area West Dock House to be removed North Dock House 1000 Marina Admin Office 1500

14700

• Final square footage and storm category rating for each dock house will be determined as part of the cost feasibility during the Pre-Construction Phase.

Docks and Dock Houses:

• Design and construction for the replacement of existing dock houses, o Dock houses to be located at:

South side of the St. Pete Pier Approach to include, but not limited to, bathrooms, shower, and seating amenities.

North side of Demens Landing to include, but not limited to, bathrooms, shower, and seating amenities.

South Side of Demens Landing to include, but not limited to, bathrooms, showers, seating, laundry facilities, and amenities.

o Dock houses shall be designed and constructed to be resilient and include flood protection measures.

o As part of the Pre-Construction Phase, the DB shall develop alternatives for either replacement of the Ship Store and associated fuel station with a new building and associated fuel station, or combining the operation building with the dock house located on the south side of Demens Landing and a separate fueling station with a smaller building.

Maintenance Facilities and Fueling Station:

• Design and construction for the replacement of existing operational facilities and fueling station.

• Operational facilities shall include adequate space for operational staff and equipment as identified in the table above.

• Fuel station shall include replacement of the existing fuel tank and pumps.

Utilities:

• Design and construction for the replacement of existing utilities to ensure the Level of Service can be maintained.

o Stormwater:

Stormwater treatment and attenuation consistent with current State and

Federal regulations.

Implement stormwater improvements which improve water quality and are nature-based.

Design as-needed repairs and in-kind infrastructure replacements. All design work will conform to the City’s Standard Specifications.

o Water/Wastewater:

Consolidate/rehabilitate/replace existing and extend new infrastructure to ensure the level of service is maintained based on the reconfigured site, docks, and other facilities.

This will include providing service to the site, docks, or other facilities improved within this scope of services.

Replace existing utilities up to their respective point of connection along Bayshore Drive.

o Other utilities Coordinate with other service providers to install services to the site, docks, and other facilities improved within this scope of services. These may include, but are not limited to, cable, fiber optic, etc.

Roadway:

• Design and construction for the replacement of existing utilities to ensure the Level of Service can be maintained.

o Aging infrastructure, utility repairs, and increased traffic have caused advanced degradation of the roadway surface within Demens Landing. Conduct a boring analysis of the roadway and develop a plan to repair or reconstruct the roadway.

o Design and construction of, but not limited to, roadway, parking, curb, signage, and striping o Survey and evaluate all sidewalks and ramps within the Project limits for ADA compliance. Design and construct new ramps, curb & gutter, and appurtenances as needed to obtain ADA compliance.

Bridge Replacement:

• Design and replace the existing bridge connecting to Demens Landing.

• Bridge shall replicate the existing aesthetics and include design elements consistent with current City standards for railing design.

Seawall Replacement:

• Design and replace seawalls adjacent to new docks or as identified by the City Engineer during Pre-Construction.

Resilience:

• Conduct a wave action study to confirm minimum requirements for all floating structures.

• Design and construct facilities consistent with current sea level rise projects and consistent with the Tampa Bay Regional Planning Council recommendations.

• Design and construct all seawalls and bridges for a minimum 75-year service life.

Budget and Guaranteed Maximum Price Development:

• Develop a design consistent with the City Construction Budget of $148,000,000.

• Develop an overall schedule and multiple Guaranteed Maximum Price packages to align with City budget phasing.

Schedule:

• Develop a project sequence which minimizes the timeframe for overall shutdown of the Marina, allowing for phased opening of sections such that the City can obtain beneficial use.

• Substantial completion shall be completed within 60 months from Notice to Proceed.

Other Related Projects:

• As determined by the City.

TASKS

The Scope of Services includes, but is not limited to:

Task 1 - Pre-construction services phase

1.1 Conceptual/Schematic Design, Cost Model, and Value Engineering:

1. Confirm utility design capacity for average and peak daily flow based on information provided by the Developer team.

2. Facilitate, prepare, and maintain a risk register.

3. Provide design for all components identified within the project scope.

4. Provide back-up power generation.

5. Provide design for mechanical, structural, and electrical components consistent with City, State, and Federal Standards.

6. Provide design for a pump station building enclosure consistent with the architectural aesthetic of the development.

7. Develop and update at every design milestone a cost model to serve as a basis for the Guaranteed Maximum Price (GMP).

8. Provide value engineering services.

9. Acquire long lead items through owner direct purchase process.

10. Identify permitting authorities and requirements, including pre-application meetings, and include in schedule and sequencing plan.

1.2 Develop GMP proposal(s) consistent with the terms of the AIA.

Task 2 - Construction Services

2.1 Provide construction management services to complete construction, start-up, and commissioning of all components of the scope identified above.

Task 3 - Public Outreach Services

3.1 Coordinate and participate in public outreach throughout the project in accordance with the Developer’s public outreach program.

CITY’S OBJECTIVES

The City’s objectives for delivery of the Project are as follows:

Quality:

• Design and construct system components, structures, and equipment that will be sustainable and consistent to meet all federal and state regulations. The City places high priority on the selection of equipment and the design of facilities that will provide a high level of reliability with the lowest level of maintenance cost and effort.

Schedule:

• Achieving the agreed-upon scheduled completion date.

Cost Control:

• Maintain or decrease project capital costs, as well as life-cycle costs, while achieving operations, quality, and schedule objectives.

Safety and Security:

• Implement an effective safety program incorporating best industry standards. Implement a security protocol that will ensure a safe environment that will protect the premises, property and systems, and individuals.

CONTRACT END ITEMS

A. The DB Firm will be required to work closely with City staff.

B. The DB Firm must be cognizant of the available budget for this project.

Exhibit E - Design Criteria Package
Progressive Design-Build