Exhibit D - Project Approach and Schedule Form.pdf
PDF 74 KB Posted
- Attached to
- Hope Coliseum AC-4 Replacement
- Solicitation number
- RFP202790000749
- Issued by
- West Virginia
About this file
This document is an Exhibit D Project Approach and Schedule Form for the Hope Coliseum AC-4 Replacement project in West Virginia. The form requires proposers to provide detailed responses to six primary questions addressing project methodology and three questions addressing schedule considerations. Proposers must explain how they will handle HVAC unit replacement while maintaining facility operations, detail their plan for removing the existing unit and installing the replacement within the existing space constraints, describe site preparation procedures and safety protocols, explain the sequencing of work to meet the project completion schedule, outline coordination and shutdown procedures for existing systems including power and controls, and identify any potential change order issues based on project documents and site conditions.
The schedule section requires proposers to confirm whether they can meet the provided project timeline and explain any concerns, provide approximate lead times for unit procurement and submittal shop drawing completion, and identify any foreseeable delays that would prevent project completion. Proposers may use additional pages as needed to fully answer all questions. The form does not specify pricing terms, set-asides, contract duration, or other financial details, as it focuses exclusively on technical approach and scheduling feasibility for this HVAC replacement project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposer may use additional space or pages to answer the questions above if needed.
#4 - How will the Proposer sequence the work to be completed to meet the proposed project completion schedule?
Exhibit D - Project Approach and Schedule Form
#2 - How does the Proposer plan to remove the existing unit and install the proposed replacement unit within the existing space available?
COMPLETE ALL QUESTIONS BELOW
QUESTION
ANSWER
#1 - How will the Proposer handle the HVAC unit replacement within an existing facility that has to remain operational?
QUESTION
QUESTION
ANSWER
QUESTION
#3 - How will the Proposer handle site preparation, site safety/security, and protecting the existing facility conditions.
ANSWER
QUESTION
ANSWER
COMPLETE ALL QUESTIONS BELOW
SCHEDULE
#5 - How will the Proposer handle the coordination and shutdown of existing systems such as power, controls, etc.?
ANSWER
QUESTION
#6 - Does the Proposer see anything from the project documents, specifications, and or existing site conditions that would lead to potential change orders outside of their scope of work?
ANSWER
QUESTION
#1 - Does the Proposer see any issues with completing the project within the timeline provided in the documents, if so please explain ?
ANSWER
QUESTION
ANSWER
#2 - The Proposer should supply the approximate lead time below for the unit and how long they will need for submittal shop drawings to be complete to work within the proposed project timeline.
ANSWER
QUESTION
#3 - Does the Proposer foresee any delays that would not allow the project to be completed? If so please explain.
File details come from the government source that posted it. Updated .