This document is an exhibit from Collier County Public Utilities defining the 5N-Reliability Engineering Criteria for solicitations, agreements, and contracts related to water and wastewater infrastructure facilities. The performance criteria establish strict 24/7/365 environmental and operational standards for facilities including water plants, wastewater plants, master and community pump stations, solid waste sanitary landfills, and transfer stations.

The 5N-Reliability Engineering Criteria mandate zero tolerance for offsite impacts, specifically: no offsite odors, no spills (onsite or offsite), no fugitive dust emissions, no offsite noise, and no offsite light emissions. Any deviations from these criteria require advance review and approval by both the Engineering and Operations Division Directors, with final authorization from the Department Head. These standards are designed to ensure consistent environmental compliance and minimal community disruption for public utility infrastructure projects.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following 5Ns are the PUD Performance Criteria that needs to be considered and included in

• solicitations,

• agreements,

• contracts, that are specifically related to our Water Plants, Wastewater Plants, Master Pump Stations, Community Pump Stations R&Rs, Solid Waste Sanitary Landfills, Transfer Stations, among others

PUBLIC UTILITIES

5N-RELIABILITY ENGINEERING CRITERIA

No offsite odors | 24/7/365

No SSOs-Spills offsite/onsite | 24/7/365

No offsite fugitive-dust emissions | 24/7/365

No offsite Noise | To be mitigated prior to fence line per Code | 24/7/365

No offsite Light emissions | To be mitigated prior to fence line per Code

Any deviation to above 5N-Reliability Engineering Criteria and guidance has to be reviewed and recommended by both Engineering and Operations Division Directors in advance for approval by the Department Head.