Water Ground Storage Tank Cleaning and Inspection
Solicitation number
25-8404
Issued by
Collier County, Florida

About this file

This Invitation to Bid (ITB) is issued by the Collier County Board of County Commissioners Procurement Services Division for the Reclaimed Water Ground Storage Tank Cleaning and Inspection project. The solicitation seeks a contractor to provide labor, materials, tools, and equipment to thoroughly clean and inspect seven ground storage tanks located throughout Collier County, Florida. The pre-bid meeting is scheduled for July 2, 2025, at 10:00 AM EST, with bids due on July 18, 2025, at 3:00 PM EST. The contract term is intended to be three years with two one-year renewal options, and the work involves cleaning and inspecting tanks at various locations including Countryside, Foxfire, Glades, Royal Palm, and Pelican Bay facilities.

The contract will be awarded based on the lowest total bid, with Collier County reserving the right to select one or more contractors or award on a line-item basis. The contractor must meet specific qualifications, including three years of similar experience, using an OSHA-compliant three-person dive team, and ensuring site supervisors have relevant certifications in Confined Space Entry, First Aid, and CPR. The tanks range in capacity from 0.5 to 2.5 million gallons, and the work requires comprehensive cleaning, inspection, and reporting, with strict safety and quality control requirements. Prices are to remain firm for the initial contract term, and no surcharges will be accepted.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Services Division

COLLIER COUNTY

BOARD OF COUNTY COMMISSIONERS

INVITATION TO BID (ITB)

FOR

Reclaimed Water Ground Storage Tank Cleaning and Inspection

SOLICITATION NO.: 25-8404

OLIVIA PUGA, PROCUREMENT STRATEGIST

PROCUREMENT SERVICES DIVISION

3295 TAMIAMI TRAIL EAST, BLDG C-2

NAPLES, FLORIDA 34112

TELEPHONE: (239) 252-4286

Olivia.Puga@colliercountyfl.gov (Email)

This solicitation document is prepared in a Microsoft Word format. Any alterations to this document made by the Bidder may be grounds for rejection of the bid, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government.

SOLICITATION PUBLIC NOTICE

INVITATION TO BID (ITB) NUMBER: 25-8404

PROJECT TITLE: Reclaimed Water Ground Storage Tank Cleaning and Inspection

PRE-BID MEETING: July 2, 2025 at 10:00am est

LOCATION: PROCUREMENT SERVICES DIVISION, CONFERENCE ROOM A, 3295

TAMIAMI TRAIL EAST, BLDG C-2, NAPLES, FLORIDA 34112

DUE DATE: July 18, 2025 at 3:00pm est

PLACE OF BID OPENING: PROCUREMENT SERVICES DIVISION

3295 TAMIAMI TRAIL EAST, BLDG C-2

NAPLES, FL 34112

All bids shall be submitted online via the Collier County Procurement Services Division Online Bidding System:

https://procurement.opengov.com/portal/collier-county-fl.

INTRODUCTION

As requested by the PUD Wastewater – Irrigation Quality Division (hereinafter, the “Division or Department”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Invitation to Bid (hereinafter, “ITB”) with the intent of obtaining bid submittals from interested and qualified Contractors in accordance with the terms, conditions and specifications stated or attached. The Contractor, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated.

BACKGROUND

Collier County Irrigation Quality (IQ) is a utility that provides Irrigation Quality Water to more than 50,000 residential, commercial, and governmental customers throughout Collier County.

Collier County IQ is seeking a Contractor to provide all labor, materials, tools, and equipment required to complete the thorough cleaning and inspection, including site mobilization, staging, and demobilization of various Collier County IQ water storage tanks at various locations throughout the Collier County area.

TERM OF CONTRACT

The contract term, if an award(s) is/are made, is intended to be for three (3) years with two (2) one (1) year renewals.

Prices shall remain firm for the initial term of this contract.

Surcharges will not be accepted in conjunction with this contract, and such charges should be incorporated into the pricing structure.

The County Manager, or designee, may, at her discretion, extend the Agreement under all the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect.

All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remains with

CONTRACTOR.

AWARD CRITERIA

The ITB award criteria are as follows:

For the purposes of determining the winning bidder, the County will select the Contractor with the lowest price as outlined below:

Lowest Total Bid

Collier County reserves the right to select one or more contractors, award on a line-item basis, establish a pool for quoting, or other options that represent the best value to the County; however, it is the intent to:

Single Awardee

The County reserves the right to issue a formal contract or standard County Purchase Order for the award of this solicitation.

DETAILED SCOPE OF WORK

1. INTRODUCTION

Collier County IQ is seeking a Contractor to provide all labor, materials, tools, and equipment required to complete the thorough cleaning and inspection, including site mobilization, staging, and demobilization of Collier County water storage tanks at various locations throughout the Collier County area.

2. CONTRACTOR MINIMUM QUALIFICATIONS

2.1 The Contractor must meet the following minimum qualifications, as evidenced by their references or may be deemed non-responsive:

2.1.1 The Contractor must have at least three (3) years of experience performing work similar in scope to the services required under this solicitation.

2.2 The Contractor must use an OSHA-compliant three-person dive team to perform wet inspections and tank cleaning.

2.3 Each Site Supervisor assigned to this project must have a minimum of three (3) years of relevant experience.

2.4 All Site Supervisors must hold current certifications in Confined Space Entry, First Aid, and CPR. The certifications are to be provided at the time of bid submittal.

3. GENERAL REQUIREMENTS

3.1. The Contractor shall provide ground storage tank cleaning and inspection services at seven (7) locations throughout the Collier County IQ area. All work shall be performed under the direction of Collier County IQ’s Representative, or designee, and in accordance with the guidelines and specifications detailed herein.

3.2. The Contractor shall furnish all labor, materials, tools, and equipment required to complete the thorough wet cleaning and inspection, including site mobilization, staging, and demobilization, of the following Collier County IQ ground storage tanks:

Storage Facility Name Capacity

Countryside - 4701 Santa Barbara Blvd., Naples, FL 34104 .925 MG

Foxfire - 5500 Radio Rd., Naples, FL 34104 1.1 MG

Glades - 105 Palm Dr., Naples, FL 34112 2 MG

Royal Palm - 5630 Warren St., Naples, FL 34113 1.3 MG

Pelican Bay GST 1 - 6200 Watergate Way, Naples, FL 34108 2.5 MG

Pelican Bay GST 2 - 6200 Watergate Way, Naples, FL 34108 .5 MG

Pelican Bay GST 3 - 6200 Watergate Way, Naples, FL 34108 .5 MG

3.3. The Contractor shall provide all necessary procedures, equipment, trained and certified personnel for compliance with all applicable regulatory permitting and requirements for Confined Space Entry, and for compliance with OSHA for the required work. The Contractor shall also comply with all relevant regulatory requirements of Collier County, relevant Federal Regulatory Agencies.

3.4. The Contractor shall maintain on the job site, at all times, a competent site supervisor in charge of the job site. The field supervisor shall report to the Collier County IQ Representative, or designee, prior to commencement of work.

Any change in supervision must also be reported immediately via email to the Collier County IQ Representative, or designee, prior to the change being effective. The field supervisor shall be responsible for the safety of all site workers and site conditions, as well as ensuring that all work is conducted in conformance with the specifications and to the level of quality specified in the contract.

3.5. The Contractor shall maintain the site in a clean and presentable condition throughout the course of the work being performed. The work shall be done in such a fashion as to ensure protection of existing trees, lawns, fences, and structures on the site and all adjoining properties from damages due to work performed under the resultant contract.

3.6. The Contractor shall conduct all work in accordance with the OSHA Permit.

3.7. The Contractor shall perform work at only one tank facility at any given time. Once tasks associated with cleaning a tank have been initiated, work shall be performed each consecutive workday until all work at that facility is complete.

4. SITE PREPARATION

4.1. At the time the inspection is to be conducted, Collier County IQ will have the water level as full as possible.

4.2. The Collier County IQ Representative, or designee, shall notify the Contractor within twenty-four (24) hours from the time a tank is available for cleaning.

4.3. The Contractor shall make provisions to permit entry and exit from the storage tanks in a safe manner for both workers and Collier County IQ Representative, or designee. Access to the interior of the tank is available via the roof access hatch.

5. CLEANING

5.1. The Contractor shall provide all equipment, materials, labor, and procedures necessary to thoroughly clean all interior surfaces of the tank via a diver-assisted vacuum system. The clean out will include up to 4” of soft, silty sediment.

5.2. The Contractor is solely responsible for the removal and disposal of all wastewater and solid waste resulting from their operations.

5.3. The Contractor shall discharge all wastewater and material from the tank by a method approved by the Collier County

IQ Representative, or designee, in accordance with the following:

Solid Waste: The Contractor shall comply with all Federal, State, and Local regulations regarding the disposal of solid waste. All material removed from the tank shall be contained within the tank property. The Contractor shall advise himself of all applicable regulations and shall undertake any necessary testing to comply with said regulations. The Contractor shall pay for all costs associated with testing, permits, and disposal of solid wastes generated as a result of the project (if required). Solid waste and debris shall not be disposed of into sanitary or combined sewers.

Wastewater: Wastewater from the cleaning process shall be fully contained within the property and shall not be drained into the existing storm drains. The Contractor shall remove the wastewater from the tank and discharge it at a rate that does not create flooding.

The Contractor shall coordinate and confirm the identification and type of every proposed discharge location with Collier County IQ prior to discharging any wastewater.

5.4. The Contractor shall notify the Collier County IQ Representative, or designee, when the tank cleaning has been completed.

6. POST–CLEANING INSPECTION

6.1. At the completion of each tank cleaning and prior to demobilization, the Contractor shall provide access for the Collier

County IQ Representative, or designee, and/or consultants to perform a detailed inspection of the facility.

6.2. The Contractor shall provide all the support personnel and equipment necessary to conduct the inspection, including entry permit, site supervisor, and all necessary equipment required to provide a safe environment to support inspection of the facility, including lighting, ventilation, scaffolding, ladders, and gas meters.

6.3. The Contractor shall coordinate the inspection with the Collier County IQ Representative, or designee, at least twenty-four (24) hours in advance of the cleaning completion date.

6.4. The Contractor shall provide personnel, materials, and equipment, specified by the Collier County IQ Representative, or designee, to assist during the inspection of each facility. The work shall consist of, but not be limited to:

Moving or holding scaffolds, ladders, lights, tapes.

Passing tools.

Cleaning surfaces.

Bringing materials in and out of the tank; and Operating the generator for lights, air blowers, pumps, and any other necessary equipment.

6.5. The Contractor shall clean the tank as necessary to remove residual debris and materials after the inspection is completed. The Contractor shall remove all equipment and materials that are no longer required from the work site, and all vehicles shall be parked within approved parking areas.

6.6. The Contractor shall check and replace as needed the vents, screens, overflow screens, and any other screened openings to prevent birds, insects, and other possible contaminants from entering the facility, following the final cleaning operation. The Contractor shall provide and install new vents/screens, as deemed necessary, based on the condition of the equipment.

6.7. The Contractor shall replace all lawn, pavements, roads, and walkways removed or damaged by the contract operations. Paved surfaces shall be restored with new materials to match their previous condition at no additional cost to Collier County IQ, in accordance with applicable sections of the Department of Road Maintenance Standard Specifications for Highways and Structures, latest edition, as amended unless superseded herein. Concrete curb and gutter, trench drains, catch basins, railroad tracks, manholes, and all other pavement features shall also be properly restored at no additional cost to the Collier County IQ.

6.8. Upon notification from the Collier County IQ Representative, or designee, that all work has been completed, the Contractor shall fully demobilize from the work site.

7. FINAL INSPECTION AND ACCEPTANCE

7.1. The Contractor shall remove all remaining equipment, debris, unused material, and unwanted evidence of the project from the work site upon completion.

7.2. Upon completion of all work, a final inspection of the site will be undertaken at which time representatives of Collier County IQ and the Contractor will be in attendance. Any unsatisfactory cleanup will be indicated by Collier County IQ, and the Contractor shall correct all such deficiencies to the satisfaction of Collier County IQ within the timeframe agreed upon.

7.3. The measurement for work associated with the resultant contract shall be a fixed price per facility, as established in the bid schedule. Acceptance of work shall occur at the completion of cleaning and once inspection results meet Collier County IQ standards and the work site is fully demobilized to the satisfaction of the Collier County IQ Representative, or designee.

7.4. Within ten (10) business days of final inspection and acceptance, the Contractor shall, upon completion of the cleaning of a tank the Contractor shall provide a Final Written Report via email to the Collier County IQ Representative, or designee, to include, at a minimum, the following:

A summary of the work completed.

A summary of any unexpected issues occurring during the tank cleaning process.

Provide a Florida State P.E. signature on all inspection reports.

Recommendations for future tank cleaning.

A copy of the invoices will be submitted to Collier County IQ for payment.

8. PERSONNEL

8.1. The Contractor's employees assigned to work in a tank shall be in good health and free from infectious diseases and illness.

8.2. The Contractor shall provide current Health Certificates to the Collier County IQ Representative, or designee, for all employees assigned to work in a tank five (5) days prior to the scheduled start of work for each tank. The Collier County IQ Representative, or designee, has the right to refuse any person entrance into a tank for medical reasons.

9. EQUIPMENT

9.1. If required, the Contractor shall furnish, erect, dismantle, and remove all rigging and scaffolding on the interior of the storage tank necessary to perform the required work. Scaffolding and rigging shall be erected in a manner that will permit access for visual inspection of all interior surfaces. Scaffolding shall be so designed and constructed as to assure structural stability and carry all construction loads without excessive deflection or vibration. Scaffolding design and installation shall meet all applicable requirements of OSHA and other applicable regulations. All scaffolding and rigging shall be erected in a manner that will prevent interference with surfaces to be cleaned.

9.2. The Contractor shall furnish all labor, materials, tools, and equipment required to provide adequate and safe ventilation and lighting systems necessary to complete the work, including that necessary to access each facility. Lighting and ventilation systems shall comply with applicable requirements of Collier County IQ and relevant State and Federal Regulatory Agencies. All lighting shall be explosion-proof, and all electric power should have adequate ground-fault protection.

9.3. The Contractor shall provide heating apparatus approved by the Collier County IQ Representative, or designee, if temporary heating is required for the protection of the workers, materials, and/or equipment. Temporary heating apparatus should be installed and operated in such a manner that the finished work is not affected.

9.4. All equipment and/or materials used within the interior of the reservoir or tank shall be approved for use in contact with water by the Underwriters Laboratories (UL) and all other applicable regulatory agencies.

9.5. No motorized or hydraulic equipment or machinery containing oils, fuels, or lubricants, or other non-NSF-approved fluids shall be placed inside the tank.

9.6. The Contractor shall ensure that all equipment is maintained properly and that all personnel using the equipment are trained and use all equipment properly.

9.7. No gasoline/diesel powered motorized or hydraulic equipment or machinery shall be placed inside the tank.

9.8. Sediment/debris cleanup and removal shall be conducted by manual or suction means and methods.

10. SITE ACCESS

10.1 The Contractor shall be allowed to access the storage facility sites only during Collier County IQ working days between the hours of 7:00 am and 5:30 pm, Monday through Friday.

10.2 To gain access to the storage facility sites, all Contractor employees or subcontractor employees must have a valid

Collier County photo identification badge that can be obtained from Collier County Facilities Management at (3335 Tamiami Trail East, Suite 101, Naples, FL 34112) and a valid government-issued ID.

11. CONTRACTOR'S STAGING AREA

11.1. The Contractor’s staging area shall be within the area to be designated by the Collier County IQ Representative, or designee. The Contractor’s use of these areas shall be confined to storage and such activities that will not conflict with any applicable safety and building codes. Before final acceptance and release of the tank, this area shall be restored to its pre-construction condition or better.

11.2. Prior to mobilizing, the Contractor shall provide the Collier County IQ Representative, or designee, with video and photographic documentation of the conditions of each area that is to be set aside for the Contractor’s use, along with a written description of the condition of any mechanical equipment within these areas. The Collier County IQ Representative, or designee, will verify the accuracy of the conditions described in the written letter statement, depicted by video and photographs, and will later use them to confirm the restoration of the subject areas during the final inspection.

12. CONFINED SPACE ENTRY

Work under this project will be performed in confined spaces. Prior to beginning work on the Contract, the Contractor shall assess all areas requiring access under the Contract and submit to the Collier County Safety Representative a Confined Space Entry Program and Confined Space Entry Permit application/checklist for each area that qualifies as a confined space.

The Contractor shall comply with all applicable Federal and local confined space laws and regulations, including OSHA, 29 CFR 1910.146.

The Contractor shall notify the Collier County IQ Representative, or designee, 24 hours in advance whenever confined space entry activities will occur.

13. SAFETY

The Contractor shall adhere to the following:

The Contractor shall provide the following safety equipment for his/her employees and Collier County IQ Representative, or designee, and consultants performing the inspection:

Testing and monitoring equipment needed for oxygen, combustible gases and vapors, and toxic gases and vapors.

All necessary ventilation and heat are required to maintain the atmospheric conditions inside the tank suitable for working conditions and for surface cleaning. Ventilating equipment, blowers, and air hoses, if needed, to obtain acceptable entry conditions.

Communications equipment necessary to enable the attendant to monitor entrant status and to enable the attendant to alert entrants of the need to evacuate the space, including one (1) two-way radio per person and a portable cellular phone.

Personal protective equipment: safety eyeglasses, rubber boots, safety shoes, hard hats, earplugs, raincoats, hand gloves, protective clothing, self-contained breathing equipment, full body harness and retrieval devices, first aid kit, respirators suitable for chemicals utilized or other necessary equipment. The Contractor will not be required to provide personal protective equipment to the inspectors.

Lighting equipment needed to enable employees to see well enough to work safely and to exit the space quickly in an emergency: Battery-powered flashlights, and all lights should be explosion-proof if necessary.

Barriers, shields, and signs necessary to protect pedestrians, vehicles, or entrants from external hazards:

Barricades shall be erected around all sumps and pipes within the reservoir/tank.

Equipment, such as ladders needed for safe ingress and egress to the tank by authorized entrants.

Rescue and emergency equipment, except for equipment provided by a rescue service.

Portable generators to run lights, pumps, and air blowers, including necessary fuel. The generator exhaust shall be directed away from air intakes to the reservoirs/tanks.

Any other equipment necessary for work performed in confined space entry areas.

The Contractor shall be prepared to perform work under the following reservoir/tank conditions:

Limited or restricted means for entry or exit.

Slippery surfaces.

Lack of lighting.

Are not designed for continuous employee occupancy.

Are large enough and so configured that an employee can enter and perform assigned work.

May have oxygen-deficient atmospheres.

May contain chlorine gas.

Have the potential to engulf an entrant by water.

May have unsafe/broken ladders.

May have unprotected openings in floors.

May have sediments on floors.

May have a falling object.

May have protruding objects.

May have water dripping from the ceiling; and May have seepage from walls or floors.

May have leaky influent, effluent, or drain valves; and/or May have root intrusion.

14. QUALITY ASSURANCE / QUALITY CONTROL(QA/QC)

14.1. The Contractor shall maintain an internal QA/QC program to be submitted to and approved by the Collier County IQ Representative, or designee, prior to the commencement of any work.

14.2. The work shall be performed in accordance with the best practice of the industry, and workmanship shall be of the best quality. The specifications call attention to certain features but do not purport to cover all details entering the required work.

15. SEQUENCE OF WORK AND OUTAGE LIMITATIONS

15.1. Sequence of Work and Scheduling - The Contractor shall perform the required work to meet the specified timeframe given in the resultant contract. All work shall be scheduled and proceed in such sequence as to avoid interference and delays to normal Collier County IQ operations.

15.2. The Contractor shall provide a proposed project schedule, including overall tank cleaning timeline and shutdown schedule, to the Collier County IQ Representative, or designee, within ten (10) business days after receiving a Purchase Order, but no later than fourteen (14) days prior to site mobilization.

15.3. The tank cleaning timeline shall include, at a minimum, a schedule from site mobilization to final inspection and acceptance for all tanks to be cleaned in a contract year.

15.4. The proposed shutdown schedule shall include the following for each individual shutdown required: summary description; shutdown time and date; a time scheduled sequence of tasks, including identification of critical stages in the project where a decision to abort the operation would be made if satisfactory progress were not being made or unforeseen conditions would likely result in excessive out-of-service duration; and if necessary, justification for valve operations that are outside of the normal work day (non-holiday weekdays between 8:30 am and 3:30 pm).

15.5. The Contractor shall allow Collier County IQ a fourteen (14) day review period for the overall shutdown schedule and, as required by Collier County IQ, the Contractor shall adjust/modify the shutdown schedule accordingly.

15.6. At least five (5) days prior to the interruption of service, the Contractor shall submit a Shutdown Request to the Collier County IQ Representative, or designee. The Contractor shall be limited to scheduling one shutdown at a time.

16. WORK BY COLLIER COUNTY IQ

16.1. Collier County IQ will provide all shutdowns necessary for the resultant contract. The County will open and close valves for the Contractor on weekdays between 8:30 a.m. and 3:30 p.m., excluding city emergencies.

For scheduled shutdowns that extend outside of the normal workday (non-holiday weekdays between 8:30 a.m. and 3:30 p.m.), Collier County IQ will open and close valves, as specified in the approved overall shutdown schedule submitted as outlined in Section 15: Sequence of Work and Outage Limitations.

16.2. Under normal circumstances, Collier County IQ will attempt to provide shutdowns during the appointed hour. However, for the convenience of the consumers, shutdowns of water mains may be scheduled outside of normal work hours.

16.3. The Contractor shall be responsible for the planning required to accomplish the work of this contract, including submittal of proper notifications to Collier County IQ for the shutdown of any valves.

VENDOR CHECKLIST

***Vendor should check off each of the following items as the necessary action is completed (please see Vendor Check List)***

The County requests that the vendor submit no fewer than three (3) and no more than ten (10) completed reference forms from clients during the past 5 years, whose projects are of a similar nature to this solicitation as a part of their proposal. Provide information on the projects completed by the vendor that best represent projects of similar size, scope, and complexity to this project using Form 5 provided in OpenGov as part of the Required Forms. Vendors may include two (2) additional pages for each project to illustrate aspects of the completed project that provide the information to assess the experience of the Proposer on relevant project work.