Exhibit_C,_PRIME-SUB_FORM_for_Contractors,_26-B-92SR_(SUBMIT_WITH_YOUR_BID).xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-92SR
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit C) for ITB No. 26-B-92SR issued by the County of Volusia, Florida, Department of Public Works, Road & Bridge Division, for the Main Street Bridge Deck Repairs project (Bridge #794004 over Halifax River). The project scope includes replacing full depth concrete on the eastbound deck, sidewalk, and railing on Span 47, with all associated work including traffic control, permitting, labor, materials, equipment, removal and disposal of materials, functional checks, O & M manuals, and as-built surveys and drawings. Bidders must complete this mandatory form identifying all proposed subcontractors and their assigned work disciplines and dollar values, with failure to submit the completed form resulting in a non-responsive bid determination.
The form requires bidders to allocate the total bid price between the prime contractor and all subcontractors, with each entity's dollar value and percentage of work clearly documented in designated cells. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any changes to subcontractors during project execution require prior approval from the County Project Manager. The County reserves the right to request clarification on subcontractors but will not permit modifications to the total base bid pricing. The form is also used to determine local preference eligibility in accordance with the solicitation requirements. Anticipated subcontractor disciplines include general trades, electrical, HVAC, plumbing, landscaping, and maintenance of traffic, with blank rows available for additional disciplines as needed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| C2081 | ITB No. 26-B-92SR | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| Maintenance of Traffic | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .