Exhibit_C_-_GRU_Construction_Inspection_Form.docx
DOCX document 37 KB Posted
- Attached to
- City Sidewalk Project
- Solicitation number
- 2026-005
- Issued by
- Alachua County, Graceville City, Florida
About this file
This is a Construction Inspection and Submittal Form (Exhibit C) developed by GRU (Gainesville Regional Utilities) in Florida for surface restoration projects involving asphalt and concrete work. The form serves as a standardized document to be submitted with each invoice and corresponding work order for projects that include asphalt resurfacing, concrete sidewalks and driveways, curb and gutter work, brick pavers, and pavement markings. Contractors must provide detailed general information including contractor name, GRU PO and work order numbers, work location, and description of work completed. The form requires submission of extensive supporting documentation with each pay request, including pre-work and post-work timestamped photographs (four of each), batch tickets, mix design specifications, material certifications, calibration certificates, traffic control plans, density or quality control test results, and warranty acknowledgments. Bid items specified include SP-12.5 asphalt at varying depths (1.0" and 1.5"), prime and tack coat applications, concrete sidewalks and driveways, concrete sidewalk ramps, concrete curb, brick pavers, painted and thermoplastic pavement markings, raised pavement markers, demolition and milling work, and temporary traffic control services.
The form incorporates a quality inspection section to be completed by the contractor certifying that surface restoration matches specified grades and slopes, asphalt density and finish meet FDOT standards, concrete finishes comply with FDOT requirements, curb alignment and elevation are consistent, brick patterns match existing conditions, pavement striping is correctly applied, sites are cleaned of debris, ADA compliance is verified, and temporary traffic control is removed upon completion. All materials and workmanship must conform to GRU and FDOT specifications and are covered under warranty per Section 01780. A GRU field inspector must verify work order entries in Cityworks, confirm quantities, review all photos and submittals, and provide final acceptance before payment authorization. The form establishes a standardized process for documentation, quality assurance, and payment verification for surface restoration contracts under GRU authority.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
GRU Surface Restoration Construction Inspection & Submittal Form To be submitted with each invoice and corresponding Work Order(s).
1. General Information
| Contractor Name: |
| Date of Submittal: |
| Invoice Number: |
| GRU PO Number: |
| GRU Work Order Number(s): |
| Address / Location of Work: |
| Description of Work: |
| Type of Work: |
| Date Work Completed: |
| Total Area (SF or LF): |
Cityworks Entry Completed: ☐ Yes ☐ No
| Contractor Representative: |
| Phone / Email: |
2. Submittal Checklist (Required with Pay Request)
| Submittal Item |
| Attached (Y/N) |
| Notes |
Pre-work timestamped photos (4 required)
Post-work timestamped photos (4 required)
Batch tickets (signed, dated, time-stamped)
Mix Design (gradation, binder, temperature, PG grade)
Material Certifications (binder, aggregates, tack coat, etc.)
Calibration Certificates (paver, roller, scales)
MOT/TTC Plan (signed & sealed by PE)
MOT/TTC Certification of field personnel
Density or QC test results (if required)
Warranty acknowledgment
3. Quantity & Pricing Verification (Per Pricing Form)
| Bid Item No. |
| Description |
| Unit |
| Quantity |
| Unit Price ($) |
| Total ($) |
| A.1 |
| SP-12.5 Asphalt (1.0") |
| SF |
| A.2 |
| SP-12.5 Asphalt (1.5") |
| SF |
| B |
| Prime / Tack Coat |
| SF |
| C |
| Concrete Sidewalk / Driveway |
| SF |
| D |
| Concrete Sidewalk Ramp |
| EA |
| E |
| Concrete Curb |
| LF |
| F |
| Brick Pavers |
| SF |
| G.1 |
| Painted Pavement Markings |
| SF |
| G.2 |
| Thermoplastic Pavement Markings |
| SF |
| G.3 |
| RPMs |
| EA |
| H.1-H.4 |
| Demolition / Milling |
| SF |
| I |
| Temporary Traffic Control |
| EA |
Total Invoice Amount ($)
4. Quality Inspection (To be completed by Contractor)
| Inspection Item |
| Pass/Fail |
| Notes |
Surface restoration matches grades/slopes
Asphalt density & surface finish per FDOT
Concrete finish meets FDOT requirements
Curb alignment & elevation consistent
Brick pattern & elevation match existing
Pavement striping/markers correctly applied
Site cleaned and free of debris
ADA compliance verified
MOT removed after completion
5. Warranty Certification The Contractor certifies that all materials and workmanship conform to GRU and FDOT specifications and are covered under warranty per Section 01780.
Contractor Representative: ___________________________ Date: ________________ Signature: ____________________________________________
6. GRU Field Verification (To Be Completed by GRU Inspector) Work Order verified in Cityworks
Quantities verified
Photos and submittals complete
Work accepted ☐ Yes ☐ No
Inspector Name:
Date:
Signature: