Exhibit_C_-_GRU_Construction_Inspection_Form.docx
DOCX document 37 KB Posted
- Attached to
- City Sidewalk Project
- Solicitation number
- 2026-005
- Issued by
- Alachua County, Graceville City, Florida
About this file
Exhibit C - GRU Construction Inspection & Submittal Form
This document is a construction inspection and submittal form issued by Gainesville Regional Utilities (GRU) in Florida for surface restoration projects involving asphalt and concrete work. The form serves as a standardized template for contractors to document work completion and submit payment requests for various surface restoration activities, including asphalt overlays at different thicknesses (1.0" and 1.5"), concrete sidewalks and driveways, curb installation, brick paver placement, pavement markings, and temporary traffic control services. Contractors must submit the form with each invoice and corresponding work order, providing general project information, contractor representative contact details, work completion date, and total area measurements. The form includes a comprehensive submittal checklist requiring pre- and post-work photographs, batch tickets, mix design documentation, material certifications, calibration certificates, MOT/TTC plans, density test results, and warranty acknowledgments.
The form establishes specific quality standards and inspection requirements aligned with FDOT (Florida Department of Transportation) specifications, including asphalt density verification, concrete finish compliance, proper grading and slope matching, curb alignment, ADA compliance verification, and site cleanup documentation. Both contractors and GRU field inspectors must certify work acceptance, with inspectors verifying quantities, photo documentation, and Cityworks database entries before payment authorization. Contractors must warrant that all materials and workmanship conform to GRU and FDOT specifications and maintain coverage under the applicable warranty provisions, ensuring accountability throughout the project lifecycle and establishing a clear verification pathway for invoice processing and work acceptance.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
GRU Surface Restoration Construction Inspection & Submittal Form To be submitted with each invoice and corresponding Work Order(s).
1. General Information
| Contractor Name: |
| Date of Submittal: |
| Invoice Number: |
| GRU PO Number: |
| GRU Work Order Number(s): |
| Address / Location of Work: |
| Description of Work: |
| Type of Work: |
| Date Work Completed: |
| Total Area (SF or LF): |
Cityworks Entry Completed: ☐ Yes ☐ No
| Contractor Representative: |
| Phone / Email: |
2. Submittal Checklist (Required with Pay Request)
| Submittal Item |
| Attached (Y/N) |
| Notes |
Pre-work timestamped photos (4 required)
Post-work timestamped photos (4 required)
Batch tickets (signed, dated, time-stamped)
Mix Design (gradation, binder, temperature, PG grade)
Material Certifications (binder, aggregates, tack coat, etc.)
Calibration Certificates (paver, roller, scales)
MOT/TTC Plan (signed & sealed by PE)
MOT/TTC Certification of field personnel
Density or QC test results (if required)
Warranty acknowledgment
3. Quantity & Pricing Verification (Per Pricing Form)
| Bid Item No. |
| Description |
| Unit |
| Quantity |
| Unit Price ($) |
| Total ($) |
| A.1 |
| SP-12.5 Asphalt (1.0") |
| SF |
| A.2 |
| SP-12.5 Asphalt (1.5") |
| SF |
| B |
| Prime / Tack Coat |
| SF |
| C |
| Concrete Sidewalk / Driveway |
| SF |
| D |
| Concrete Sidewalk Ramp |
| EA |
| E |
| Concrete Curb |
| LF |
| F |
| Brick Pavers |
| SF |
| G.1 |
| Painted Pavement Markings |
| SF |
| G.2 |
| Thermoplastic Pavement Markings |
| SF |
| G.3 |
| RPMs |
| EA |
| H.1-H.4 |
| Demolition / Milling |
| SF |
| I |
| Temporary Traffic Control |
| EA |
Total Invoice Amount ($)
4. Quality Inspection (To be completed by Contractor)
| Inspection Item |
| Pass/Fail |
| Notes |
Surface restoration matches grades/slopes
Asphalt density & surface finish per FDOT
Concrete finish meets FDOT requirements
Curb alignment & elevation consistent
Brick pattern & elevation match existing
Pavement striping/markers correctly applied
Site cleaned and free of debris
ADA compliance verified
MOT removed after completion
5. Warranty Certification The Contractor certifies that all materials and workmanship conform to GRU and FDOT specifications and are covered under warranty per Section 01780.
Contractor Representative: ___________________________ Date: ________________ Signature: ____________________________________________
6. GRU Field Verification (To Be Completed by GRU Inspector) Work Order verified in Cityworks
Quantities verified
Photos and submittals complete
Work accepted ☐ Yes ☐ No
Inspector Name:
Date:
Signature: