- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This document is a set of drawings and general notes for the Deception Pass State Park Marine Maintenance Vessel Float Replacement project, which is being managed by the Washington State Parks and Recreation Commission (WSPRC).
The project involves the design, fabrication, and delivery of a replacement moorage float for the MV Thunderbird at the Deception Pass State Park, Cornet Bay Marine Crew Pier. The float must be constructed of readily available marine industry equipment. The project team includes representatives from WSPRC and the engineering consultant Moffatt & Nichol. The drawings provide details on the project location, site plans, float sections and details, pile schedules, and general construction requirements. Key design criteria include a 40 PSF uniform live load, 100 mph wind load, and accommodating the MV Thunderbird vessel dimensions. The contractor is responsible for the final float design, obtaining necessary permits, and all construction means and methods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3.pdf | ||
| 325-327 PreBid Notes.pdf | ||
| Amendment 1.pdf | ||
| Exhibit B-Specifications.pdf | ||
| Attachment D-Area Map.pdf | ||
| Exhibit C-Drawings-2.pdf.crdownload | CRDOWNLOAD file | |
| RFP 325-327 Deception Pass-Float Fab.pdf | ||
| RFP 325-327 Prebid Presentation.pdf | ||
| Amendment 2.pdf | ||
| Exhibit A-Sample Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
PROJECT LOCATION
NORTH
VICINITY MAP
APPROVED FOR CONSTRUCTION
AREA MANAGER: JASON ARMSTRONG
date date
CA
D#
: D
0-
-2
PR
OJ
EC
T
TI
TL
E
M
AR
IN
E M
AI
NT
EN
AN
CE
V
ES
SE
L
FL
OA
T
RE
PL
AC
EM
EN
T
PROJECT TEAM
COVER SHEET
EXISTING SITE PLAN
INDEX
7 TESC AND DEMOLITION PLAN
DESCRIPTIONSHEET
160 CORNET BAY ROAD, OAK HARBOR, WA 98277
SEC-25 T-34-N R-01-E
ISLAND COUNTY TAX PARCEL NUMBER R13425-160-3960
LATITUDE: 48° 24' 1.70"
LONGITUDE: 122° 37' 24.74"
DECEPTION PASS STATE PARK
MARINE MAINTENANCE VESSEL FLOAT REPLACEMENT
MICHAEL LATIMER
KEN BOUNDS, CHAIR
SOPHIA DANENBERG LAURIE CONNELLY
REGION MANAGER
MARK O. BROWN
WASHINGTON STATE PARKS
& RECREATION COMMISSION CAPITAL PROGRAM MANAGER
DIANA DUPUIS, DIRECTOR
ALI RAAD HOLLY WILLIAMS
8 SITE PHOTOS
9 PROPOSED SITE PLAN
PROJECT LOCATION
DECEPTION PASS
STATE PARK
BRITISH COLUMBIA
WASHINGTON
PACIFIC
OCEAN
STRAIT OF
JUAN DE FUCA
VANCOUVER ISLAND
BRITISH COLUMBIA
STRAIT OF
GEORGIA
PROJECT LOCATION
CORNET
BAY
SKAGIT BAY
WHIDBEY
ISLAND
FIDALGO
ISLAND
10 FLOAT SECTIONS AND DETAILS
GENERAL NOTES3
ABBREVIATIONS AND LEGEND4
11 PILE SCHEDULE AND DETAILS
BORING LOGS5
BUffOWS lslano
Affan tslano
Moun! Erie Summit Trall q
Fida/go Island
Dewey
Rosarlo Beach
Deception_ Pass State P'1ia,m..---..J
Deception Pass State Park Administration
Offices
F.i algo Bay Aquatic Reserve
Similk Beach
Go le
Snee Oosh
SWINOMlSH
RESERVATION
Museum of~ Northwest An/'r
La Conner
Shelter Bay
Bay View
Whitney
PROJECT TEAM
STATE OF WASHINGTON
PARKS AND RECREATION COMMISSION
1111 ISRAEL ROAD SOUTHWEST
POST OFFICE BOX 42650
OLYMPIA, WASHINGTON 98504-2650
www.parks.wa.gov
WASHINGTON STATE PARKS AND RECREATION COMMISSION
220 N. WALNUT ST.
BURLINGTON, WA 98223
REID PARKER
PROJECT REPRESENTATIVE
TELEPHONE: (360) 480-9753
REID.PARKER@PARKS.WA.GOV
OWNER:
OWNER'S REPRESENTATVE:
PROJECT ENGINEERING CONSULTANT
PROJECT LEAD: MOFFATT & NICHOL
600 UNIVERSITY ST.
SUITE 610
SEATTLE, WA 98101
www.moffattnichol.com
AARON PATTERSON
CIVIL ENGINEER
TELEPHONE: (206) 622-0222
apatterson@moffattnichol.com
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
D200-3718-2023
AP 06/19/2023
DC 06/19/2023
XXX 06/19/2023
XXX 06/19/2023
SHEET 2 OF 11
DECEPTION PASS
STATE PARK
MARINE
MAINTENANCE
VESSEL
FLOAT
REPLACEMENT
PROJECT TEAM
AS SHOWN
moffatt & nichol
GENERAL
1. DESIGN AND CONSTRUCT THE BOARDING FLOAT IN ACCORDANCE WITH THE PERFORMANCE
SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF THIS ELEMENT.
2. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT ALL INCLUSIVE. CONTRACTOR
SHALL VERIFY INFORMATION GIVEN HERE WITH SPECIFICATIONS AND OTHER DOCUMENTS AND
BRING ANY CONFLICTS TO THE ATTENTION OF THE PROJECT ENGINEER BEFORE BEGINNING
AFFECTED WORK. THE PROJECT ENGINEER WILL RESOLVE ANY SUCH CONFLICT(S).
3. IN THE EVENT OF CONFLICTING REQUIREMENTS BETWEEN THE CONTRACT DRAWINGS, GENERAL
NOTES, AND SPECIFICATIONS, THE MORE STRINGENT SHALL CONTROL AS DETERMINED BY THE
PROJECT ENGINEER.
4. ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS ARE TO BE STRICTLY FOLLOWED.
METHODS OF DEMOLITION, CONSTRUCTION, AND ERECTION OF MATERIALS ARE THE
CONTRACTOR’S RESPONSIBILITY.
5. THE CONTRACTOR SHALL REVIEW AND BECOME FAMILIAR WITH THE STATE PARKS-OBTAINED
PERMITS. THE CONTRACTOR SHALL OBTAIN ALL OTHER FEDERAL, STATE, OR LOCAL DEPARTMENT
REQUIRED PERMITS AFFECTED BY THE WORK NOT PREVIOUSLY OBTAINED BY STATE PARKS.
6. THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE, AND LOCAL
ENVIRONMENTAL PROTECTION STANDARDS, PERMITS, LAWS, AND REGULATIONS.
7. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL DEVICES AS NECESSARY TO
PREVENT DEBRIS FROM ENTERING THE WATER, AND AIRBORNE MATERIALS FROM LEAVING THE
IMMEDIATE VICINITY OF THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF
ANY MATERIALS DEPOSITED OUTSIDE AND WITHIN THE WORK AREA.
8. THE CONTRACTOR SHALL DISPOSE OF ALL HAZARDOUS / NON HAZARDOUS AND REGULATED/ NON
REGULATED DEBRIS OFF THE PROJECT SITE IN A PERMITTED LANDFILL.
9. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS FOR COMPATIBILITY BEFORE
PROCEEDING WITH CONSTRUCTION OR MATERIAL PROCUREMENT. ANY DISCREPANCIES IN
DIMENSIONS OR CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT
ENGINEER BEFORE PROCEEDING. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL
THE DISCREPANCY HAS BEEN RESOLVED BY THE PROJECT ENGINEER.
10. LOCATIONS OF EXISTING STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE. THE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING DISCREPANCIES WITH THE PROJECT ENGINEER
BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL REVIEW AND BECOME
FAMILIAR WITH THE RECORD DRAWINGS, AND VERIFY DIMENSIONS IN THE FIELD.
11. CONTRACTOR-INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE PROJECT
ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON
SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT.
12. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING SURFACES OR STRUCTURES
THAT WILL REMAIN.
13. DO NOT SCALE DRAWINGS.
14. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY; DO NOT REUSE WITHOUT PRIOR WRITTEN
APPROVAL FROM MOFFATT & NICHOL.
15. THE DRAWINGS DO NOT INDICATE THE MEANS, METHOD(S), OR SEQUENCE OF CONSTRUCTION, EXCEPT AS MAY BE SPECIFICALLY NOTED. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
SAFETY PROGRAMS, MEANS, METHODS, AND PROCEDURES OF OPERATION FOR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
16. DESIGN IS BASED ON AS-BUILT INFORMATION PROVIDED BY THE OWNER AND LIMITED SITE
OBSERVATIONS. LOCATIONS AND DIMENSIONS SHOWN ARE APPROXIMATE. SURVEYS AND
GEOTECHNICAL REPORT ARE NOT AVAILABLE FOR THE SITE. ALL INFORMATION SHOWN ON
THESE DRAWINGS MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF THE
WORK.
17. ALL WORK TO BE DONE BY BARGE BASED EQUIPMENT. PIER NOT SUITABLE FOR HEAVY
EQUIPMENT.
18. WORK BARGE SPUDS MUST NOT BE DRIVEN INTO EELGRASS ZONES.
CODES AND STANDARDS
ALL WORK SHALL CONFORM TO THE MINIMUM REQUIREMENTS OF THE FOLLOWING CODES AND
STANDARDS. CODES AND STANDARDS SHALL BE THE LATEST EDITION AVAILABLE AS OF THE DATE OF
THE INVITATION TO BID, UNLESS OTHERWISE SPECIFIED.
1. THE INTERNATIONAL BUILDING CODE (IBC), 2021 EDITION.
2. WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION, 2022
3. AMERICAN CONCRETE INSTITUTE (ACI), BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE AND COMMENTARY, ACI 318-14, 2014.
4. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES, 2016 EDITION.
5. AMERICAN WELDING SOCIETY (AWS), STRUCTURAL WELDING CODE - STEEL, AWS D1.1, 2015.
6. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
DESIGN CRITERIA
1. DESIGN LOADS AND REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE CONTRACT
DRAWINGS AND THE TECHNICAL SPECIFICATIONS
2. DEAD LOAD: SELF WEIGHT OF STRUCTURES, INCLUDING APPURTENANCES AND ATTACHMENTS
3. LIVE LOAD:
UNIFORM LIVE LOAD: 40 PSF OVER DECK SURFACE AREA
POINT LOAD: 500 LBS ACTING ON A 4 SQ FT AREA AT ANY POINT ON THE DECK SURFACE BUT
NOT CLOSER THAN 2 FT FROM THE EDGE.
4. WIND LOAD:
DESIGN WIND SPEED: V = 100 MPH
WIND IMPORTANCE FACTOR: I=1.0 (OCCUPANCY CATEGORY II)
EXPOSURE CATEGORY: D
5. ENVIRONMENTAL LOAD: SEE SPECIFICATIONS
6. DESIGN VESSEL:
VESSEL: MV THUNDERBIRD
LOA: 75 FEET - 6- INCHES
BEAM: 20 FEET - 6 INCHES
LOADED DRAFT: 3 FEET
AVERAGE HEIGHT ABOVE WATER: 6.89'
MAXIMUM DESIGN BERTHING VELOCITY: 0.8 FT/SEC PERPENDICULAR TO THE BERTH
PILE DRIVING
1. CONTRACTOR SHALL USE A TEMPLATE OR DRIVING FRAME TO MAINTAIN PROPER ALIGNMENT
OF PILE DURING DRIVING. PILES SHALL BE DRIVEN TO ACHIEVE THE MINIMUM TIP ELEVATIONS
SHOWN ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR SELECTION OF APPROPRIATE
PILE HAMMER TYPE AND SIZE, AS REQUIRED TO ACHIEVE THE PILE TIP DEPTHS WITHOUT
DAMAGING THE PILING, IN COMPLIANCE WITH THE RELEVANT PERMIT AND PROJECT
DOCUMENTS. IF PILE REACHES REFUSAL PRIOR TO ACHIEVING THE SHOWN TIP ELEVATION,
THE CONTRACTOR SHALL IMMEDIATELY SUBMIT PILE DRIVING LOGS TO THE ENGINEER FOR
APPROVAL. DRIVING HAMMERS SHALL BE MAINTAINED IN PROPER ALIGNMENT DURING DRIVING
OPERATIONS BY USE OF LEADS OR GUIDES ATTACHED TO THE HAMMER. PILES DAMAGED
DURING DRIVING SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE.
2. REFER TO THE PROJECT GEOTECHNICAL INFORMATION FOR DRIVING CONDITIONS.
3. ALL PILES SHALL BE FIRST DRIVEN WITH A VIBRATORY HAMMER. IMPACT DRIVING SHALL ONLY
BE PERMITTED FOR PREMATURE REFUSAL. PILES SHALL BE DRIVEN TO THE MINIMUM
EMBEDMENT SHOWN IN THE PILE SCHEDULE. SEE SPECIFICATIONS FOR ADDITIONAL DRIVING
REQUIREMENTS.
4. CONTRACTOR SHALL DETERMINE FINAL PILE LOCATIONS TO CORRESPOND WITH THE
LOCATIONS OF PILE HOOPS ON THE CONTRACTOR DESIGNED FLOATS.
5. THE CONTRACTOR SHALL NOT DEMOBILIZE PILE DRIVING EQUIPMENT PRIOR TO OWNER AND
ENGINEER ACCEPTANCE OF AS-BUILT PILE LOCATIONS AND PLUMBNESS
DECK GRATING
1. DECK GRATING SHALL HAVE A MINIMUM 60-PERCENT OPEN AREA WITH A MINIMUM HEIGHT OF
1-1/2 INCHES AND MANUFACTURED USING VINYLESTER RESIN, PREMIUM GRADE,
FIRE-RETARDANT RESIN, WITH A TEST FLAME SPREAD OF 25 OR LESS WHEN TESTED IN
ACCORDANCE WITH THE ASTM E 84 TUNNEL TEST. RESIN SHALL BE UV STABLE.
2. DECK GRATING SHALL BE FURNISHED WITH TYPE 316 STAINLESS STEEL HOLD DOWN
ATTACHMENTS AND APPURTENANCES.
4. COLOR SHALL BE LIGHT GRAY.
5. SURFACE SHALL HAVE AN INTEGRAL GRIT NON-SKID TOP SURFACE.
STEEL
1. STEEL PIPE PILE SHALL CONFORM TO ASTM A252, GR 3 MOD, MINIMUM YIELD STRENGTH Fy=
50KSI
2. STEEL PIPE PILES SHALL BE HOT-DIPPED GALVANIZED
2. MISCELLANEOUS STEEL SHAPES SHALL CONFORM TO ASTM A36.
3. STEEL PLATE SHALL CONFORM TO ASTM A572, GRADE 50.
4. BOLTS SHALL CONFORM TO ASTM A307.
5. NUTS SHALL BE ASTM A563.
6. WASHERS SHALL BE ASTM F436.
7. STEEL ITEMS SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE WITH THE CONTRACT
SPECIFICATIONS.
STRUCTURAL STEEL
1. STRUCTURAL STEEL DESIGN, FABRICATION, & ERECTION SHALL CONFORM TO REQUIREMENTS
OF AISC MANUAL OF STEEL CONSTRUCTION (LRFD & ASD), LATEST EDITION.
2. ALL STEEL & CONNECTIONS SHALL BE HOT-DIPPED GALVANIZED
3. DISSIMILAR METALS: DISSIMILAR METALS SHALL BE ISOLATED. DISSIMILAR MATERIALS SHALL
NOT BE USED BELOW WATERLINE.
WELDING
1. ALL WELDING SHALL BE PERFORMED BY WELDERS QUALIFIED FOR THE WELD AND POSITION
SHOWN IN ACCORDANCE WITH AWS AND HAVING CURRENT CERTIFICATIONS.
2. ALL WELDS SHALL BE PERFORMED WITH THE PROCEDURES PRE-QUALIFIED OR QUALIFIED IN
ACCORDANCE WITH AWS D1.1.
3. THE WELDS SHOWN ARE FOR THE FINAL CONNECTIONS. FIELD WELD SYMBOLS ARE SHOWN
WHERE FIELD WELDS ARE REQUIRED BY THE STRUCTURAL DESIGN. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING IF A WELD SHOULD BE SHOP OR FIELD WELDED IN ORDER
TO FACILITATE THE STRUCTURAL STEEL ERECTION.
4. COMPLETE AND PARTIAL PENETRATION WELDS AS WELL AS MULTIPLE PASS FILLET WELDS
SHALL BE CONTINUOUSLY MONITORED DURING THE WELDING PROCESS INCLUDING FIT-UP,
ALL OTHER FILLET WELDING REQUIRES ONLY PERIODIC MONITORING. ALL WELDING SHALL BE
100% INSPECTED UPON COMPLETION TO AWS D1.1 CODE. PRIOR TO ANY WELDING TAKING
PLACE THE WELDING INSPECTOR SHALL VERIFY WELDER'S CERTIFICATION AS BEING CURRENT
AND CERTIFIED IN THE CORRECT WELDING PROCESS FOR INTENDED WELDING AND WELDING
INSPECTOR SHALL VERIFY THE WELDING PROCEDURE AS BEING CORRECT FOR WELDING TO BE
PERFORMED. WELDING INSPECTOR SHALL BE AWS QC-1 CERTIFIED.
5. WELDING ELECTRODES SHALL BE 70 KSI STRENGTH AND SHALL BE LOW HYDROGEN
MATERIAL.
6. MINIMUM WELD SIZE 5/16", UON
SURVEY INFORMATION
1. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL POINTS AND DATUMS, TO BE APPROVED BY
THE OWNER. CONTRACTOR SHALL SUBMIT SURVEY CONTROL AND DATUM INFORMATION FOR
REVIEW AND APPROVAL BY THE PARKS AT LEAST 15 BUSINESS DAYS PRIOR TO COMMENCING
WORK.
2. ELEVATION DATA PROVIDED BY AKS ENGINEERING & FORESTRY, LLC. DATED 8/29/2023.
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
D200-3718-2023
AP 02/10/23
RG 02/10/23
XXX 02/10/23
XXX 02/10/23
SHEET 3 OF 11
DECEPTION PASS
STATE PARK
MARINE
MAINTENANCE
VESSEL
FLOAT
REPLACEMENT
GENERAL NOTES
AS SHOWN
DATUMS:
HORIZONTAL DATUM = WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE,
NAD83(91), US SURVEY FEET
VERTICAL DATUM = NAVD88, US SURVEY FEET
TIDAL WATER LEVELS (NAVD88)
EXTREME HIGH WATER +12.94 FT
MEAN HIGHER HIGH WATER + 8.10 FT
MEAN HIGH WATER + 7.31 FT
MEAN LOW WATER + 1.19 FT
NAVD88 + 0.00 FT
MEAN LOWER LOW WATER - 1.28 FT
EXTREME LOW WATER - 5.29 FT (±)
*NOTE: LETTER INDICATES ELEVATION OR SECTION; NUMBER
INDICATES PLAN OR DETAIL. DASH (-) INDICATES SECTION/DETAIL
IS FROM SAME SHEET.
CROSS-REFERENCE LEGEND:ABBREVIATIONS:
' FOOT/FEET
" INCH
∅ DIA
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
℄ CENTERLINE
CJP COMPLETE JOINT PENETRATION
ELEV ELEVATION
EQ EQUAL, EQUALLY
EXIST EXISTING
FT FEET/FOOT
IN. INCH/INCHES
MHHW MEAN HIGHER HIGH WATER
ML MUDLINE
MLLW MEAN LOWER LOW WATER
NAVD NORTH AMERICAN VERTICAL DATUM
No., # NUMBER
OHWM ORDINARY HIGH WATER MARK
SPECS SPECIFICATIONS
SS STAINLESS STEEL
STL STEEL
TYP TYPICAL
w/ WITH
SHEET NOTE CALLOUT
EQUALS "SEE NOTE 1"
SHEET NOTE CALLOUT
2 PART DETAIL CALLOUT
B
VIEW TITLE
VIEW TITLE
ELEV/PLAN/SECTION/DETAIL
LETTER/NUMBER
CALLED FROM SHEET NUMBER
DETAIL NUMBER
SHOWN ON SHEET NUMBER
DETAIL NUMBER
SHOWN ON SHEET NUMBER
2 PART SECTION CALLOUT
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
D200-3718-2023
AP 02/10/23
RG 02/10/23
XXX 02/10/23
XXX 02/10/23
SHEET 4 OF 11
DECEPTION PASS
STATE PARK
MARINE
MAINTENANCE
VESSEL
FLOAT
REPLACEMENT
ABBREVIATIONS
AND LEGEND
AS SHOWN
_.... I f ,.. I .....,__.....,___ - - _ ____.,
- 1 j
\. . I \ - \ I
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
D200-3718-2023
AP 02/10/23
RG 02/10/23
XXX 02/10/23
XXX 02/10/23
SHEET 5 OF 11
DECEPTION PASS
STATE PARK
MARINE
MAINTENANCE
VESSEL
FLOAT
REPLACEMENT
BORING LOGS