EXHIBIT B- Schedule of Unit Rates.pdf

PDF 347 KB Posted

Attached to
Traffic Signals Replacement
Solicitation number
147530
Issued by
Polk County, Florida

About this file

This is a Schedule of Unit Prices document for a Traffic Signals Replacement project issued by the Central Florida Tourism Oversight District in response to Invitation to Bid C007124, dated October 14, 2026. The document establishes unit pricing for potential additions and deletions to the contract work as directed by the owner. The schedule encompasses 63 line items organized across five categories: Maintenance of Traffic (11 items), Erosion Control (10 items), Roadway (9 items), Landscape (2 items), and Traffic Signals (31 items). The project involves the replacement of traffic signal infrastructure, including conduit installation, fiber optic connections, signal controllers, video detection systems, and associated electrical and communications equipment. All unit prices remain fixed for the duration of the contract and apply to both additions and deletions on a net quantity basis multiplied by the applicable unit rate.

The schedule requires bidders to provide hourly wage rates for labor categories (Foreman, Skilled Laborer, and Unskilled Laborer) including both straight-time and overtime rates, as well as hourly, daily, weekly, and monthly rates for contractor-owned equipment. All rates are all-inclusive, covering materials, labor, equipment, permits, taxes, insurance, overhead, and profit. Equipment rental costs for items not listed are to be calculated using current Blue Book rates or actual invoices, whichever is less. The owner retains the right to select Unit Price, Lump Sum, or Time & Material pricing in accordance with the General Conditions of the Contract for Construction. The contract will be awarded to the lowest responsive and responsible bidder, with the owner reserving the right to award to the next lowest bidder or reject all bids if necessary.

View the file

Other files

File Type Posted
SA-06 - Traffic Signal Improvements Design FY26_GeotechReport.pdf PDF
Compliance with FL Statutes Affidavit (1).pdf PDF
SA-07 - Traffic Signal Improvements Design FY26_MastArmCalcs.pdf PDF
Div 2 and 3 CFTOD Specifications - Signal Design. r1.pdf PDF
SA-01 - RCES Underground Construction Rules (REV 7).pdf PDF
Exhibit C - Project - Client Reference Form v.12.25 (1).pdf PDF
SA-03 - District Traffic Equipment Standards - 11-12-2025.pdf PDF
EXHIBIT F-Warranty Offered Form (1).pdf PDF
Affidavit of Eligibility Form - Opportunity Zone Program v.12.25.pdf PDF
CFTOD Erosion Control Notes.pdf PDF
Affidavit of Eligibility Form - Buy Local or Veteran Small Business Program 12.25.pdf PDF
SA-04 - 2026 CFTOD Storm Preparation Procedures for Contractors Revised 2026.04 (1).rtf RTF text file
EXHIBIT A- Scope of Services.pdf PDF
IFB_Traffic Signal Improvements Design FY26 Victory Way Buena Vista Drive.pdf PDF
RCES Lock Out Tag Out.pdf PDF
EXHIBIT E-Emergency Response Form (1).pdf PDF
C007124 - Division 1 - Project Specifications r1.docx DOCX document
EXHIBIT D-Subcontractor List v.12.25 (3).pdf PDF
SA-05 - MA 1-6 Utility Locates - For Reference Only.pdf PDF
ATTACHMENTS 1-6.pdf PDF
Bidder Requirements Checklist v.4SM.pdf PDF
RCES Confined Space.pdf PDF
SA-02 - CFTOD Insurance Requirements REV 02.27.25.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT Exhibit “B” 2027 Traffic Signals Replacement Schedule of Unit Prices Invitation to Bid: C007124 October 14, 2026

EXHIBIT “B”

SCHEDULE OF UNIT PRICES

In accordance with Article 12 of the General Conditions of the Contract for Construction, the following Unit Price Schedule may be used for additions and/or deletions to the Contract Work as the Owner may direct.

1. Unit Price items shall be inclusive of all items of expense, including but not limited to applicable materials (delivered to the Job Site and unloaded), labor (including receiving, handling, scaffolding, distributing, storing, hoisting, installation, clean-up and protection), equipment, drafting services, trucking, permits, appliances, supervision, engineering, taxes, insurance, overhead, profit and bonds.

2. Except where specific exceptions are indicated, it is understood that all equipment and material to be furnished is to be identical with that which is called for in Specifications.

3. The Unit Price indicated for each item hereinafter described shall remain in effect for the duration of the Contract and shall apply to both additions and deletions. Any changes in the Work shall be computed on a net quantity basis multiplied by the Unit Price.

4. For all Directive changes (Unit Price, Lump Sum or Time & Material), rentals for equipment not listed under Attachment “A" shall be based on a prorated portion as to the portion of the month used of the current monthly Blue Book rates; or by actual invoice from the Rental Agency, whichever is less.

5. The Owner reserves the right to choose Unit Price; Lump Sum; or Time & Material pricing in accordance with Article 12 of the GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION.

Item

Description

Unit Unit Cost

MOT

1 Work Zone Sign ED 2 Portable Changeable Message Sign, Temp. ED 3 Arrow Board /Advance Warning Arrow Panel ED 4 Temp. Barricades - Types I,II,DI,VP, Drum, LC ED 5 Temp. Barricades – Type III, 6' ED 6 High Intensity Flash LI, Temp, Type B ED 7 Traffic Control Off-Duty Law Enforcement Officer HR 8 Temporary Signalization and Maintenance, Intersection ED 9 Temporary Traffic Detection and Maintenance, Intersection ED 10 Temporary Fencing with Screening LF 11 MOT Crew & Equipment ED

Erosion Control 12 Sediment Barrier LF 13 Litter Removal AC 14 Mowing AC 15 Silt Fence LF 16 Double Row Silt Fence LF 17 Inlet Protection Device EA 18 Soil Tracking Prevention Trap (Temporary) EA

Invitation to Bid: C007124 October 14, 2026

19 Artificial Coverings / Roll Erosion Control SY 20 Power Broom ED 21 Street Sweeper (With Vacuum Pick-up) ED

Roadway 22 Detectable Warnings SF 23 Clearing & Grubbing AC 24 Removal of Existing Concrete SY 25 Regular Excavation CY 26 Embankment CY 27 Unsuitable Soil Removal and Disposal CY 28 Curb & Gutter Removal LF 29 Type F, Concrete Curb & Gutter LF 30 Type E, Concrete Curb & Gutter LF

Landscape 31 Sod (Bahia) SY 32 Sod (St. Augustine) SY

Traffic Signals 33 2” Conduit, F&I, Open Trench LF 34 2” Conduit, F&I, Directional Bore LF 35 3” Conduit, F&I, Open Trench LF 36 3” Conduit, F&I, Directional Bore LF 37 4” Conduit, F&I, Open Trench LF 38 4” Conduit, F&I, Directional Bore LF 39 Fiber Optic Connection, Install, Splice EA 40 Fiber Optic Connection Hardware, F&I, Splice Tray EA 41 Fiber Optic Connection Hardware, F&I, Preterminated Connector Assembly EA 42 Fiber Optic Connection Hardware, F&I, Patch Panel – Field Terminated EA 43 Pull and Splice Box, F&I, 13” x 24” Cover Size EA 44 Electrical Power Service, F&I, Underground, Meter Purchased by Contractor AS 45 Electrical Power Service, Remove Underground AS 46 Electrical Service Wire, F&I LF 47 Prestressed Concrete Pole, F&I, Type P-11 Service Pole EA 48 Steel Mast Arm Assembly, Remove, Shallow Foundation – Bolt on

Attachment

EA

49 Vehicle Traffic Signal, F&I, Aluminum, 3 Section, 1 Way AS 50 Vehicle Traffic Signal, F&I, Aluminum, 5 Section Cluster, 1 Way AS 51 Vehicle Detection System – Video, F&I Cabinet Equipment EA 52 Vehicle Detection System – Video, F&I Above Ground Equipment EA 53 Signal Priority and Preemption System, F&I, Optical, Detector EA 54 Signal Priority and Preemption System, F&I, GPS, Detector EA 55 Signal Priority and Preemption System, F&I, GPS, Cabinet Electronics EA 56 Traffic Controller Assembly, F&I, NEMA w/ Standard Lock, 2 Preemption AS

Invitation to Bid: C007124 October 14, 2026

57 Traffic Controller Assembly, Remove Controller with Cabinet AS 58 ITS CCTV Camera, Pressurized, IP, High Definition EA 59 Managed Field Ethernet Switch, F&I EA 60 Uninterruptible Power Supply, F&I, Line Interactive with Cabinet EA 61 Remote Power Management Unit – RPMU, F&I EA 62 Sign Panel, F&I, Install Overhead Mount EA 63 Internally Illuminated Sign, F&I, Overhead Mount, 12-18 SF EA

END OF EXHIBIT “B”

ATTACHMENT 'A'

SCHEDULES OF WAGE & EQUIPMENT RATES

Invitation to Bid: C007124 October 14, 2026 of

EXHIBIT 'B'

SCHEDULE OF UNIT PRICES

The following is an integral attachment to the aforementioned Exhibit 'B' Schedule of Unit Prices and, together with the Unit Prices, may be utilized as the basis for adjustments to the Contract Sum for additions to and deletions from the Contract Work, as the Owner may direct, in accordance with Article 12 of the General Conditions of the Contract for Construction. The rates contained in this schedule shall be subject to all restrictions and provisions set forth in Exhibit 'B' Schedule of Unit Prices. All Hourly Rates (labor wages and equipment rates) are inclusive of Contractor’s overhead, profit and cost of all employee burdens, benefits, insurance and Worker’s Compensation coverage. The Contractor shall provide, as supporting data, evidence of the direct cost of labor, Contractor’s overhead, profit and each category of employee burden, benefit and related cost. Overtime rates are applicable to a five-day work week for hours worked in excess of 40 hours per week, excluding weekends and holidays.

A. Hourly Wage Rates:

The Bidder shall list each labor category applicable to the performance of the Contract Work and provide the corresponding wage rates for each in the table below.

Wage rates shall remain in effect through Contract Completion

Labor Category Total Straight Time Wage Rate

Total Overtime Wage Rate

Foreman $__________ $__________ Laborer – Skilled $__________ $__________ Laborer - Unskilled $__________ $__________

Invitation to Bid: C007124 October 14, 2026

B. Contractor-owned Equipment Rates:

The table below lists each type of Contractor-owned equipment to be utilized in the performance of the Work and the hourly, daily, weekly and monthly rate corresponding to each. Each and every listed rate is an all-inclusive rate, which includes but is not necessarily limited to, the cost of purchasing, leasing, maintaining, licensing, transporting and fueling the equipment, the Contractor’s overhead and any profit to be derived by the Contractor from the use of the equipment pursuant to the Agreement, and is not subject to additional markup by the Contractor. Each and every equipment rate shall remain in effect for the duration of the Contract and shall apply for the purpose of calculating changes to the amount of the Contract Sum attributable to both additions to and deletions from the Work (collectively, changes to the Work). Any costs for such equipment that are attributable to changes to the Work shall be computed on a net hourly, daily, weekly or monthly basis, as applicable, multiplied by the corresponding rate. The rates applied in such computations shall be strictly applied in the following manner: the hourly rate shall be applied when the equipment is utilized for less than one (1) eight-hour day; the daily rate shall be applied when the equipment is utilized for more than one (1) but less than five (5) consecutive days; the weekly rate shall be applied when the equipment is utilized for more than five (5) consecutive days but less than four (4) consecutive weeks; and, the monthly rate shall be applied when the equipment is utilized for four (4) or more consecutive weeks, including any net portions thereof, which shall be applied on a prorated basis. The equipment rates set forth below are exclusive of the cost of Labor, if any, that is necessary to operate the equipment. The equipment rates included in the list below do not apply to rented equipment, the costs for which are subject to the corresponding provisions set forth in Article 12 of the General Conditions of the Contract for Construction.

The Bidder shall list each type of Contractor-owned equipment applicable to the performance of the Contract Work and provide the corresponding daily, weekly and monthly rate for each in the table below.

ATTACHMENT 'A' OF EXHIBIT 'B'

EQUIPMENT TYPE

(LIST)

HOURLY

RATE

DAILY

RATE

WEEKLY

RATE

MONTHLY RATE

END OF EXHIBIT “B”

MOT:
1:
Work Zone Sign:
ED:
2:
Portable Changeable Message Sign Temp:
ED_2:
3:
Arrow Board Advance Warning Arrow Panel:
ED_3:
4:
Temp Barricades Types IIIDIVP Drum LC:
ED_4:
5:
Temp Barricades Type III 6:
ED_5:
6:
High Intensity Flash LI Temp Type B:
ED_6:
7:
Traffic Control OffDuty Law Enforcement Officer:
HR:
8:
ED_7:
9:
ED_8:
10:
Temporary Fencing with Screening:
LF:
11:
MOT Crew Equipment:
ED_9:
Erosion Control:
12:
Sediment Barrier:
LF_2:
13:
Litter Removal:
AC:
14:
Mowing:
AC_2:
15:
Silt Fence:
LF_3:
16:
Double Row Silt Fence:
LF_4:
17:
Inlet Protection Device:
EA:
18:
Soil Tracking Prevention Trap Temporary:
EA_2:
19:
Artificial Coverings Roll Erosion Control:
SY:
20:
Power Broom:
ED_10:
21:
Street Sweeper With Vacuum Pickup:
ED_11:
Roadway:
22:
Detectable Warnings:
SF:
23:
Clearing Grubbing:
AC_3:
24:
Removal of Existing Concrete:
SY_2:
25:
Regular Excavation:
CY:
26:
Embankment:
CY_2:
27:
Unsuitable Soil Removal and Disposal:
CY_3:
28:
Curb Gutter Removal:
LF_5:
29:
Type F Concrete Curb Gutter:
LF_6:
30:
Type E Concrete Curb Gutter:
LF_7:
Landscape:
31:
Sod Bahia:
SY_3:
32:
Sod St Augustine:
SY_4:
Traffic Signals:
33:
2 Conduit FI Open Trench:
LF_8:
34:
2 Conduit FI Directional Bore:
LF_9:
35:
3 Conduit FI Open Trench:
LF_10:
36:
3 Conduit FI Directional Bore:
LF_11:
37:
4 Conduit FI Open Trench:
LF_12:
38:
4 Conduit FI Directional Bore:
LF_13:
39:
Fiber Optic Connection Install Splice:
EA_3:
40:
Fiber Optic Connection Hardware FI Splice Tray:
EA_4:
41:
EA_5:
42:
EA_6:
43:
Pull and Splice Box FI 13 x 24 Cover Size:
EA_7:
44:
AS:
45:
Electrical Power Service Remove Underground:
AS_2:
46:
Electrical Service Wire FI:
LF_14:
47:
EA_8:
48:
EA_9:
49:
AS_3:
50:
AS_4:
51:
EA_10:
52:
EA_11:
53:
EA_12:
54:
EA_13:
55:
EA_14:
56:
AS_5:
57:
AS_6:
58:
EA_15:
59:
Managed Field Ethernet Switch FI:
EA_16:
60:
EA_17:
61:
Remote Power Management Unit RPMU FI:
EA_18:
62:
Sign Panel FI Install Overhead Mount:
EA_19:
63:
EA_20:
Labor Category:
Foreman:
undefined:
undefined_2:
Laborer Skilled:
undefined_3:
undefined_4:
undefined_5:
undefined_6:
Laborer UnskilledRow1:
undefined_7:
undefined_8:
Laborer UnskilledRow2:
undefined_9:
undefined_10:
Laborer UnskilledRow3:
undefined_11:
undefined_12:
Laborer UnskilledRow4:
undefined_13:
undefined_14:
Laborer UnskilledRow5:
undefined_15:
undefined_16:
Laborer UnskilledRow6:
undefined_17:
undefined_18:
Laborer UnskilledRow7:
undefined_19:
undefined_20:
Laborer UnskilledRow8:
undefined_21:
undefined_22:
Laborer UnskilledRow9:
undefined_23:
undefined_24:
Laborer UnskilledRow10:
undefined_25:
undefined_26:
Laborer UnskilledRow11:
undefined_27:
undefined_28:
Laborer UnskilledRow12:
undefined_29:
undefined_30:
Laborer UnskilledRow13:
undefined_31:
undefined_32:
Laborer UnskilledRow14:
undefined_33:
undefined_34:
Laborer UnskilledRow15:
undefined_35:
undefined_36:
MONTHLY RATE:
EQUIPMENT TYPE LISTRow1:
undefined_37:
undefined_38:
undefined_39:
fill_82:
EQUIPMENT TYPE LISTRow2:
undefined_40:
undefined_41:
undefined_42:
fill_83:
EQUIPMENT TYPE LISTRow3:
undefined_43:
undefined_44:
undefined_45:
fill_84:
EQUIPMENT TYPE LISTRow4:
undefined_46:
undefined_47:
undefined_48:
fill_85:
EQUIPMENT TYPE LISTRow5:
undefined_49:
undefined_50:
undefined_51:
fill_86:
EQUIPMENT TYPE LISTRow6:
undefined_52:
undefined_53:
undefined_54:
fill_87:
EQUIPMENT TYPE LISTRow7:
undefined_55:
undefined_56:
undefined_57:
fill_88:
EQUIPMENT TYPE LISTRow8:
undefined_58:
undefined_59:
undefined_60:
fill_89:
EQUIPMENT TYPE LISTRow9:
undefined_61:
undefined_62:
undefined_63:
fill_90:
EQUIPMENT TYPE LISTRow10:
undefined_64:
undefined_65:
undefined_66:
fill_91:
EQUIPMENT TYPE LISTRow11:
undefined_67:
undefined_68:
undefined_69:
fill_92:
EQUIPMENT TYPE LISTRow12:
undefined_70:
undefined_71:
undefined_72:
fill_93:
EQUIPMENT TYPE LISTRow13:
undefined_73:
undefined_74:
undefined_75:
fill_94:
EQUIPMENT TYPE LISTRow14:
undefined_76:
undefined_77:
undefined_78:
fill_95:
EQUIPMENT TYPE LISTRow15:
undefined_79:
undefined_80:
undefined_81:
fill_96:
EQUIPMENT TYPE LISTRow16:
undefined_82:
undefined_83:
undefined_84:
1_2:
2_2:
3_2:
4_2:
5_2:
6_2:
7_2:
8_2:
9_2:
10_2:
11_2:
12_2:
13_2:
14_2:
15_2:
16_2:
fill_97:

File details come from the government source that posted it. Updated .