Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-77IF.xls

XLS spreadsheet 38 KB Posted

Attached to
Daytona Beach International Airport Taxiway P3 and P4 Improvements
Solicitation number
26-B-77IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit B) for the County of Volusia, Florida's Invitation for Bid (ITB No. 26-B-77IF, Contract No. C-2077) for construction improvements to Taxiway P3 and P4 at Daytona Beach International Airport. The form requires all bidders to list and identify all proposed subcontractors and their respective scopes of work prior to bid submission. Anticipated subcontractor disciplines include Airfield Electrical, Paving, Earthwork, Demolition, and Surveying, with additional disciplines available in blank rows as needed. Bidders must complete the form by assigning dollar values and percentages of work to the prime contractor and each subcontractor, with the total work allocation equaling 100 percent. The form indicates that failure to complete and return this exhibit may result in a non-responsive bid, and the County reserves the right to seek clarification regarding subcontractors without allowing changes to the total submitted base bid pricing. The form will also be used to determine local preference eligibility in accordance with Section 2.8, D of the solicitation documents.

The Prime/Subcontractor Form requires bidders to distribute the total bid amount across all contractors performing work on the project, with all dollar values and work percentages to be entered in green-shaded cells. The prime contractor is responsible for ensuring that all subcontractors hold appropriate licenses, and any changes to subcontractors during project completion require prior approval from the County Project Manager. The total bid price entered on this form must match the total bid price listed on Exhibit G—Bid Price Sheet. This form serves a dual purpose: it establishes the proposed team structure for project delivery and determines eligibility for local preference considerations in the evaluation of bids.

View the file

Other files

File Type Posted
Exhibit_L_-_Sheet_G100_Reissued_04.13.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS_OF_SHEET_G100.pdf PDF
Exhibit_K_-_Geotechnical_Report.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements_(Addendum_#2_Revision).pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Exhibit_H_-_FAA_Contract_Provision_Guidelines_Issued_3_17_2026_-_REVISED_04.07.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-77IF.xls XLS spreadsheet
Exhibit_J_-_Sales_Tax_Exemption_Procedures_26-B-77IF.pdf PDF
Exhibit_I_-_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-77IF.pdf PDF
Exhibit_H_-_FAA_Requirements_26-B-77IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-77IF.xlsx XLSX spreadsheet
Exhibit_F_-_Construction_Safety_and_Phasing_Plan.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-77IF.pdf PDF
DAB_TW_P3-P4_Plans.pdf PDF
DAB_TW_P3-P4_ProjectManual.pdf PDF
DAB_TW_P3-P4_CSPP.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_.xls XLS spreadsheet
DAB_TW_P3-P4_PriceSheet_(unlocked_for_Inga).xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2077ITB No. 25-B-77IF
EXHIBIT B - PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet 26-B-77IF

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Airfield Electrical$ - 00.00%
Paving$ - 00.00%
Earthwork$ - 00.00%
Demolition$ - 00.00%
Surveying$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .