Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls

XLS spreadsheet 38 KB Posted

Attached to
Inlet Harbor ADA Parking Dune Walkover Beach Access
Solicitation number
26-B-30IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida's Inlet Harbor ADA Parking Dune Walkover Beach Access project, solicitation ITB No. 26-B-30IF, Contract No. C-2064. The form requires bidders to disclose all proposed subcontractors and their respective work scopes, dollar values, and percentage of work performed, with completion mandatory to avoid non-responsive bids. The project involves thirteen line items spanning demolition of an existing 300-linear-foot timber boardwalk and construction of ADA-compliant infrastructure including concrete sidewalks, an ADA parking space with loading zone, timber dune walkover stairs, and an ADA ramp at 4801 S. Atlantic Avenue in Ponce Inlet. The bid deadline is January 6, 2026 at 3:01 p.m., with a non-mandatory pre-bid meeting scheduled for December 16, 2025 and a question submission deadline of December 23, 2025. Substantial completion is required within 120 days of the Notice to Proceed, with final completion within 150 days.

The form identifies anticipated subcontractor disciplines including surveys, demolition, hauling and disposal, excavation, grading and compaction, concrete, carpentry, painting, landscaping, and signage, with bidders required to allocate the total bid price across prime contractor and all subcontractors to equal 100 percent. The estimated contract value is $408,325.00, with bidders required to submit a five percent bid bond and, upon award, a Payment and Performance Bond equal to 100 percent of the contract price. Florida-licensed General or Building Contractors must comply with E-Verify requirements and register with the Florida Department of State Division of Corporations. The project is funded through the Coastal Department and subject to federal regulations including Davis-Bacon Act prevailing wage requirements, Equal Employment Opportunity provisions, and domestic material procurement preferences for FEMA compliance. Contractors must maintain comprehensive insurance coverage with Workers Compensation, Commercial General Liability, and Auto Liability policies naming Volusia County as an additional insured. Liquidated damages are assessed at $500 per day for project delays, and construction is prohibited during marine turtle nesting season from May 1 through October 31.

View the file

Other files

File Type Posted
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access_(Addendum_#3_Revision).pdf PDF
Exhibit_J_-_ECHO_sign_requirements.pdf PDF
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access_(Addendum_#1_Revision).pdf PDF
Inlet_Harbor_ADA_Parking_Dune_Walkover_Beach_Access.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx XLSX spreadsheet
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_F_-_DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Exhibit_I,_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-30IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-30IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-30IF.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_H_-_Sales_Tax_Exemption_Procedure_26-B-30IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-30IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
Technical_Specifications.pdf PDF
Bid_Tabulation.xlsx XLSX spreadsheet
Technical_Specifications.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
Bid_Tabulation.xlsx XLSX spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
Bid_Tabulation.xlsx XLSX spreadsheet
DEP_CCCL_Permit_VO-2485.FO_Secured.pdf PDF
Inlet_Harbor_100%_7.16.25.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(2).xls XLS spreadsheet
Technical_Specifications.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2064ITB No. 26-B-30IF
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Surveys$ - 00.00%
Demolition$ - 00.00%
Hauling & Disposal$ - 00.00%
Excavation Grading and Compaction$ - 00.00%
Concrete$ - 00.00%
Carpentry$ - 00.00%
Painting$ - 00.00%
Landscaping$ - 00.00%
Signage$ - 00.00%
Testing$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%