Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-07IF.xls

XLS spreadsheet 38 KB Posted

Attached to
CDBG-CV Seville Village Improvement Association Historic Gym HVAC Installation
Solicitation number
26-B-07IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida's CDBG-CV Seville Village Improvement Association Historic Gym HVAC Installation project (Contract No. C-2056, ITB No. 26-B-07IF). The form requires bidders to list all proposed subcontractors and their assigned work scope, with anticipated disciplines including HVAC Mechanical, Electrical, Concrete, Masonry, Insulation, Plumbing, Carpentry, and Testing. Bidders must complete all sections in green-shaded cells indicating dollar values and percentage of work for both the prime contractor and each subcontractor, with the total percentages required to equal 100 percent. The form explicitly states that failure to complete and return this form may result in a non-responsive bid. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project completion require prior written approval from the County Project Manager. The County reserves the right to seek clarification on subcontractors but will not permit changes to the total submitted base bid pricing.

This form will be used to determine local preference in accordance with Section 2.8, D of the solicitation. The total bid amount must correspond exactly to the Total Bid Price listed on the Bid Form, inclusive of any performance or payment bonds if applicable. Bidders should note "self-performing" in the subcontractor company name field and submit $0.00 for any discipline the prime contractor intends to perform directly. The form accommodates additional subcontractor disciplines beyond those listed in the anticipated categories through blank rows provided at the bottom of the form.

View the file

Other files

File Type Posted
CDBG-CV_Seville_Village_Improvement_Association_Historic_Gym_HVAC_Installation_(Addendum_#2_Revision).pdf PDF
CDBG-CV_Seville_Village_Improvement_Association_Historic_Gym_HVAC_Installation.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-07IF.pdf PDF
Exhibit_N_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_M_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_L_-_MWBE_Information_&_Form.pdf PDF
Exhibit_K_-WD_Building_FL20230232_9.5.2025.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_Updated_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_H_-_CDBG_Supplemental_Conditions.pdf PDF
Exhibit_G_-_Sales_Tax_Exemption_Procedure_26-B-07IF.pdf PDF
Exhibit_F_-_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-07IF.pdf PDF
Exhibit_E_-_Technical_Specifications_for_the_R.W._Kicklighter_-_Seville_Gym.pdf PDF
Exhibit_D_-_Draft_Contract_26-B-07IF.pdf PDF
Exhibit_C_-_Special_Conditions_26-B-07IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-07IF.xls XLS spreadsheet
R.W._Kicklighter_-_Seville_Gym.pdf PDF
2.1_WH347_Certified_Payroll_Form_Updated_January_2025.pdf PDF
1.0_CDBG_Supplemental_Conditions.pdf PDF
4.0_Section_3_Information_&_Forms.pdf PDF
3.0_MWBE_Information_&_Form.pdf PDF
2.0_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Commodity_and_Service_Solicitation_Request_Form_Seville_Gym.docx DOCX document
5.0_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Special_Conditions.docx DOCX document
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
2.2_WD_Building_FL20230232_9.5.2025.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2056ITB No. 26-B-07IF
PRIME/SUBCONTRACTOR FORM - 26-B-07IF
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form.

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
HVAC Mechanical$ - 00.00%
Electrical$ - 00.00%
Concrete$ - 00.00%
Masonry$ - 00.00%
Insulation$ - 00.00%
Plumbing$ - 00.00%
Carpentry$ - 00.00%
Testing$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .