This is a Mechanical Schedule document (Exhibit B) prepared by Stantec for the California Department of Education's California School for the Deaf chiller replacement project located at 39350 Gallaudet Drive, Fremont, California. The project involves the installation of two centrifugal water-cooled chillers (Daikin WMC060DDSEA units), each with a capacity of 300 tons and utilizing R513A refrigerant. The scope includes associated mechanical equipment: two 50-horsepower chilled water pump units (Armstrong 4030-4x3x8-2P-50HP), an HVAC expansion tank (Bell & Gossett B-800), an air separator (Bell & Gossett RL-8F), a chemical pot feeder (Wessels CPFT-5), and four variable frequency drives (ABB ACH580-PCR-065A-4) with redundant N+1 electronic VFD configuration for the pump units. The document reflects multiple revision dates from December 31, 2024, through August 25, 2025, indicating design development and design-standards agency backcheck submissions.
The specification requires owner-furnished, contractor-installed chillers that meet 2022 California Title 24 Section 110.2(a) efficiency requirements with Path B adjusted maximum full load ratings. Equipment must be mounted on existing concrete pads with 12-month manufacturer warranties from installation or 18 months from shipment (whichever comes first). Critical specifications include dual VFDs with active harmonic distortion filters, hot gas bypass capability, marine water boxes with hinged covers, corrosion protection on wetted surfaces, and a refrigerant monitoring system with 3,500 CFM exhaust fan integration. The installing contractor is responsible for commissioning, seismic attachment calculations, refrigerant relief piping, refrigerant monitoring system, and self-contained breathing apparatus (SCBA) provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_3_-_COST_WORK_(CHILLERS)_.xlsx | XLSX spreadsheet | |
| Exhibit_A_-Technical_Specifications.docx | DOCX document | |
| ATTACHMENT_4_NARRATIVE_RESP_(CHILLERS).pdf | ||
| Agreement_Cover_Letter.pdf | ||
| CHILLERS_(FINAL).docx | DOCX document | |
| ATTACHMENT_2_ADMIN_(CHILLERS).docx | DOCX document | |
| ATTACHMENT_1_SOW_(CHILLERS)_(1).docx | DOCX document | |
| ATTACHMENT_5_-_WORK_AUTH_(CHILLERS).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project
Supervisor Designed Drawn
DSA App No.
Sheet Title
Project Number
Sheet Scale
Sheet Number
A x
C o p y ri g h t
C a lif o rn ia D e p a rt m e n t o f
G e n e ra l S e rv ic e s
R e a l E s ta te S e rv ic e s D iv is io n
BCDEFGHIJKLMNO
ABCDEFGHIJKLMNO
SFM Permit No.
RELATIVE BORDER SCALE IN INCHES
0 1 2 3
300 Montgomery Street Suite
San Francisco, CA 94104-1914 Phone. (415) 882-9500
Website: stantec.com
01-122140
1 04/02/2025 BID SET
12/31/2024 BID SET
Issue
No. Date Description
2 06/06/2025 CHILLER RE-BID
08/04/2025 DSA BACKCHECK
08/25/2025 DSA BACKCHECK #2
/5
/2
:1 :3
A
M A u to d e s k D o c s:
D
G S
_C D
E _F re m o n t_ C h ill e r_
R p l/ s tn m e c h
.r vt
M002
MK VP VP
MECHANICAL SCHEDULES
2045324901
CALIFORNIA SCHOOL
FOR THE DEAF CHILLER
REPLACEMENT
39350 GALLAUDET DRIVE, FREMONT, CA, 94538
CA DEPT OF EDUCATION
NOTES:
1. PROVIDE SINGLE ELECTRICAL CONNECTION.
2. PROVIDE DUAL VFD'S WITH ACTIVE HARMONIC DISTORTION FILTERS
3. OWNER FURNISHED, CONTRACTOR INSTALLED. THE FOLLOWING WORK WILL BE PROVIDED BY THE INSTALLING CONTRACTOR: COMMISSIONING, SEISMIC CALCULATIONS FOR ATTACHMENT TO THE CONCRETE PAD, REFRIGERANT RELIEF PIPING, REFRIGERANT MONITORING SYSTEM AND SCBA.
4. MOUNT ON EXISTING CONCRETE PAD
5. 65 KAIC SCCR
6. CHILLER TO MEET PATH B EFFICIENCIES REQUIRED BY 2022 CALIFORNIA TITLE 24 SECTION 110.2.a. EXCEPTION 1 FOR ADJUSTED MAXIMUM FULL LOAD KW/TON AND NPLV RATINGS.
7. PROVIDE WITH HOT GAS BYPASS
8. PROVIDE MARINE WATER BOX WITH HINGED COVER ON EVAPORATOR AND CONDENSER.
9. PROVIDE CORROSION PROTECTION ON WETTED SURFACES.
10. PROVIDE MANUFACTURER WARRANTY FOR PERIOD OF 12 MONTHS FROM DATE OF INSTALLATION OR 18 MONTHS FROM DATE OF SHIPMENT, WHICHEVER COMES FIRST.
11. CHILLERS WILL BE OWNER FURNISHED AND CONTRACTOR INSTALLED.
CH 2 300 0.465 0.325 R513A 1,197 WATER 513.0 58.0 44.0 5.2 0.0001 2 WATER 820.4 75.0 85.0 12.7 0.00025 460 3 227.0 300 13,900 94.5 55.2 177.7 1/S202 DAIKIN WMC060DDSEA ALL
CH 1 300 0.465 0.325 R513A 1,197 WATER 513.0 58.0 44.0 5.2 0.0001 2 WATER 820.4 75.0 85.0 12.7 0.00025 460 3 227.0 300 13,900 94.5 55.2 177.7 1/S202 DAIKIN WMC060DDSEA ALL
HEIGHT
(IN)
WIDTH
(IN)
LENGTH
(IN)
MARK NUMBER
UNIT
CAPACITY
(TONS)
kW/TON NPLV
REFRIG
TYPE
REFRIG
CHARGE
(LBS)
FLUID
TYPE
FLOW
(GPM)
EWT
(F)
LWT
(F)
MAX WPD
(FT)
FOULING
FACTOR
NO OF COMP
FLUID
TYPE
FLOW
(GPM)
EWT
(F)
LWT
(F)
MAX WPD
(FT)
FOULING
FACTOR
VOLTS PHASE MCA MOP
OPERATING
WEIGHT
(LBS)
DIMENSIONS
UNIT IDENTIFICATION CAPACITY AND PERFORMANCE CHILLED WATER CONDENSER WATER ELECTRICAL PHYSICAL CHARACTERISTICS MOUNTING
DETAIL
DRAWING
REFERENCE
MANUFACTURER MODEL NUMBER NOTES
WATER COOLED CHILLER SCHEDULE
NOTES:
1. PIPE INSULATION THICKNESS BASED ON 2022 CEC.
MECHANICAL ROOM X X X 1 X X ALL
CHILLED WATER 2-1/2 AND LARGER 8 4 44-56 125 200 125 2.5
EXPOSED X X X 1 X X ALL
M A
X V
E
LO
C
IT
Y (F
P S
M A
X F
R
IC
T
IO
N (F
T /1
O P
E R
A T
IN
G
T E
M P
(F
M
IN
W O
R K
IN
G
P R
E S
S U
R E
(P S
IG
M
IN
T E
M P
R A
T
IN
G (F
T E
S T
P R
E S
S U
R E
(P S
IG
T E
S D
U R
A T
IO
N
H
R S
C O
P P
E R
T Y
P E
K
C O
P P
E R
T Y
P E
L
S C
H
S
T E
E L
S C
H
S
T E
E L
S C
H
T
Y P
E
S
T A
IN
LE
S S
S T
E E
L
S C
H
T
Y P
E
S
T A
IN
LE
S S
S T
E E
L
H D
P E
P E
X -A
S O
LD
E
R E
D
B R
A Z
E D
T H
R E
A T
E D
W E
LD
E
D
P R
E S
S U
R E
F
IT
T
IN
G S
G R
O O
V E
D
M
IN
E R
A L
F
IB
E R
P
R E
F O
R M
E D
F
LE
X
IB
LE
E
LA
S
T O
M E
R
IC
T H
IC
K
N E
S S
IN
A S
J
A S
J- S
S
F S
K
V
IN
Y L
P V
C
A
LL
A
LU
M
IN
U M
S T
A
IN
LE
S
S S
T E
E L
SYSTEM PIPE SIZE (IN)
DESIGN CONSTRUCTION
LOCATION
MATERIAL JOINTS INSULATION FACTORY JACKET FIELD JACKET
NOTES
PIPING SYSTEM APPLICATION SCHEDULE
NOTES:
1. CONNECT EXISTING EXHAUST FAN TO NEW REFRIGERANT MONITORING SYSTEM, AND TO THE EXISITNG BMS.
2. FAN TO OPERATE AT MINIMUM AIRFLOW AND CHANGE TO MAX AIRFLOW UPON REFRIGERANT LEAK DETECTION.
(E)EF 1 CHILLER ROOM 3,500 700 1.00 1.2 1-1/2 460 3 ALL
MARK NUMBER
UNIT/AREA
SERVED
BHP HP VOLTS PHASE
UNIT IDENTIFICATION
MAX
AIRFLOW
(CFM)
MIN
AIRFLOW
(CFM)
ESP
(IN-WG)
FAN MOTOR ELECTRICAL
NOTES
EXISTING FAN SCHEDULE
NOTES:
1. PROVIDE WITH VFD AND REDUNDANT N+1 ELECTRONIC VFD.
2. PROVIDE WITH SUCTION DIFFUSER, ARMSTRONG SG-64
3. MOUNT ON EXISTING CONCRETE PAD
CHWP 2 CH-2 BASE-MOUNTED END SUCTION WATER 44 514 207 75 100 33.5 50 3,500 460 3 1000 4/S202 ARMSTRONG 4030-4x3x8-2P-50HP ALL
CHWP 1 CH-1 BASE-MOUNTED END SUCTION WATER 44 514 207 75 100 33.5 50 3,500 460 3 1000 4/S202 ARMSTRONG 4030-4x3x8-2P-50HP ALL
MARK NUMBER
SYSTEM
SERVED
FLUID TYPE
FLUID
TEMP
(F)
FLOW
(GPM)
PUMP
HEAD
(FT)
MIN
EFFICIENCY
BHP HP
SPEED
(RPM)
VOLTS PHASE
UNIT IDENTIFICATION
PUMP TYPE
PERFORMANCE
PUMP MIN
FLOW (GPM)
PUMP MOTOR ELECTRICAL
OPERATING
WEIGHT
(LBS.)
MOUNTING
DETAIL
DRAWING
REFERENCE
MANUFACTURER MODEL NUMBER NOTES
CHILLED WATER PUMP SCHEDULE
NOTES:
1. MOUNT TO EXISTING CONCRETE PAD.
2. NEW EXPANSION TANK PRE-CHARGED PRESSURE TO MATCH EXISTING EXPANSION TANK PRE-CHARGED PRESSURE.
ET 1 CHILLED WATER BLADDER YES 211 211 32 76 2,500 2/S202 BELL & GOSSETT B-800 ALL
MARK NUMBER
SYSTEM
SERVED
TYPE
ASME
CONSTRUCTION
TANK VOLUME
(GAL)
ACCEPTANCE
VOLUME
(GAL)
DIAMETER
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)
UNIT IDENTIFICATION TANK
MOUNTING
DETAIL
DRAWING
REFERENCE
MANUFACTURER MODEL NUMBER NOTES
HVAC EXPANSION TANK SCHEDULE
NOTES:
1. CONNECT TO EXISTING CHILLED WATER SYSTEM. PROVIDE NEW PIPING CONNECTIONS AND VALVES AS REQUIRED.
AS 1 CHILLED WATER CENTRIFUGAL 8 24 54 1,200 1,900.0 2.0 3/S202 BELL & GOSSETT RL-8F ALL
MARK NUMBER
SYSTEM
SERVED
UNIT IDENTIFICATION
TYPE
CONNECTION
SIZE
(IN)
DIAMETER
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)
FLOW
(GPM)
MAX WPD
(FT)
MOUNTING
DETAIL DRAWING
REFERENCE
MANUFACTURER MODEL NUMBER NOTES
AIR SEPARATOR SCHEDULE
NOTES:
1. CONNECT TO EXISTING CHILLED WATER SYSTEM. PROVIDE NEW PIPING CONNECTIONS AND VALVES AS REQUIRED.
CPF 1 CHILLED WATER 5 23 10 75 6/S202 WESSELS CPFT-5 ALL
MARK NUMBER
SYSTEM
SERVED
HEIGHT
(IN)
DIAMETER
(IN)
UNIT IDENTIFICATION
TANK
VOLUME
(GAL)
DIMENSIONS
WEIGHT
(LBS)
MOUNTING
DETAIL
DRAWING
REFERENCE
MANUFACTURER MODEL NUMBER NOTES
CHEMICAL POT FEEDER SCHEDULE
NOTES:
1. PROVIDE VFD AND SHAFT GROUNDING RING FOR LOAD INDICATED.
2. VFD TO BE MOUNTED TO EXISTING UNISTRUTS.
VFD 2B CHILLER ROOM CHWP-2 (REDUNDANT VFD) 50 65 460-3 40.6 8.4 14.3 60 5/S202 ABB ACH580-PCR-065A-4 ALL
VFD 2A CHILLER ROOM CHWP-2 50 65 460-3 40.6 8.4 14.3 60 5/S202 ABB ACH580-PCR-065A-4 ALL
VFD 1B CHILLER ROOM CHWP-1 (REDUNDANT VFD) 50 65 460-3 40.6 8.4 14.3 60 5/S202 ABB ACH580-PCR-065A-4 ALL
VFD 1A CHILLER ROOM CHWP-1 50 65 460-3 40.6 8.4 14.3 60 5/S202 ABB ACH580-PCR-065A-4 ALL
MARK NUMBER LOCATION UNIT SERVED
UNIT IDENTIFICATION
MOTOR HP FLA (A) VOLT-PHASE HEIGHT (IN) WIDTH (IN) DEPTH (IN)
OPERATING
WEIGHT
(LBS.)
MOUNTING
DETAIL
DRAWING
REFERENCE
MAKE MODEL NOTES
VARIABLE FREQUENCY DRIVE SCHEDULE
Signed 9/11/2025
Mechanical Schedules IFB 7760-0000038082 Centrifugal Water Chillers Exhibit B