About this file
This Scope of Work document pertains to a procurement by the California Department of General Services (DGS) Real Estate Services Division (RESD) on behalf of the California Department of Education for the delivery of Daikin Centrifugal Water Chillers to Fremont School for the Deaf in Fremont, California. The contractor is responsible for providing specific Daikin-manufactured chiller models (WMC060DDSEA/E3012-KB2CR2V/C2612-GB2CL2V) that meet defined technical specifications, along with start-up services, demonstration services, and training services. The chillers must be delivered between April 1, 2026, and July 1, 2026, with delivery to be completed within ninety calendar days after receipt of purchase order, though extensions may be granted through a Work Authorization Form. The contractor is not responsible for installation but must provide all permits required for assembly and delivery. At delivery, the contractor must furnish operator and instruction manuals, service manuals, electronics equipment manuals, product data, shop drawings, manufacturer's certificates, test reports, and operation and maintenance materials in both hard copy and PDF formats.
The contractor will retain a ten percent payment withhold upon delivery and acceptance of the chillers, with the remaining balance due upon invoice submission following delivery. The full ten percent withhold is released upon completion of the contractor's tasks. The state's designated contract administrator is Randi Chegwidden, Project Director, and the contractor must establish contact one week prior to shipping to arrange delivery at the building's loading dock. Work must be performed during normal state business hours (Monday through Friday, 8:00 a.m. to 5:00 p.m. Pacific Time) excluding state holidays, unless written approval for alternative hours is obtained in advance. The DGS Project Director will inspect the chillers at delivery, and the Construction Inspection and Management Branch will oversee installation. Any deviations from specified requirements must be corrected by the contractor at no expense to DGS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_3_-_COST_WORK_(CHILLERS)_.xlsx | XLSX spreadsheet | |
| Exhibit_A_-Technical_Specifications.docx | DOCX document | |
| ATTACHMENT_4_NARRATIVE_RESP_(CHILLERS).pdf | ||
| Agreement_Cover_Letter.pdf | ||
| CHILLERS_(FINAL).docx | DOCX document | |
| ATTACHMENT_2_ADMIN_(CHILLERS).docx | DOCX document | |
| ATTACHMENT_5_-_WORK_AUTH_(CHILLERS).pdf | ||
| Exhibit_B_-_Mechanical_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Management Division (Insert) Building, (Insert) 2016 (Insert CN); Exhibit A; Page 1 of 9
IFB 7760-0000038082
Centrifugal Water Chillers Attachment I
SCOPE OF WORK
The State of California (State), Department of General Services (DGS) manages, maintains and operates state buildings and grounds statewide, pursuant to Government Code Section 14685 (a), which authorizes DGS to establish rules and regulations for the government and maintenance of state buildings and grounds. Real Estate Services Division (RESD) is procuring Centrifugal Water Chillers for a state-owned property on behalf of the California Department of Education as part of a Public Works project.
1. PROJECT SUMMARY
A. The Contractor shall provide:
1) Daikin Manufactured Chillers model WMC060DDSEA/E3012-KB2CR2V/C2612-GB2CL2V (hereafter referred to as “Chillers”) meeting the requirements as defined in Exhibit A, Technical Specifications, and Exhibit B, Mechanical Schedules.
2) Start-Up Services as described in Exhibit A, Technical Specifications.
3) Demonstration and Training Services as described in Exhibit A, Technical Specifications.
NOTE: Contractor is responsible for all permits required for assembling and delivery of Chillers but is not responsible for installation.
B. Contractor shall deliver Chillers no earlier than April 1, 2026, and no later than July 1, 2026.
C. The Chillers will be delivered and must be offloaded at the address below:
California Department of Education Fremont School for the Deaf 39350 Gallaudet Drive Fremont, CA 94538
2. PROJECT REPRESENTATIVES
A. The Contract Representatives during the term of this Agreement will be:
| Representatives |
| RESD Contract |
Administrator Contractor’s Contract Administrator
| Name and Title: |
| Randi Chegwidden, Project Director |
| TBD |
| Address: |
| 707 3rd Street |
| City, State, Zip: |
| West Sacramento, CA 95605 |
| Phone Number: |
| 279-240-6605 (desk) 916-693-3903 (cell) |
| E-mail Address: |
| randi.chegwidden@dgs.ca.gov |
B. The State reserves the right to identify an RESD Designated Representative in the absence of the RESD Contract Administrator.
C. Any changes in Contractor’s Contract Administrator must be immediately reported in writing to the RESD Contract Administrator or RESD Designated Representative.
3. SERVICE DETAILS
A. Work Days, Hours and State Holidays
The State's normal business hours are: Monday through Friday, 8:00 a.m. to 5:00 p.m. (PT), excluding observed State holidays. All scheduled services under this Agreement shall be completed within normal business hours (unless approved in writing and in advance by the RESD Contract Administrator or RESD Designated Representative). Any unapproved hours of work will be considered performed at Contractor's own expense.
B. After the Agreement has been approved, Contractor shall confer with the RESD Contract Administrator or RESD Designated Representative in a start-up meeting.
4. WORK DETAILS
A. Delivery Instructions
Contractor shall deliver chillers as identified in Exhibit A, Technical Specifications.
Delivery is to be completed in full within ninety (90) calendar days After Receipt of Purchase Order (ARO). Delivery time can be extended via a Work Authorization Form if both, the State and Contractor agree.
Note: In accordance with paragraph 15.12 of the General Provisions entitled “Delivery”, the Contractor shall strictly adhere to the delivery terms and completion schedule as specified in this solicitation. Failure to comply with the delivery requirements, as stated, may be considered a breach of contract and subject the Contractor to General Provisions 11.4, entitled “Rights and Remedies of the State for Default”.
One (1) week prior to shipping the Chillers, Contractor will contact RESD to make delivery arrangements with one of the following staff:
| Project Director |
| Randi Chegwidden |
916-693-3903 (cell) 279-240-6605 (desk), randi.chegwidden@dgs.ca.gov
| Project Director |
| Marvin Talusik |
916-282-8251 marvin.talusik@dgs.ca.gov, If the Contractor requires additional delivery time, they will submit a Work Authorization Form, (Attachment 5) to the RESD Contract Administrator. The approved Work Authorization Form will thereby be incorporated to the contract. A Purchase Order Change or Amendment will not be required.
At the time of Chiller delivery, Contractor shall provide one (1) hard copy and one (1) PDF copy of each of the following:
· Complete operator/instruction manual.
· Service manual specific to the Chiller.
· Operator/instruction manual for each piece of electronics equipment provided.
· The following items as described in Exhibit A, Technical Specifications:
· Product Data
· Shop Drawings
· Manufacturer’s Certificate
· Test Reports
· Manufacturer’s Instructions
· Operation and Maintenance Materials
B. Inspection and Acceptance
1) DGS Project Director will inspect Chillers at the time of delivery
2) Completion of inspection or acceptance by the DGS Project Director/DGS shall in no way release the Contractor from satisfying the requirements of the contract, specifications, and warranty.
3) The Construction Inspection and Management Branch (CIMB) will be reviewing installation.
4) The Contractor shall correct deviations from the specified requirements that are reported by the RESD Contract Administrator in an expeditious manner at no expense to DGS.
C. Start-Up Services
RESD Contract Administrator or RESD Designated Representative, will contact the Contractor and schedule the Start-Up Services identified in Exhibit A, Technical Specifications.
D. Demonstration and Training Services
RESD Contract Administrator or RESD Designated Representative will contact the Contractor and schedule the Demonstration and Training Services identified in Exhibit A, Technical Specifications.
The familiarization training shall cover but not limited to the following subjects.
· Operating instructions, warnings, precautions & safety checks
· Equipment controls & instrumentation, where they are located, what they do and how they work
· Engine operation, including start- up and shut-down procedures
· Proper operation of the steering system, including maneuvering, forward/reverse operation & stopping
· Basic implement operation & limitations
· Machine capacity, stability and operating limitations
· Preventative and routine inspection & maintenance
· Warranty details and procedures
5. OTHER PROVISIONS:
A. Payment Withold
1) Upon delivery and acceptance of the Chillers the Contractor may submit to DGS an invoice for the total cost of the chillers, less than ten percent (10%) withhold.
2) Upon completion of their tasks the Contractor may invoice DGS for the ten percent (10%) withhold.
B. Parking
The State does not provide parking, however, off-loading of equipment and materials may be performed at the building’s loading dock if permission is obtained in advance from the RESD Contract Administrator or RESD Designated Representative and sufficient space is available.