Exhibit_B_GUTTER_REPAIR_PRICE_SCHEDULE.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Rain Gutters Purchase, Maintenance, and Installation Services
Solicitation number
24250036B-TL
Issued by
Florida

About this file

Exhibit B is a Price Schedule for Rain Gutters Purchase, Maintenance, and Installation Services issued by Seminole County Public Schools in Florida. The document details a comprehensive pricing framework for gutter-related services, including repair, preventative maintenance, cleaning, and installation services for 7" and 9" aluminum box gutters. The price schedule covers multiple service categories such as normal and after-business-hours repair costs, gutter cleaning, covered walkway services, and gutter replacement, with specific line items for materials, labor, mobilization, and various gutter components like miters, downspouts, endcaps, and leaf guards.

The pricing schedule provides a detailed breakdown of costs per linear foot, per square foot, and per item, with line items for installation and repair hourly rates during normal and after-business hours. Additional pricing provisions include a percentage markup for other materials (based on manufacturer's list price), equipment rental, subcontractor markups, and preparatory painting services. The document is structured to allow potential contractors to provide comprehensive pricing for a wide range of gutter-related services, enabling Seminole County Public Schools to have a clear understanding of potential costs for maintenance, repair, and installation projects across their facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Price Schedule
ITEM #GUTTER STYLEGUTTER REPAIR SERVICES PRICING
1NORMAL BUSINESS HOURS REPAIR COST (PER PERSON)PER HOUR$
2AFTER BUSINESS HOURS REPAIR COST (PER PERSON)PER HOUR$
GUTTER PREVENTATIVE MAINTENANCE (PM) SERVICES PRICING
3GUTTER CLEANING AND PM SERVICES - INCLUDES DOWNSPOUTPER LF$
COVERED WALKWAY (PM) SERVICES PRICING
4COVERED WALKWAY CLEANING AND PM SERVICES - INCLUDES DOWNSPOUTPER SF$
GUTTER REPLACEMENT AND INSTALLATION PRICING
5MOBILIZATION - ONLY FOR INSTALLATION PROJECTS AND ONE PER PROJECTEACH$
7" GUTTER
67" ALUMINUM BOX GUTTER7” BOX GUTTER MATERIAL ONLY TO INCLUDE ALL ASSOCIATED ITEMS (HARDWARE, FASTENERS) (Materials Only)PER LF$
77" ALUMINUM BOX GUTTER7” BOX GUTTER REMOVAL & DISPOSAL TO INCLUDE ALL ASSOCIATED ITEMS (HARDWARE, FASTENERS)PER LF$
87" ALUMINUM BOX GUTTER7" BOX MITER - INSIDE (Materials Only)EACH$
97" ALUMINUM BOX GUTTER7" BOX MITER - OUTSIDE (Materials Only)EACH$
107" ALUMINUM BOX GUTTERDOWNSPOUT (Materials Only)PER LF$
117" ALUMINUM BOX GUTTERENDCAP (Materials Only)EACH$
127" ALUMINUM BOX GUTTER90° DOWNSPOUT BEND (Materials Only)EACH$
137" ALUMINUM BOX GUTTERDOWNSPOUT OUTLETS (Materials Only)EACH$
147" ALUMINUM BOX GUTTEROFFSET DOWNSPOUT BEND (Materials Only)EACH$
157" ALUMINUM BOX GUTTERCORNER PIECE (Materials Only)EACH$
167" ALUMINUM BOX GUTTERGUTTER LEAF AND DEBRIS GUARD (Materials Only)PER LF$
177" ALUMINUM BOX GUTTERSPLASH BLOCK MATERIAL (Materials Only)EACH$
9" GUTTER
189" ALUMINUM BOX GUTTER9” BOX GUTTER MATERIAL ONLY TO INCLUDE ALL ASSOCIATED ITEMS (HARDWARE, FASTENERS) (Materials Only)PER LF$
199" ALUMINUM BOX GUTTER9” BOX GUTTER REMOVAL & DISPOSAL TO INCLUDE ALL ASSOCIATED ITEMS (HARDWARE, FASTENERS)PER LF$
209" ALUMINUM BOX GUTTER9" BOX MITER - INSIDE (Materials Only)EACH$
219" ALUMINUM BOX GUTTER9" BOX MITER - OUTSIDE (Materials Only)EACH$
229" ALUMINUM BOX GUTTERDOWNSPOUT (Materials Only)PER LF$
239" ALUMINUM BOX GUTTERENDCAP (Materials Only)EACH$
249" ALUMINUM BOX GUTTER90° DOWNSPOUT BEND (Materials Only)EACH$
259" ALUMINUM BOX GUTTERDOWNSPOUT OUTLETS (Materials Only)EACH$
269" ALUMINUM BOX GUTTEROFFSET DOWNSPOUT BEND (Materials Only)EACH$
279" ALUMINUM BOX GUTTERCORNER PIECE (Materials Only)EACH$
289" ALUMINUM BOX GUTTERGUTTER LEAF AND DEBRIS GUARD (Materials Only)PER LF$
299" ALUMINUM BOX GUTTERSPLASH BLOCK MATERIAL (Materials Only)EACH$
30NORMAL BUSINESS HOURS INSTALLATION COST (PER PERSON)PER HOUR$
31AFTER BUSINESS HOURS INSTALLATION COST (PER PERSON)PER HOUR$
OTHER
32ANY OTHER MATERIAL PERCENT OFF OF MANUFACTURER'S LIST PRICEPERCENT%
33EQUIPMENT RENTAL - COST PLUSPERCENT%
34SUBCONTRACTOR MARKUP COST PLUSPERCENT%
35PREP, PRIME AND PAINT FOR DAMAGED/EXPOSED AREAS UP TO 12" WIDEPER LF$
Company Name: ___________________________________________________________________
Name (Printed): ___________________________________________________________________
Signature: _________________________________________________ Date: _________________

File details come from the government source that posted it. Updated .