Exhibit B - Fee Proposal
118 KB Posted
- Attached to
- RFP Â INSPECTIONS & MATERIAL TESTING - 020822
- Solicitation number
- Not on record
- Issued by
- Fulton County, Georgia
About this file
This is a Fee Proposal Exhibit document submitted by a proposer to the City of College Park, Georgia for special inspections and materials testing services related to the Rhodes Street Widening & Improvements project. The proposal outlines hourly rates for various personnel classifications including Engineering Technicians (ACI), ICC Special Inspectors (Reinforced Concrete), CWI Structural Steel Special Inspectors, ASNT Level II and III inspectors, clerical staff, and engineering/project management personnel. The document also establishes unit rates for laboratory testing services and equipment, including NPDES reporting and inspections, soil testing (Standard and Modified Proctor, Atterberg Limits, grain-size analysis), concrete cylinder compressive strength tests, asphalt coring and extraction services, and vehicle charges for trips and mileage. The proposal solicitation was issued by the City of College Park with a submission deadline of Tuesday, February 8, 2022 at 10:30 a.m. (EST) at the City of College Park Purchasing Department.
The fee proposal is structured as a lump-sum bid with six distinct cost categories: Earthwork Observation and Testing, Foundation Observation and Testing, Concrete Construction, Pavement/Sidewalks/Miscellaneous Site Work, Engineering/Reporting/Supervision/Meetings, and Monthly Pay Application Verification. All pricing fields in the submitted document are blank (showing $0 values), indicating this is a blank template form awaiting completion by the proposer. The proposal accommodates both fixed hourly rates for personnel and additional services requested by the owner, as well as specific testing unit rates. The document structure allows proposers to itemize quantities, apply unit rates, calculate unit costs, and provide subtotals for each work category leading to a grand total lump-sum proposal amount.
Text of this file
Fee Proposal Exhibit B Special Inspections / Materials Testing Fee Proposal Rhodes Street Widening & Improvements
| Proposers Name: |
| Submission Date: |
| PERSONNEL HOURLY RATES (For Proposed Lump Sum Fee Calculation and Additional Services if Requested by The Owner) | |
| PERSONNEL | HOURLY RATE |
| Engineering Technician (ACI) | $ - 0 |
| ICC Special Inspector (Re-Concrete) | $ - 0 |
| CWI, Structural Steel Special Inspector | $ - 0 |
| ASNT Level II | $ - 0 |
| ASNT Level III | $ - 0 |
| Clerical Services | $ - 0 |
| Staff/Project Engineer | $ - 0 |
| Senior Project Manager | $ - 0 |
| Senior Engineer/Consultant | $ - 0 |
| Other | $ - 0 |
| Other | $ - 0 |
| Other | $ - 0 |
| LABORATORY TESTING SERVICES / EQUIPMENT | |||||
| TEST / EQUIPMENT TYPE | UNIT | RATE | |||
| NPDES Weekly Reporting | Weekly Rate | $ - 0 | |||
| NPDES Post-Rain Inspections, Sampling/Analysis | Per Each | $ - 0 | |||
| Standard Proctor (soil) | Per Each | $ - 0 | |||
| Modified Proctor (granular materials) | Per Each | $ - 0 | |||
| Atterberg Limits | Per Each | $ - 0 | |||
| Grainsize Analysis | Per Each | $ - 0 | |||
| Grainsize Analysis (Aggregate) | Per Each | $ - 0 | |||
| Concrete Cylinder Compressive Strength Test | Per Each | $ - 0 | |||
| Asphalt Coring Crew | Per Each | $ - 0 | |||
| Asphalt Extraction/Gradation | Per Each | $ - 0 | |||
| Vehicle Charge (Per Trip) | Trip | $ - 0 | |||
| Vehicle Charge (Mileage) | Per Mile | $ - 0 | |||
| Other | $ - 0 | ||||
| Other | $ - 0 | ||||
| Other | $ - 0 | ||||
| Lump Sum Fee Proposal Worksheet | |||||
| I. EARTHWORK OBSERVATION AND TESTING | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| NPDES Inspection | $ - 0 | $ - 0 | |||
| Vehicle/Equipment Charge | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
| TESTS | QUANTITY | UNIT RATE | UNIT | COST | |
| Grainsize Analysis | $ - 0 | $ - 0 | |||
| Atterberg Limits | $ - 0 | $ - 0 | |||
| Soils Proctor | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - EARTHWORK OBSERVATION AND TESTING $ - 0
| II. FOUNDATION OBERVATION AND TESTING | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| Vehicle/Equipment Charge | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
| TESTS | QUANTITY | UNIT RATE | UNIT | COST | |
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - FOUNDATION OBERVATION AND TESTING $ - 0
| III. CONCRETE CONSTRUCTION | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| ICC Special Inspector | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| Vehicle/Equipment Charge | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
| TESTS | QUANTITY | UNIT RATE | UNIT | COST | |
| Concrete Cylinders | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - CONCRETE CONSTRUCTION $ - 0
| IV. PAVEMENT, SIDEWALKS, MISC. SITE WORK | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| Vehicle/Equipment Charge | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
| TESTS | QUANTITY | UNIT RATE | UNIT | COST | |
| Modified Proctor | $ - 0 | $ - 0 | |||
| Grain-Size Analysis | $ - 0 | $ - 0 | |||
| Concrete Cylinders | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - PAVEMENT, SIDEWALKS, MISC. SITE WORK $ - 0
| V. ENGINEERING, REPORTING, SUPERVISION, MEETINGS | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| Clerical | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - ENGINEERING, REPORTING, SUPERVISION, MEETINGS $ - 0
| VI. MONTHLY PAY APPLICATION VERIFICATION | |||||
| PERSONNEL | QUANTITY | UNIT RATE | UNIT | COST | |
| Principal | $ - 0 | $ - 0 | |||
| Senior Engineer | $ - 0 | $ - 0 | |||
| Project Engineer | $ - 0 | $ - 0 | |||
| Engineering Technician | $ - 0 | $ - 0 | |||
| Clerical | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| Other | $ - 0 | $ - 0 | |||
| TOTAL COST | $ - 0 |
SUBTOTAL - MONTHLY PAY APPLICATION VERIFICATION $ - 0
GRAND TOTAL - LUMP SUM PROPOSAL $ - 0
REMARKS SECTION
&G &"-,Bold"&22Rhodes Street Widening & Improvements
Page &P of &N &G image1.png image2.png
Other files
| File | Type | Posted |
|---|---|---|
| Inspections & Material Testing | — | |
| Drawings | — | |
| Construction Schedule | — | |
| Bid Open Details | — | |
| Addendum No. 2 | — | |
| Award Information | — | |
| Addendum No. 1 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .