Addendum No. 2
289 KB Posted
- Attached to
- RFP Â INSPECTIONS & MATERIAL TESTING - 020822
- Solicitation number
- Not on record
- Issued by
- Fulton County, Georgia
About this file
Addendum No. 2 to RFP - Interdepartmental Software System
This is Addendum No. 2 to a Request for Sealed Proposal issued by the City of College Park, Georgia for an Interdepartmental Software System (BID #020822). The City seeks a comprehensive software solution to address permits, inspections, code enforcement, and business licensing functions across multiple departments. The system must support 28-30 internal agency users, consisting of 14 in-office users and 7 field-only users. The City has previously met with vendors including SipliGov, SageGov, Tyler Technology (New World), Iworqs System, and Open Works, and has reviewed product demonstrations for inspections, city clerk, zoning, code enforcement, and general ledger accounting functions. The original proposal deadline was February 8, 2022 at 10:30 a.m. EST.
The City currently operates Tyler Technology (New World) for permits, plan reviews, inspections, code enforcement, and business licensing, and does not seek to replace this system but rather supplement it with bi-directional interfaces. Vendors must quote three specific interfaces: one with Tyler Technology (New World), one for business license integration, and one for Laserfiche (the City's existing Electronic Document Management System). The interface with the EDMS is required regardless of whether the proposed solution includes built-in document management capabilities. The City manages eight business license types, multiple permit categories (commercial, residential, land disturbance), and enforcement record types including rezoning, variances, administrative appeals, and demolition requests. Project funding requires City Council approval. No bonds, electronic submittals, or advance insurance documentation are required. Data conversion will involve uploading and converting data from a minimum of five individual departmental data sources into the new system.
Text of this file
RFP – INTERDEPARTMENTAL SOFTWARE SYSTEM - 020822 Page 1
REQUEST FOR SEALED PROPOSAL
ADVERTISEMENT for COMPUTER SOFTWARE
RFP – INTERDEPARTMENTAL SOFTWARE SYSTEM – 020822
ADDENDUM No 2
OWNER’S BID PROPOSAL FORM
OWNER: City of College Park 3667 Main Street College Park, GA 30337
PROJECT: Interdepartmental Software System
DATE: February 3, 2022
BID #020822 is hereby revised as instructed throughout attached ADDENDUM No. 2.
This Addendum forms a part of the contract documents and modifies the original bid documents.
The following items shall take precedence over the originally published bid documents for the above named project and shall become a part of the contract documents:
1. Which potential vendors has the City met with within the past year?
a. SipliGov, SageGov, Tyler Technology (New World), Iworqs System, Open works
2. On page 16 it’s indicated that the City has seen product demonstrations in the past year.
Please specify which products were demonstrated.
a. Inspections, City Clerk, Zoining, Code Enforcement, GL Accounting
3. Have the funds for this project been approved or does it have to go before the City
Council for approval?
a. City Council has to approve
4. Will the City consider accepting electronic submittals for this RFP?
a. No
5. Does proof of insurance (general liability and worker’s comp) need to be submitted as part of the response or was this part of the standard boilerplate as indicated on page 3?
Though our insurance exceeds the RFPs requirements, the standard is for a vendor to provide these when selected.
a. No
6. The section Basis of Award (Page 9) ) lists 3 required bonds (bid, performance and payment). These are typical for constructions projects and are unusual for these types of SaaS solution projects and accompanying implementation services, as the billing for services occurs only after acceptance by the City of deliverables. Is this truly part of this
RFP – INTERDEPARTMENTAL SOFTWARE SYSTEM - 020822 Page 2
RFP, or is it part of the boilerplate template? Will the City consider removing this requirement?
a. No bonds are needed
7. What are the current systems used by the City to track: permits, plan reviews, inspections code enforcement, business licensing?
a. Tyler Technology (New World) is the current system.
8. Is the City looking to replace Tyler Technologies New World product? Page 17, letter O indicates a needed bi-directional interface.
a. No
9. Is the City looking for a complete system to address permits, inspections, code enforcement, and business licensing functions? Or is the City only looking for a plan review solution?
a. The City is looking to address permits, inspections, code enforcement, and business licensing functions
10. Page 17 indicates 10-15 users. In order to propose SaaS pricing, please provide a fixed number of internal agency users for this system. Define how many users will be in-office only, and how many will be field-only, or if there is overlap.
a. Internal agency users: 28-30
b. In-office users: 14
c. Field only users: 7
11. Does the City currently use a EDMS (Electronic Document Management System)?
a. Yes
12. If yes, will an interface to that EDMS system be required?
a. Yes
13. If the proposed solution has a built in document management/storage system, will an interface to such system still be required?
a. Yes
14. How many permit types does the City currently manage?
a. Commercial & Residential which are all broken down into categories, Land Disturbance, etc.
15. How many Planning/Zoning record types doe the City currently manage?
a. Rezoning, Variances, Administrative Appeals, Demo
16. How many Enforcement record types does the City currently manage?
a. Varies between departments
17. How many contractors are currently registered with the City?
a. Do not have an official list of registered contractors
18. Does the City manage contractor registration (Contractor License) renewals?
a. Yes when a permit is pulled
19. How many Business License types does the City currently manage?
a. Eight (8) types
20. Please define the number of interfaces to be quoted.
a. Three (3) interfaces with Tyler Technology (New World), business license and laserfiche
21. Does the City currently have an Electronic Plan Review solution? If so, what product is it?
a. No
RFP – INTERDEPARTMENTAL SOFTWARE SYSTEM - 020822 Page 3
22. Does the City have staff to develop it’s own reports if trained on the new system?
a. Yes
23. Please describe the data conversion needs. How many individual data sources will there be?
a. They will have to upload and convert all of our data from each department into their system
b. At minimum five (5)
Other files
| File | Type | Posted |
|---|---|---|
| Bid Open Details | — | |
| Inspections & Material Testing | — | |
| Drawings | — | |
| Construction Schedule | — | |
| Addendum No. 1 | — | |
| Award Information | — | |
| Exhibit B - Fee Proposal | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .