Exhibit B - Drawings.pdf

PDF 10 MB Posted

Attached to
HEERC Duct Replacement for DHU
Solicitation number
ISD-380609-RO
Issued by

About this file

This document consists of mechanical HVAC design drawings and accompanying instructional materials for the Fermi National Accelerator Laboratory, a United States Department of Energy facility.

The primary deliverable is a Mechanical HVAC Level 01 Floor Plan North (Drawing M11-01a), prepared by a consulting team including Perkins+Will, ARUP, Terra Engineering, and CCS. The drawing, dated October 31, 2023 (Record Set), illustrates the complete HVAC system layout for the first floor, including variable air volume (VAV) units, exhaust fans, supply and return ductwork, diffusers, grilles, louvers, dampers, and associated mechanical equipment. Key components include eight VAV units (VAV 1-07 through VAV 1-17), multiple exhaust fans (EF-1-02 through EF-1-10), recirculating air handling units, boiler combustion intake/exhaust systems, and humidifier systems with proper clearances to the roof. The design specifies low-leakage motorized dampers with thermal breaks, insulated plenums sloped to drain, continuous linear diffusers, and comprehensive ductwork with designated supply (SA), return (RA), and exhaust (EA) dimensions throughout the space. The second page contains a ductwork upgrade schematic detailing modifications including 2-inch insulation installation over approximately 40 linear feet, condensate drain pan installation, duct sealing, and condensate neutralizer installation. Supporting photographs document existing conditions showing duct routing relative to electrical conduit, exhaust piping adjacent to DHU-1, and condensate drain collection points requiring neutralizer addition.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDDBDD

BDDBDD

BDD

BDD

BDD

MDMD

VD

VD

VD

VD

VD

VD

VD

VD

VD VD

VD

VD

VD

VD

VD

VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD

MD

8 9 10 11 12 13 14

A'

A

B

D

E

F

C

EF-1-03

EF-1-04

EF-1-05

RAH

1-01

VAV

1-07

VAV

1-08

VAV

1-10

VAV

1-11

VAV

1-13

VAV

1-14VAV

1-15

VAV

1-17

VAV

1-16

SPACE RESERVED FOR FUTURE

RECIRCULATING AIR HANDLING

UNIT FOR CONVERSION OF

GROUND FLOOR LABS.

8" MECHANICAL BOILER

COMBUSTION INTAKE AND

EXHAUST UP TO ROOF.

PROVIDE 5' CLEAR FROM

ROOF WITH VENT CAP.

10ø SA FROM VAV ON THE GROUND

FLOOR. CONNECT TO FLOOR GRILLES

TO SERVE WEST OFFICES.

VAV

1-12

DHU

1-01

EF-1-06 TO 1-09

STACKED BELOW

EF-1-03 TO EF-1-05

EF

1-09

EF

1-10

TF

1-02

RG-1

12x12

FCU

1-03

SG-1

(490) 12x8

TYP-4

RG-1

24x16

FPB

1-06

SG-1

(240) 12x6

SG-1

(240) 12x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

SG-2

(230) 48x6

ED-1

(75) 6ø

ED-1

(75) 6ø

ED-1

(75) 8ø

12"x16"SA

12"x12"EA

"x1

2"

EA

18"øSA

12"x12"SA

16"øSA

12"øSA12"øSA

20"x20"SA32"x26"SA

"x1

2"

RA

26"x12"SA

"x1

0"

SA

"x1

0"

SA

"x1

2"

SA

32"x26"SA

"x2

6"

SA

14"øSA

EF

1-02

SG-3

(315) 18x4

TYP. 4

28"x18"SA

12"x12"SA 16"x14"SA

"ø

SA

"ø

SA

VAV

1-09

12"x12"SA 12"x12"SA 16"x16"SA

18"x16"SA16"x16"SA

SL-1

(245) 10ø

TYP-8

SL-1

(245) 10ø

TYP-8

SL-1

(245) 10ø

TYP-7

SL-1

(245) 10ø

TYP-8

12"øSA

SL-1

(235) 8ø

TYP-2

10"øSA 12"øSA

SG-1

(325) 12x8

SG-1

(325) 12x8

SG-1

(325) 12x8

FPB

1-08

SG-1

(325) 12x8

SG-1

(325) 12x8

"x1

6"

OA

HC

1-01

SG-1

(240) 12x6

TT

TT

T

T

T T T T

T

T

T

(2) EXHAUST AIR LOUVERS WITH PLENUM

(24,000 CFM EACH, 48,000 CFM TOTAL, 96.0 SF

TOTAL FREE AREA MINIMUM). PROVIDE

INSULATED PLENUM SLOPED TO DRAIN

TOWARDS LOUVER PER DETAIL.

BDD-

TYP 7

T T T T T

TO VAV G-19

T

TO VAV G-20

TO VAV G-17TO VAV G-15TO VAV G-11TO VAV G-09R

EF

ER

T

O : 1

M

-0

1b

8" x3 6"

RA

14"x10"EA

18"øSA 12"øSA

SG-1

(325) 12x8

SG-1

(325) 12x8

SG-1

(325) 12x8

6" PLUMBING HOT

WATER COMBUSTION

INTAKE AND EXHAUST

UP TO ROOF. PROVIDE

5' CLEAR FROM ROOF.

USE MANUFACTURERS

INSTALLATION

RECOMMENDATION.

6" HUMIDIFIER COMBUSTION

INTAKE AND EXHAUST UP TO

ROOF. PROVIDE 5' CLEAR

FROM ROOF WITH VENT CAP.

(1) 3'-6" x 2'-0" EXHAUST AIR LOUVERS WITH

PLENUM (625 CFM TOTAL, 1.25 SF TOTAL FREE

AREA MINIMUM). PROVIDE INSULATED

PLENUM SLOPED TO DRAIN TOWARDS

LOUVER PER DETAIL.

OUTSIDE AIR INTAKE LOUVERS WITH PLENUM,

3.0 SF TOTAL FREE AREA MINIMUM. PROVIDE

INSULATED PLENUM SLOPED TO DRAIN

TOWARDS LOUVER PER DETAIL.

"ø

SA

PROVIDE CONTINOUOUS

LINEAR DIFFUSER.

88x24 RA

24,000 CFM

90x36" EA

24,000 CFM

DSDSDS

DSDSDS

10"øSA 10"øSA

"x3

2"

EA

SL-1

(235) 8ø

TYP-2

SL-1

(235) 8ø

TYP-2

SL-2

(240) 10ø

TYP-8

UC

UCUC

UC

16"øSA

RG-1

12x12

RG-1

12x12

RG-1

12x12

62"x42"OA

DP

DD-03

DD

-0

(2) 5'-9"x 3'-10.5" MOTORIZED

DAMPER WITH LOUVER SPECIFIED

BY ARCHITECT. MOTORIZED

DAMPERS TO CONNECT TO ODH

SYSTEM CONTROLLER.

DAMPER: LOW LEAKAGE (CLASS 1A AT 1"WC)

ALUMINUM DAMPER WITH INSULATED THERMALLY-

BROKEN AIRFOIL BLADES AND THERMALLY-BROKEN

FRAME, WITH SILICON SEALS AT BLADE AND JAMB,

PROVIDED IN MULTIPLE SECTIONS AS NECESSARY

TO MEET LEAKAGE SPECIFICATION.

ACTUATOR: 2 POSITION ELECTRONIC (BRUSHLESS

DC MOTOR), TORQUE AS REQUIRED TO ATTAIN

LEAKAGE SPECIFICATIONS AS INSTALLED, WITH

SPRING RETURN TO FAIL OPEN ON LOSS OF

POWER.

INSTALLATION: DIRECT SHAFT MOUNTING OF

ACTUATOR ON EACH DAMPER SECTION IS

PREFERRED, BUT SPECIFIED LEAKAGE OF EACH

SECTION SHALL BE MAINTAINED REGARDLESS THE

ACTUATOR MOUNTING METHOD. COORDINATE

ACCESS PANELS WITH INTERIOR WALL

CONSTRUCTION. COORDINATE INSULATED

BLANKING/ CHANNEL BETWEEN SECTIONS AND AT

EDGES TO FILL THE ARCHITECTURAL OPENING

THROUGH THE WALL.

PROVIDE LINEAR BAR GRILLE IN SOFFIT.

PROVIDE BLANK OFF SECTIONS

BETWEEN ACTIVE SECTIONS TO ACT AS

RETURN TO PLENUM. REFER TO

ARCHITECTURAL DRAWINGS FOR LINEAR

LENGTHS.

14"øSA

PROVIDE ARCHITECTURAL RETURN

OPENING. REFER TO ARCHITECTURAL

DRAWINGS FOR FINAL LENGTHS.

PROVIDED TRANSFER ABOVE CEILING.

SG-3

(170) 12x4

TYP. 4

RG-1

(0)

24x24

TYP. 2

56"x24"SA

"x1

8"

SA

"x1

6"

OA

14"øSA

16"x15"SA

18"x14"SA

18"øSA

EG-1

(50) 6x6

14"øSA 16"øSA

"x1

0"

SA

"x1

6"

SA

"x1

2"

SA

18"x12"SA

18"x12"SA

12"øSA

"x2

2"

SA

T T T

SL-1

(260) 8ø

TYP-2

RL-1 RL-1 SL-1

(260) 8ø

TYP-2

SL-1

(260) 8ø

TYP-2

RL-1RL-1 SL-1

(260) 8ø

TYP-2

RL-1RL-1 SL-1

(260) 8ø

TYP-2

RL-1 RL-1 SL-1

(260) 8ø

TYP-2

RL-1 SL-1

(260) 8ø

TYP-2

RL-1RL-1 RL-1 RL-1 RL-1 RL-1 RL-1

RL-1

MECHANICAL KEY NOTES

1 PROVIDE VAV WITH TEMPERATURE SENSOR MOUNTED TO BOX FOR BASE CONDITION.

2 PROVIDE W/WMS.

CHECKED

APPROVED

DRAWN

DESIGNED

A/E CONSULTANT DATE

REVISIONS

FERMI NATIONAL ACCELERATOR LABORATORY

UNITED STATES DEPARTMENT OF ENERGY

DRAWING NO.SCALE: REV.

CONSULTANTS

35 E Upper Wacker Dr Suite1800 Chicago, IL 60601 t 312.849.5610 www.arup.com

1815 S. Meyers Road Suite 1070 Oakbrook Terrace, IL 60181 t 800.443.8607 f 630.678.0858 www.ccsdifference.com

225 W. Ohio Street 4th Floor Chicago, IL 60654 t 312.467.0123 f 312.467.0220 www.terraengineering.com

ARUP CCSTERRA

NORTH AMERICA LTD.

2-6-1

KEYPLAN

_F er m ila b_

M

EC

H _R

_d et a c he d.

rv t

As indicated M11-01a

MECHANICAL HVAC LEVEL 01 FLOOR

PLAN NORTH

DW

RT

AMP

ARUP

410 North Michigan Avenue t 312.755.0770 f 312.755.0775 www.perkinswill.com

0 4' 8' 16'

N1/8" = 1'-0"1 MECHANICAL HVAC LEVEL 01 FLOOR PLAN NORTH

REV NO ISSUE DATE

1 Record Set 10.31.2023 http://www.arup.com http://www.ccsdifference.com http://www.terraengineering.com http://www.perkinswill.com jperona Image jperona Architect jperona Cloud+ Ductwork upgrades jperona Image jperona Architect jperona Cloud+ 15' From units will be the start of the trap.

jperona Architect jperona Cloud+ Drain pan installed in the duct work.

jperona Architect jperona Cloud+ Installation of condensate neutralizer.

jperona Architect jperona Cloud+ Remove the existing insulation, seal ductwork and install new 2" insulation. Approximately 40' jperona Callout Pitch the duct towards the new trap.

jperona Image jperona Callout The duct modifications will start after the blue control conduit.

jperona Callout And will finish prior to the 3/4in electrical conduit.

jperona Architect jperona Cloud+ Duct to have the existing 2" insulation removed. The duct to be sealed water tight. After completion the duct work must be re-insulated with new 2" insulation.

jperona Image jperona Architect jperona Cloud+ Exhaust piping may need to be adjusted to create a pitch away from the DHU-1.

jperona Architect jperona Cloud+ Drain for captured condensate. A condensate neutralizer must be added.

File details come from the government source that posted it. Updated .