Exhibit B - Drawings.pdf
PDF 10 MB Posted
- Attached to
- HEERC Duct Replacement for DHU
- Solicitation number
- ISD-380609-RO
About this file
This document consists of mechanical HVAC design drawings and accompanying instructional materials for the Fermi National Accelerator Laboratory, a United States Department of Energy facility.
The primary deliverable is a Mechanical HVAC Level 01 Floor Plan North (Drawing M11-01a), prepared by a consulting team including Perkins+Will, ARUP, Terra Engineering, and CCS. The drawing, dated October 31, 2023 (Record Set), illustrates the complete HVAC system layout for the first floor, including variable air volume (VAV) units, exhaust fans, supply and return ductwork, diffusers, grilles, louvers, dampers, and associated mechanical equipment. Key components include eight VAV units (VAV 1-07 through VAV 1-17), multiple exhaust fans (EF-1-02 through EF-1-10), recirculating air handling units, boiler combustion intake/exhaust systems, and humidifier systems with proper clearances to the roof. The design specifies low-leakage motorized dampers with thermal breaks, insulated plenums sloped to drain, continuous linear diffusers, and comprehensive ductwork with designated supply (SA), return (RA), and exhaust (EA) dimensions throughout the space. The second page contains a ductwork upgrade schematic detailing modifications including 2-inch insulation installation over approximately 40 linear feet, condensate drain pan installation, duct sealing, and condensate neutralizer installation. Supporting photographs document existing conditions showing duct routing relative to electrical conduit, exhaust piping adjacent to DHU-1, and condensate drain collection points requiring neutralizer addition.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BDDBDD
BDDBDD
BDD
BDD
BDD
MDMD
VD
VD
VD
VD
VD
VD
VD
VD
VD VD
VD
VD
VD
VD
VD
VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD VD
MD
8 9 10 11 12 13 14
A'
A
B
D
E
F
C
EF-1-03
EF-1-04
EF-1-05
RAH
1-01
VAV
1-07
VAV
1-08
VAV
1-10
VAV
1-11
VAV
1-13
VAV
1-14VAV
1-15
VAV
1-17
VAV
1-16
SPACE RESERVED FOR FUTURE
RECIRCULATING AIR HANDLING
UNIT FOR CONVERSION OF
GROUND FLOOR LABS.
8" MECHANICAL BOILER
COMBUSTION INTAKE AND
EXHAUST UP TO ROOF.
PROVIDE 5' CLEAR FROM
ROOF WITH VENT CAP.
10ø SA FROM VAV ON THE GROUND
FLOOR. CONNECT TO FLOOR GRILLES
TO SERVE WEST OFFICES.
VAV
1-12
DHU
1-01
EF-1-06 TO 1-09
STACKED BELOW
EF-1-03 TO EF-1-05
EF
1-09
EF
1-10
TF
1-02
RG-1
12x12
FCU
1-03
SG-1
(490) 12x8
TYP-4
RG-1
24x16
FPB
1-06
SG-1
(240) 12x6
SG-1
(240) 12x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
SG-2
(230) 48x6
ED-1
(75) 6ø
ED-1
(75) 6ø
ED-1
(75) 8ø
12"x16"SA
12"x12"EA
"x1
2"
EA
18"øSA
12"x12"SA
16"øSA
12"øSA12"øSA
20"x20"SA32"x26"SA
"x1
2"
RA
26"x12"SA
"x1
0"
SA
"x1
0"
SA
"x1
2"
SA
32"x26"SA
"x2
6"
SA
14"øSA
EF
1-02
SG-3
(315) 18x4
TYP. 4
28"x18"SA
12"x12"SA 16"x14"SA
"ø
SA
"ø
SA
VAV
1-09
12"x12"SA 12"x12"SA 16"x16"SA
18"x16"SA16"x16"SA
SL-1
(245) 10ø
TYP-8
SL-1
(245) 10ø
TYP-8
SL-1
(245) 10ø
TYP-7
SL-1
(245) 10ø
TYP-8
12"øSA
SL-1
(235) 8ø
TYP-2
10"øSA 12"øSA
SG-1
(325) 12x8
SG-1
(325) 12x8
SG-1
(325) 12x8
FPB
1-08
SG-1
(325) 12x8
SG-1
(325) 12x8
"x1
6"
OA
HC
1-01
SG-1
(240) 12x6
TT
TT
T
T
T T T T
T
T
T
(2) EXHAUST AIR LOUVERS WITH PLENUM
(24,000 CFM EACH, 48,000 CFM TOTAL, 96.0 SF
TOTAL FREE AREA MINIMUM). PROVIDE
INSULATED PLENUM SLOPED TO DRAIN
TOWARDS LOUVER PER DETAIL.
BDD-
TYP 7
T T T T T
TO VAV G-19
T
TO VAV G-20
TO VAV G-17TO VAV G-15TO VAV G-11TO VAV G-09R
EF
ER
T
O : 1
M
-0
1b
8" x3 6"
RA
14"x10"EA
18"øSA 12"øSA
SG-1
(325) 12x8
SG-1
(325) 12x8
SG-1
(325) 12x8
6" PLUMBING HOT
WATER COMBUSTION
INTAKE AND EXHAUST
UP TO ROOF. PROVIDE
5' CLEAR FROM ROOF.
USE MANUFACTURERS
INSTALLATION
RECOMMENDATION.
6" HUMIDIFIER COMBUSTION
INTAKE AND EXHAUST UP TO
ROOF. PROVIDE 5' CLEAR
FROM ROOF WITH VENT CAP.
(1) 3'-6" x 2'-0" EXHAUST AIR LOUVERS WITH
PLENUM (625 CFM TOTAL, 1.25 SF TOTAL FREE
AREA MINIMUM). PROVIDE INSULATED
PLENUM SLOPED TO DRAIN TOWARDS
LOUVER PER DETAIL.
OUTSIDE AIR INTAKE LOUVERS WITH PLENUM,
3.0 SF TOTAL FREE AREA MINIMUM. PROVIDE
INSULATED PLENUM SLOPED TO DRAIN
TOWARDS LOUVER PER DETAIL.
"ø
SA
PROVIDE CONTINOUOUS
LINEAR DIFFUSER.
88x24 RA
24,000 CFM
90x36" EA
24,000 CFM
DSDSDS
DSDSDS
10"øSA 10"øSA
"x3
2"
EA
SL-1
(235) 8ø
TYP-2
SL-1
(235) 8ø
TYP-2
SL-2
(240) 10ø
TYP-8
UC
UCUC
UC
16"øSA
RG-1
12x12
RG-1
12x12
RG-1
12x12
62"x42"OA
DP
DD-03
DD
-0
(2) 5'-9"x 3'-10.5" MOTORIZED
DAMPER WITH LOUVER SPECIFIED
BY ARCHITECT. MOTORIZED
DAMPERS TO CONNECT TO ODH
SYSTEM CONTROLLER.
DAMPER: LOW LEAKAGE (CLASS 1A AT 1"WC)
ALUMINUM DAMPER WITH INSULATED THERMALLY-
BROKEN AIRFOIL BLADES AND THERMALLY-BROKEN
FRAME, WITH SILICON SEALS AT BLADE AND JAMB,
PROVIDED IN MULTIPLE SECTIONS AS NECESSARY
TO MEET LEAKAGE SPECIFICATION.
ACTUATOR: 2 POSITION ELECTRONIC (BRUSHLESS
DC MOTOR), TORQUE AS REQUIRED TO ATTAIN
LEAKAGE SPECIFICATIONS AS INSTALLED, WITH
SPRING RETURN TO FAIL OPEN ON LOSS OF
POWER.
INSTALLATION: DIRECT SHAFT MOUNTING OF
ACTUATOR ON EACH DAMPER SECTION IS
PREFERRED, BUT SPECIFIED LEAKAGE OF EACH
SECTION SHALL BE MAINTAINED REGARDLESS THE
ACTUATOR MOUNTING METHOD. COORDINATE
ACCESS PANELS WITH INTERIOR WALL
CONSTRUCTION. COORDINATE INSULATED
BLANKING/ CHANNEL BETWEEN SECTIONS AND AT
EDGES TO FILL THE ARCHITECTURAL OPENING
THROUGH THE WALL.
PROVIDE LINEAR BAR GRILLE IN SOFFIT.
PROVIDE BLANK OFF SECTIONS
BETWEEN ACTIVE SECTIONS TO ACT AS
RETURN TO PLENUM. REFER TO
ARCHITECTURAL DRAWINGS FOR LINEAR
LENGTHS.
14"øSA
PROVIDE ARCHITECTURAL RETURN
OPENING. REFER TO ARCHITECTURAL
DRAWINGS FOR FINAL LENGTHS.
PROVIDED TRANSFER ABOVE CEILING.
SG-3
(170) 12x4
TYP. 4
RG-1
(0)
24x24
TYP. 2
56"x24"SA
"x1
8"
SA
"x1
6"
OA
14"øSA
16"x15"SA
18"x14"SA
18"øSA
EG-1
(50) 6x6
14"øSA 16"øSA
"x1
0"
SA
"x1
6"
SA
"x1
2"
SA
18"x12"SA
18"x12"SA
12"øSA
"x2
2"
SA
T T T
SL-1
(260) 8ø
TYP-2
RL-1 RL-1 SL-1
(260) 8ø
TYP-2
SL-1
(260) 8ø
TYP-2
RL-1RL-1 SL-1
(260) 8ø
TYP-2
RL-1RL-1 SL-1
(260) 8ø
TYP-2
RL-1 RL-1 SL-1
(260) 8ø
TYP-2
RL-1 SL-1
(260) 8ø
TYP-2
RL-1RL-1 RL-1 RL-1 RL-1 RL-1 RL-1
RL-1
MECHANICAL KEY NOTES
1 PROVIDE VAV WITH TEMPERATURE SENSOR MOUNTED TO BOX FOR BASE CONDITION.
2 PROVIDE W/WMS.
CHECKED
APPROVED
DRAWN
DESIGNED
A/E CONSULTANT DATE
REVISIONS
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
DRAWING NO.SCALE: REV.
CONSULTANTS
35 E Upper Wacker Dr Suite1800 Chicago, IL 60601 t 312.849.5610 www.arup.com
1815 S. Meyers Road Suite 1070 Oakbrook Terrace, IL 60181 t 800.443.8607 f 630.678.0858 www.ccsdifference.com
225 W. Ohio Street 4th Floor Chicago, IL 60654 t 312.467.0123 f 312.467.0220 www.terraengineering.com
ARUP CCSTERRA
NORTH AMERICA LTD.
2-6-1
KEYPLAN
_F er m ila b_
M
EC
H _R
_d et a c he d.
rv t
As indicated M11-01a
MECHANICAL HVAC LEVEL 01 FLOOR
PLAN NORTH
DW
RT
AMP
ARUP
410 North Michigan Avenue t 312.755.0770 f 312.755.0775 www.perkinswill.com
0 4' 8' 16'
N1/8" = 1'-0"1 MECHANICAL HVAC LEVEL 01 FLOOR PLAN NORTH
REV NO ISSUE DATE
1 Record Set 10.31.2023 http://www.arup.com http://www.ccsdifference.com http://www.terraengineering.com http://www.perkinswill.com jperona Image jperona Architect jperona Cloud+ Ductwork upgrades jperona Image jperona Architect jperona Cloud+ 15' From units will be the start of the trap.
jperona Architect jperona Cloud+ Drain pan installed in the duct work.
jperona Architect jperona Cloud+ Installation of condensate neutralizer.
jperona Architect jperona Cloud+ Remove the existing insulation, seal ductwork and install new 2" insulation. Approximately 40' jperona Callout Pitch the duct towards the new trap.
jperona Image jperona Callout The duct modifications will start after the blue control conduit.
jperona Callout And will finish prior to the 3/4in electrical conduit.
jperona Architect jperona Cloud+ Duct to have the existing 2" insulation removed. The duct to be sealed water tight. After completion the duct work must be re-insulated with new 2" insulation.
jperona Image jperona Architect jperona Cloud+ Exhaust piping may need to be adjusted to create a pitch away from the DHU-1.
jperona Architect jperona Cloud+ Drain for captured condensate. A condensate neutralizer must be added.
File details come from the government source that posted it. Updated .